trinityboringsolutions.com

Newark Texas Directional Boring: Blanket Clay Loam, FM 718 and Derrett Creek

Quick Answer: Blanket clay loam is common in Newark, and heavy clay can grip a drill string. Trinity Boring Solutions takes directional boring and horizontal directional drilling (HDD) work in Texas for crossings such as Derrett Creek and Union Pacific track. Newark is 207 road miles from our Yukon, Oklahoma office, with FM 718 among the local routes to plan around. At 40 inches, the USDA soil survey maps 35 percent as sandy clay loam, while heavy clay can cling to the reamer.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Newark bores at a glance

  • Incorporated city in Wise County and Tarrant County, Texas. Population 1,288 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 207 miles, about 4.1 hours of driving.
  • Ground: Blanket soil is mapped on 25 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 14 percent of the area.
  • Highways inside the boundary: FM 718 and FM 3433. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Derrett Creek and Moss Branch.
  • Public water: City of Newark, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Newark, Wise County?

Blanket clay loam and heavy clay shape the directional boring work Trinity takes in Newark, Wise County. The Census Bureau Vintage 2024 estimate puts the city population at 1,288. We install water, sewer, gas, electric conduit and fiber along routes such as Central Avenue and FM 718, with the bore path planned around existing lines and the ground beneath each street.

Our main office is in Yukon, Oklahoma, and Newark work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A Newark job is typically a shorter service or utility crossing, with the soil and streets such as Avondale Haslet Road shaping the plan. Our family business began in 1965, and we have done directional boring since 1982 when planning work in Newark.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Newark have, including Blanket soil?

Newark has mapped Blanket clay loam, which can hold an open bore but stick to the reamer. The USDA soil survey maps the Blanket series across 25 percent of the city and clay loam as the surface texture across 30 percent. At about 40 inches below the surface, sandy clay loam is mapped across 35 percent, with clay loam across 25 percent. Average clay content at that depth is 35 percent, and heavy clay is mapped across 51 percent. These are mapped patterns, not test borings, so conditions can vary along a route such as Seven Hills Road.

USDA soil survey, inside the Newark city limitsWhat is mapped
Soil series mappedBlanket 25 percent, Venus 17 percent, Duffau 13 percent, Frio 9 percent and Sanger 8 percent
Texture at the surfaceclay loam 30 percent, loam 17 percent and clay 14 percent
Texture about 40 inches downsandy clay loam 35 percent, clay loam 25 percent and bedrock 14 percent
Engineering class about 40 inches downfat clay (CH) 51 percent and lean clay (CL) 36 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inches14 percent of the area (8 percent hard rock, 5 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel27 percent of the area

The USDA soil survey maps bedrock within 40 inches across 14 percent of Newark, with typical bedrock depth listed as 26 inches. Hard bedrock is mapped within 60 inches across 8 percent, so a route near Derrett Creek may need a slower approach if it meets rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 9 percent. High steel corrosion risk covers 27 percent, a consideration for casing and tracer wire. The Paluxy Sand map unit is Early Cretaceous sandstone, mudstone and limestone, which can mean a change in drilling resistance.

How do crews handle Newark’s sandy clay loam?

We adjust the bore plan to Newark’s mapped sandy clay loam and heavy clay, rather than treating every stretch of FM 718 as the same ground. Derrett Creek and nearby drainage also affect route depth and setup.

  1. On Newark routes through heavy clay, we use a thinner drilling fluid with polymer and ream in stages to limit sticky cuttings around the tool.
  2. Where the Newark soil survey maps sandy clay loam, we manage fluid returns carefully and have the pipe ready before the final reaming pass.
  3. For a route near Derrett Creek, we plan depth below the channel and check for U.S. Army Corps of Engineers jurisdiction during planning.
  4. Before drilling near a marked line on Central Avenue, we hydrovac pothole to see its depth; a walkover locator tracks the head and records depth and pitch.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Which roads, tracks or creeks may a Newark bore cross near Derrett Creek?

FM 718 and FM 3433 run through Newark, while US 81 and US 287 are each 1.0 mile outside the city limits. US 287 Business is 1.3 miles away. A bore under an existing state highway pavement must use boring or tunneling, and rural highway crossings extend under all travel lanes. Avondale Haslet Road is the longest named street in the city at 1.47 miles. Ramhorn Hill Road and Seven Hills Road also offer local route options, so the exact address matters when laying out a crossing.

CrossingTypeMapped extentWho has a say
FM 718State highway4.2 roadway miles insideState highway office
FM 3433State highway1.4 roadway miles insideState highway office
US 81Highway nearby1 miles outsideState highway office
US 287Highway nearby1 miles outsideState highway office
US 287 BusinessHighway nearby1.3 miles outsideState highway office
Union PacificRailroad1.7 track miles insideThe railroad
Derrett CreekStream0.79 channel miles insideChecked for Corps of Engineers jurisdiction
Moss BranchStream0.03 channel miles insideChecked for Corps of Engineers jurisdiction
Indian CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Oates BranchStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Moss CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
West Fork Trinity RiverStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Eagle Mountain LakeLake or pond8,186 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 1.7 track miles in Newark on its Duncan Subdivision, and public records map four street and rail crossings in the city. Derrett Creek runs for 0.79 channel miles within the limits, with five mapped street crossings of named streams citywide. Moss Branch is also mapped in the city. Eagle Mountain Lake is within one mile but outside the limits. A creek route needs a depth plan that stays below the channel and a jurisdiction check during planning.

Who has to sign off on Newark bores near Union Pacific?

FM 718 and FM 3433 are state highways, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Fort Worth District. The utility owner, not our crew, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing. TxDOT rules set minimum cover by line type and crossing, and the permit can specify different depths. A crossing of the Union Pacific Duncan Subdivision requires an agreement with the railroad, which establishes crossing conditions. For Derrett Creek, planning includes checking whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. Since Newark is incorporated, we plan city street boring with the city as the street owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Newark water system?

The City of Newark public water system draws from groundwater wells and serves 1,232 people through 374 service connections. Those service lines can share street corridors with proposed work along Central Avenue or FM 718, so the route must be checked before drilling. Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative report electric service in Wise County. Before planning an electric conduit bore at a Newark address, we confirm the line owner for that location.

Line ownerWhat it isSourceSize
City of NewarkPublic water systemGroundwater wells374 connections, 1,232 people served
Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric CooperativeElectric utilities reporting service in Wise County and Tarrant CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use Newark’s 1994 median housing year from the American Community Survey 2019 to 2023 five year estimates to plan around existing underground work. It estimates 5 percent of homes were built before 1960, 59 percent from 1960 to 1999 and 36 percent in 2000 or later. That mix can mean work ranges from older service replacement to newer connections near Avondale Haslet Road. Before the drill approaches a marked line, we use hydrovac potholing to expose it; paint on the surface does not show its depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Newark from Aurora and the areas we cover?

Newark is an incorporated city in Wise County and Tarrant County, with 96 percent of its area in Wise County. It covers 0.89 square miles at an elevation of 744 feet, and its ZIP codes are 76071 and 76179. Aurora is 3.2 miles northwest, Pecan Acres is 3.2 miles south, and Rhome is 4.5 miles north. Briar, the nearest larger city, is 5.1 miles west; Decatur, the Wise County seat, is 15.7 miles north. From our Yukon yard, Newark is 207 road miles and a 4.1 hour drive, which affects mobilization for work on FM 718.

Places near Newark

What kinds of bores come up on Newark’s Avondale Haslet Road?

  • Highway crossing: A bore beneath FM 718 can pass under existing pavement without cutting across the roadway.
  • Water service: A connection near the City of Newark system can be routed along Central Avenue after existing lines are exposed.
  • Fiber drop: A route serving a property along Avondale Haslet Road can use a bore to avoid open trenching across pavement.
  • Creek crossing: A Derrett Creek route needs a depth plan below the channel and a jurisdiction check during planning.
  • Rail crossing: A bore beneath the Union Pacific track needs an agreement that sets the crossing conditions.
  • Street crossing: A Seven Hills Road bore can leave the surface uncut while pits sit in the dirt on each side.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Newark’s Central Avenue?

For a Newark quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route near Central Avenue also needs to show nearby streets, marked utilities and any pavement or drainage crossing. That lets us assess the actual bore path instead of estimating from the street name alone.

The Newark job details set the price through ground conditions, crossings and logistics. Blanket clay loam and the mapped heavy clay can affect drilling time and reaming. A Union Pacific crossing or work near Derrett Creek adds planning and exposure considerations. Pavement, concrete, pits, excavator time and sand backfill also change the scope. Mobilization matters because Newark is 207 road miles from Yukon, and high profile or emergency work can require a different plan.

Questions people ask about boring in Newark

Does Trinity Boring Solutions take Newark jobs in Wise County, and who does the work?

Yes. We take directional boring work in Newark, Wise County, and keep the customer in contact with Trinity from the first call through the bore log. Our own crews and partner contractor crews we have vetted handle the work. For a route near FM 718, the crew on site follows the plan and reports back through Trinity.

What do we need for a Newark bore beneath Union Pacific track?

A crossing of the Union Pacific Duncan Subdivision needs an agreement with the railroad that owns the track. For a Newark crossing beneath Union Pacific track, we follow the agreement’s casing, depth and flagging conditions. Newark has 1.7 track miles of Union Pacific line, so the route and crossing location should be identified before the bore plan is prepared.

Can a utility line be bored beneath Derrett Creek in Newark?

A bore beneath Derrett Creek can be considered if the route, depth and ground support work for the site. The creek runs 0.79 channel miles in Newark, and planning includes checking for U.S. Army Corps of Engineers jurisdiction. Flood prone soils are mapped across 9 percent of the city, so the crossing needs site specific planning.

Who runs Newark’s public water system, and where does its water come from before we plan a bore?

The City of Newark owns the public water system, which draws water from groundwater wells. Newark’s system serves 1,232 people through 374 service connections, and we account for that scale when planning underground work. A proposed bore near Central Avenue should account for water lines and connections along the route, with marked utilities exposed before drilling close to them.

Which electric company serves my Newark address in Wise County?

The specific line owner must be confirmed for the address before planning a conduit bore. Oncor Electric Delivery Company and several cooperatives report electric service in Wise County, but that does not identify the provider at every Newark property. If the route follows FM 3433, we need the applicable owner identified before finalizing the bore plan.

Does Newark control Seven Hills Road, and can a bore avoid cutting it?

Newark is incorporated, so its city streets, including Seven Hills Road, belong to the city. Directional boring can carry a line beneath a street without cutting its surface, with entry and exit pits placed off the pavement. The route still needs to account for marked utilities and the street conditions at the specific crossing.

How far is Newark from Trinity’s Yukon office, and does Briar affect the job?

Newark is 207 road miles from our Yukon, Oklahoma main office, with a 4.1 hour drive. Briar is 5.1 miles west of Newark and can help place the job geographically, but mobilization is based on the Newark site and work scope. A route near FM 718 may need different equipment and setup from a shorter service bore.

How much notice does Texas811 need for a Newark bore near Avondale Haslet Road?

For a bore near Avondale Haslet Road, request a locate through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. Do not submit more than 14 days before the planned start. If the start slips more than 14 days beyond the original notice, make a new request; have worn or moved marks refreshed through Texas811 before work continues.

What affects the price of directional boring in Newark near FM 718?

The route and scope determine the price, not just its length. Newark’s heavy clay can affect drilling and reaming, while a crossing of FM 718 or Union Pacific track adds planning. Pipe size, exposed utilities, pavement, creek crossings, pits, excavator time, backfill and mobilization from Yukon also shape the job.

Where the Newark facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Newark

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Newark, Texas

Type the address of your job in Newark. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Newark

Same county: Decatur · Bridgeport · Boyd · Runaway Bay · New Fairview · Alvord · Chico · Paradise · Lake Bridgeport. All counties: Texas county list.