trinityboringsolutions.com

Roaring Springs Texas Directional Boring: Miles Loamy Fine Sand, FM 684 and Dutchman Creek

Quick Answer: FM 684 is the main state road a utility route may have to cross, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Roaring Springs, Texas. From our Yukon, Oklahoma main office, the 290 road miles to Roaring Springs can shape mobilization for work near 2nd Street. The USDA soil survey maps Miles soil across 35 percent of town, with loamy fine sand common at the surface. At about 40 inches, sandy clay loam is mapped under 65 percent of the area, so crews plan for clay that can cling to a reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Roaring Springs bores at a glance

  • Incorporated city in Motley County, Texas. Population 204 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 290 miles, about 5.7 hours of driving.
  • Ground: Miles soil is mapped on 35 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 684, FM 3203, Loop 42 and Texas State Highway 70. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Roaring Springs, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone do directional boring in Roaring Springs near Dutchman Creek?

FM 684 is the main state road a utility route may need to cross in Roaring Springs. We take directional boring work in Motley County, where the Census Bureau Vintage 2024 estimate puts the population at 204. We install water, sewer, gas, electric conduit and fiber lines along streets such as 2nd Street and 3rd Street, or across a route near Dutchman Creek.

Our main office is in Yukon, Oklahoma, and Roaring Springs work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965 and took up directional boring in 1982; the range from 3/4 inch service lines to 48 inch casing suits work from a 2nd Street service to a larger FM 684 crossing.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Miles soil affect drilling in Roaring Springs?

Miles soil is the largest mapped soil series in Roaring Springs, covering 35 percent of the town area in the USDA soil survey. The named map unit Miles loamy fine sand, 0 to 3 percent slopes, covers 23 percent. Loamy fine sand makes up 48 percent of surface texture, while fine sandy loam and clay loam each account for 22 percent. At about 40 inches below the surface, sandy clay loam is mapped under 65 percent of the area. That mix calls for a plan that keeps sandy ground supported while managing clay that can cling to tooling.

USDA soil survey, inside the Roaring Springs city limitsWhat is mapped
Soil series mappedMiles 35 percent, Gageby 22 percent, Springer 10 percent, Flomot 9 percent and Westola 9 percent
Texture at the surfaceloamy fine sand 48 percent, fine sandy loam 22 percent and clay loam 22 percent
Texture about 40 inches downsandy clay loam 65 percent, fine sandy loam 19 percent and loam 9 percent
Engineering class about 40 inches downlean clay (CL) 70 percent, silty clayey sand (SC SM) 19 percent and silty sand (SM) 7 percent
Average clay content about 40 inches down23 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils37 percent of the area
High corrosion risk for uncoated steel0 percent of the area

On 3rd Street, we treat the unmapped top five feet as no assurance against deeper rock during boring. Seasonal water tables are not mapped in that depth, but flood prone soils cover 37 percent, so a route near Dutchman Creek needs attention to channel depth. For conduit planning along 2nd Street, we treat high steel corrosion risk as unmapped, not as evidence of no risk. The geology map names the Pleistocene Lingos Formation and Late Permian sedimentary rock of Wuchiapingian age; mapped soil is not a substitute for checking actual conditions along a bore.

How do crews handle sandy clay loam in Roaring Springs?

Roaring Springs has sandy clay loam mapped under about 40 inches across much of the area, with loamy fine sand common at the surface. We match the fluid and reaming plan to the ground along each street or FM 684 route.

  1. In Miles loamy fine sand, we use drilling fluid to support the hole and ream in stages, with the pipe ready before the final pass.
  2. Where sandy clay loam is mapped below the surface, we adjust fluid and reaming to limit sticky cuttings and keep the bore moving.
  3. Near the 37 percent of town mapped as flood prone soils, we plan the bore depth around drainage and keep a Dutchman Creek route under the channel.
  4. At FM 684 or 3rd Street, we track the drill head from above ground and log depth and pitch as the bore advances.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What does a bore have to cross in Roaring Springs near FM 684?

FM 684, FM 3203, Loop 42 and Texas State Highway 70 run within Roaring Springs, so a route may involve city streets as well as state highway right of way. The mapped roadway lengths inside town are 1.7 miles for FM 684, 1.3 miles for FM 3203, 1.2 miles for Loop 42 and 1.0 mile for Texas State Highway 70. 3rd Street is the longest named street at 1.28 miles, followed by 2nd Street at 0.79 miles and Broadway at 0.67 miles. These routes help locate possible launch and exit areas.

CrossingTypeMapped extentWho has a say
FM 684State highway1.7 roadway miles insideState highway office
FM 3203State highway1.3 roadway miles insideState highway office
Loop 42State highway1.2 roadway miles insideState highway office
Texas State Highway 70State highway1 roadway miles insideState highway office
Dutchman CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Roaring Springs or within 1 mile outside its limits, so a track crossing is not part of the mapped local route. Dutchman Creek runs along or touches the town boundary, while no named stream is mapped inside town. The map shows 1.62 miles of unnamed drainage within town and no mapped street crossings of named streams. For boring near Dutchman Creek, we distinguish the creek from mapped lakes and ponds; none are mapped within 1 mile. A route near Dutchman Creek still needs planning for the channel and access.

Whose permission does a Roaring Springs bore in Motley County need?

A bore under FM 684 or another state route in Roaring Springs needs a TxDOT utility permit for work in the right of way. The utility owner, not the drilling contractor, applies through TxDOT’s online RULIS system, and the TxDOT Childress District reviews the filing. We prepare the bore plan and profile for the utility owner’s application and work under its permit. The state cover rules set depth: electric and communication lines need 60 inches at highway crossings, while water lines need 60 inches and pressurized sewer lines need 60 inches. City streets belong to the incorporated town. No railroad is mapped locally, and Dutchman Creek is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the City of Roaring Springs water system and nearby lines?

The City of Roaring Springs public water system is owned by local government and draws from groundwater wells. Public records list 160 service connections and 219 people served, so a proposed water bore along 2nd Street should be planned with the system’s buried lines in mind. Electric providers reporting service in Motley County are AEP Texas North, Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative. Before planning an electric conduit bore along FM 684, we confirm the line owner for the specific address.

Line ownerWhat it isSourceSize
City of Roaring SpringsPublic water systemGroundwater wells160 connections, 219 people served
AEP Texas North, Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Motley CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Roaring Springs’ median housing year at 1958. For Roaring Springs underground work, we use survey estimates: 55 percent of homes were built before 1960, 42 percent from 1960 to 1999 and 3 percent in 2000 or later. A water replacement along 3rd Street may meet older buried services, while a newer connection can require a different route. We hydrovac pothole marked utilities on the bore path before drilling near them; paint does not show line depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Roaring Springs and nearby Dickens?

Roaring Springs is an incorporated town in Motley County, at an elevation of 2,504 feet and covering 1.06 square miles. Its ZIP code is 79256. Matador, the county seat, is 8.3 miles north; Dickens is 19.2 miles south. Floydada is 28.2 miles west, while Crosbyton is 28.2 miles southwest. From our Yukon, Oklahoma main office, the town is 290 road miles away and a 5.7 hour drive. Those distances matter when we plan equipment and crew mobilization for a bore on FM 684 or a town street.

Places near Roaring Springs

What boring work comes up in Roaring Springs near 2nd Street?

  • Highway crossing: A route beneath FM 684 needs a bore plan that accounts for the state right of way and the highway’s required cover.
  • Water service: A connection near 2nd Street can be routed to avoid the City of Roaring Springs groundwater lines after they are located and exposed.
  • Fiber conduit: A fiber bore along 3rd Street can pass below pavement while pits remain in the dirt at each end.
  • Creek crossing: A route near Dutchman Creek needs depth planning around the channel and a check for Corps jurisdiction during planning.
  • Street service: A sewer or water line along Broadway can be bored beneath the street rather than opened across its paved surface.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore in Roaring Springs near 3rd Street?

For a Roaring Springs quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route on 3rd Street or near FM 684 shows us where to assess access, nearby utilities and possible crossings before we set the bore plan.

The route and scope drive the price, not one detail alone. Miles loamy fine sand and sandy clay loam can call for different fluid and reaming plans. A crossing under FM 684 adds highway permit and cover planning, while pavement, exposed utilities and creek or drainage crossings can add work. Pit size, excavator time, sand backfill, pipe size and footage also matter. The 290 road miles from Yukon affect mobilization, and high profile or emergency timing changes the work plan.

Questions people ask about boring in Roaring Springs

Does Trinity take directional boring work in Roaring Springs and Motley County, and who staffs it?

Yes. We take directional boring work in Roaring Springs and staff it with our own crews or from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including for a route near 2nd Street or FM 684.

Will a bore on FM 3203 in Roaring Springs hit rock?

The USDA soil survey does not map bedrock in the top five feet of Roaring Springs, but that does not rule out rock deeper down. The geology map includes the Pleistocene Lingos Formation and Late Permian sedimentary rock. A bore near Miles soil still needs its path planned for the conditions encountered.

Who approves a bore under FM 684 in Roaring Springs?

The utility owner applies for a TxDOT utility permit through RULIS for work under FM 684, and the TxDOT Childress District reviews it. We prepare the bore plan and profile for that application. The permit’s required cover depth helps set the planned bore profile beneath the highway.

Can a utility line be bored under Dutchman Creek near Roaring Springs?

A bore can be planned for a route beneath Dutchman Creek, which runs along or touches the Roaring Springs boundary. The channel depth must shape the bore profile, and creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. Flood prone soils cover 37 percent of the town area.

Who runs the Roaring Springs water system, and where does its water come from?

For utility planning in Motley County, we account for the Roaring Springs public water system, owned by the City of Roaring Springs and supplied by groundwater wells. We use the public records’ 160 service connections and 219 people served as utility context, not a count of planned bore crossings in Roaring Springs. That network matters when we plan a water bore near 2nd Street because existing lines need to be located along the proposed path.

Which electric providers report service in Motley County near Roaring Springs?

AEP Texas North, Southwestern Public Service, Lighthouse Electric Cooperative and South Plains Electric Cooperative report electric service in Motley County. The provider for a particular Roaring Springs address must be confirmed before planning conduit. We expose marked utilities along the bore path before drilling near them.

How much notice does Texas811 need for a Roaring Springs bore near 3rd Street?

For work near 3rd Street, Texas law requires a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For permits through TxDOT Childress District, we submit a new request if the start slips more than 14 days past the original notice. Along Broadway, we have worn or moved marks refreshed through Texas811 before continuing boring work.

How far is Roaring Springs from the Yukon office, and does that affect a bore?

We plan around the 290 road miles and 5.7 hour drive from our Yukon, Oklahoma main office to Roaring Springs. That distance can affect mobilization for a job near FM 684 or Dutchman Creek. The route, equipment needs and access help us plan the trip and the work.

What affects the cost of directional boring under FM 684 in Roaring Springs?

The job details set the price for an FM 684 bore. Length, pipe or conduit size, Miles soil, exposed utilities, pavement, drainage crossings, pits and backfill all affect the work. A state highway crossing also brings permit and cover planning, and the 290 road miles from Yukon affect mobilization.

Where the Roaring Springs facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Roaring Springs

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Roaring Springs, Texas

Type the address of your job in Roaring Springs. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Roaring Springs

All counties: Texas county list.