Grandfalls Texas Directional Boring: Ima Soil, North Lateral Canal, Highway 18
Quick Answer: We do directional boring, also called horizontal directional drilling (HDD), in Grandfalls, where a route may pass beneath the North Lateral Canal. The 502 road miles from our Yukon, Oklahoma main office matter for mobilization to Texas State Highway 18. Ima fine sandy loam is the main mapped soil, and loose sand can cave behind the drill head. Staged reaming and drilling fluid help keep the bore open near A Avenue.
Grandfalls bores at a glance
- Incorporated city in Ward County, Texas. Population 328 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 502 miles, about 9.8 hours of driving.
- Ground: Ima soil is mapped on 92 percent of the area, with fine sandy loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 18 and Texas State Highway 329. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: North Lateral Canal.
- Public water: City of Grandfalls, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring beneath Texas State Highway 18 in Grandfalls?
Ima fine sandy loam is the main mapped ground, and we take directional boring work in Grandfalls, Ward County. The Census Bureau Vintage 2024 estimate puts the town’s population at 328. Water, sewer, gas, electric conduit and fiber can run beneath streets such as A Avenue or connect properties near Texas State Highway 18.
Our main office is in Yukon, Oklahoma, and Grandfalls work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Grandfalls, our range runs from a 3/4 inch service line along G Avenue to 48 inch casing for a North Lateral Canal crossing. Our family business began in 1965, and since 1982 we have done directional boring for Grandfalls projects 502 road miles from our Yukon main office.

What is the Ima soil in Grandfalls like to bore?
Ima soil covers most of the mapped ground in Grandfalls, with Ima fine sandy loam, 0 to 3 percent slopes, mapped across 92 percent of the town. At about 40 inches below the surface, the USDA soil survey maps fine sandy loam across 92 percent of the area and an average clay content of 15 percent. This sand rich material cuts readily, but the bore can cave behind the bit. Soil mapping describes broad patterns, not test borings at a proposed route on Avenue D.
| USDA soil survey, inside the Grandfalls city limits | What is mapped |
|---|---|
| Soil series mapped | Ima 92 percent and Hodgins 7 percent |
| Texture at the surface | fine sandy loam 92 percent and clay loam 7 percent |
| Texture about 40 inches down | fine sandy loam 92 percent and clay loam 7 percent |
| Engineering class about 40 inches down | clayey sand (SC) 92 percent and lean clay (CL) 7 percent |
| Average clay content about 40 inches down | 15 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 7 percent of the area |
Bedrock is not mapped within 60 inches in Grandfalls, though that does not rule out rock deeper down. Seasonal water table and flood prone soils are not mapped, but the North Lateral Canal still needs site specific planning. High steel corrosion risk is mapped across 7 percent of the area, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel concern. The geologic map includes Holocene alluvium along streams and Paleocene Cenozoic sedimentary rocks, so ground can vary near the canal.
How do we bore Grandfalls fine sandy loam?
In Grandfalls, fine sandy loam and the North Lateral Canal call for a bore plan that accounts for loose soil and the crossing. We track the drill head from the surface and log its depth and pitch as it advances.
- The USDA soil survey maps fine sandy loam across 92 percent of Grandfalls, so we plan staged reaming and have the pipe ready before the final pass.
- Every marked utility on a Grandfalls bore path is exposed by hydrovac before drilling near it; locate paint near A Avenue shows position, not depth.
- For a route near the North Lateral Canal, we track the drill head from the surface and log depth and pitch as the bore advances.
- The 7 percent mapped high steel corrosion risk in Grandfalls is a reason for the line owner to consider casing and tracer wire materials.

What does a bore have to cross in Grandfalls near North Lateral Canal?
A Grandfalls bore may cross Texas State Highway 18 or Texas State Highway 329, both mapped inside town limits. A route under existing highway pavement uses boring or tunneling rather than an open cut. TxDOT rules require the bore to extend beneath all travel lanes on rural highways. Among named streets, Avenue D runs 1.06 miles in town, A Avenue runs 0.92 miles and G Avenue runs 0.76 miles, so street routes need their own access and utility checks.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 18 | State highway | 1.1 roadway miles inside | State highway office |
| Texas State Highway 329 | State highway | 0.2 roadway miles inside | State highway office |
| North Lateral Canal | Stream | 0.47 channel miles inside | Checked for Corps of Engineers jurisdiction |
| South Lateral Canal | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Grandfalls Canal | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Grandfalls or within 1 mile outside its limits, and no mapped street and rail crossing is listed. The North Lateral Canal runs 0.47 miles through town, and six mapped street crossings intersect named streams. A bore beneath the canal can avoid cutting the channel banks; during planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction. With North Lateral Canal inside town limits, we account for it in directional boring plans; no lakes or ponds are mapped within 1 mile.
Who has to sign off on a Grandfalls bore in Ward County?
For a bore under Texas State Highway 18 or Texas State Highway 329 in Grandfalls, the line owner, not the driller, submits the utility permit application through TxDOT’s online RULIS system. The TxDOT Odessa District reviews it. We prepare the bore plan and profile for the owner’s application and work under its permit. TxDOT cover requirements depend on the line: electric and communication crossings need 60 inches below the lowest crossed grade, while water crossings need 60 inches; the district may specify another depth. Grandfalls is incorporated, so city streets such as A Avenue belong to the city. No railroad crossing is mapped, and canal work requires planning for the water crossing.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near City of Grandfalls water service?
The City of Grandfalls public water system uses groundwater wells and reports 279 service connections serving 395 people. A water bore near Avenue D should be planned around existing water lines and confirmed route conditions. Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Ward County; confirm the line owner for the specific address before planning a conduit bore, since county reporting does not identify the provider at every Grandfalls property.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Grandfalls | Public water system | Groundwater wells | 279 connections, 395 people served |
| Oncor Electric Delivery Company and Texas-New Mexico Power | Electric utilities reporting service in Ward County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Grandfalls’ median housing year at 1972; 44 percent of housing was built before 1960 and 19 percent in 2000 or later. A replacement line near G Avenue may need to meet older buried services, while a new service has a different route. Before the drill approaches a marked utility, we expose it by hydrovac potholing; paint shows position, not depth. A line under A Avenue needs the same check.

Where is Grandfalls in relation to Imperial and Monahans?
Grandfalls is an incorporated town in Ward County at an elevation of 2,434 feet, covering 0.54 square miles. ZIP code 79742 serves the town, where Texas State Highway 18 runs inside the limits. Imperial is 10.7 miles southeast and Coyanosa is 14.2 miles southwest; Monahans, the county seat and nearest larger city, is 25.6 miles northwest. Our Yukon yard is 502 road miles away, a 9.8 hour drive, so that distance is part of planning a bore near the North Lateral Canal.
Places near Grandfalls
- Directional boring in Imperial: 10.7 miles southeast
- Directional boring in Coyanosa: 14.2 miles southwest
- Directional boring in Southwest Sandhill: 15.3 miles north
- Directional boring in Thorntonville: 16.9 miles north
- Directional boring in Wickett: 18 miles northwest
- Directional boring in Monahans: 25.6 miles northwest
What kinds of bores come up in Grandfalls along A Avenue?
- Highway crossing: A bore beneath Texas State Highway 18 uses boring or tunneling under existing pavement and follows the TxDOT permit plan.
- Water service: A connection near the City of Grandfalls groundwater system needs a route checked against existing service lines.
- Fiber route: A fiber bore along A Avenue can keep pavement and sidewalks intact while avoiding marked utilities.
- Canal crossing: A North Lateral Canal bore needs planned entry and exit pits on land and a review for water crossing jurisdiction.
- Street replacement: A sewer or water replacement near Avenue D can be bored below the street instead of cutting its surface.
- Electric conduit: A conduit route near Texas State Highway 329 starts with confirming the line owner and the applicable TxDOT permit.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Grandfalls bore near C Avenue?
For a Grandfalls quote, start with where the work is, such as a map pin near C Avenue. Tell us what is going in the ground, such as water or fiber; give the pipe or conduit size, from a small service line to larger casing; then give the footage. A sketch or plans showing the route toward Texas State Highway 18 help us understand the crossings.
In Grandfalls, soil and crossing conditions matter first because Ima fine sandy loam can fall in behind the drill and the North Lateral Canal may need a planned crossing. Price also reflects bore length and pipe or conduit size, marked utilities to expose, pavement near Texas State Highway 18, and pits or excavator time. A route 502 road miles from Yukon also affects mobilization. We review the route and scope together.
Questions people ask about boring in Grandfalls
Does Trinity Boring Solutions take jobs in Grandfalls, Ward County, and who staffs them?
Yes. Along Texas State Highway 18, we take directional boring work in Grandfalls and across Texas, planning crossings around the state route. Our own crews and partner contractor crews we have vetted can staff the work, and you deal with Trinity from the first call through the bore log. For a route near Texas State Highway 18, we plan the work around local soil and crossings.
Can a line be bored beneath the North Lateral Canal in Grandfalls?
A bore beneath the North Lateral Canal can be planned to pass below the channel without cutting the banks. The canal runs 0.47 miles in Grandfalls, and the crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. The route, ground and entry points determine the bore plan.
Who runs Grandfalls’ public water system in Ward County, and what is its water source?
The City of Grandfalls owns the public water system, which draws from groundwater wells. For underground work in Grandfalls, we account for the reported 279 service connections serving 395 people when planning routes. For a new or replacement line near Avenue D, the proposed route still needs to be checked against existing buried water lines.
Which electric providers report service in Grandfalls, Ward County, and who confirms conduit details?
Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Ward County. The provider at a specific Grandfalls address must be confirmed with the line owner before conduit planning. That confirmation helps establish the line’s requirements and the route near streets such as G Avenue.
Who controls G Avenue in Grandfalls, and can a bore avoid cutting the street?
Grandfalls is incorporated, so G Avenue is a city street. A directional bore can pass beneath the street without an open cut, subject to the route and site conditions. We expose marked utilities along the bore path before drilling near them, since surface marks do not show their depth.
How do Grandfalls housing age and buried lines affect replacement bores near A Avenue?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1972, with 44 percent built before 1960. A replacement bore near A Avenue may have to work around older buried services; a new service can have a different route. Potholing confirms marked line locations before drilling nearby.
Does Trinity cover Imperial and rural sites outside Grandfalls?
Yes. We take work in Imperial, 10.7 miles southeast of Grandfalls, as well as rural sites outside town limits. A route beyond Grandfalls still needs its location, soil and crossings reviewed. The North Lateral Canal and Texas State Highway 18 are examples of local features that can affect a route inside town.
How much Texas811 notice is needed for a Grandfalls bore near Avenue D, and what about the marks?
Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If an Avenue D start slips more than 14 days past the original notice, make a new request. On Avenue D, we pause work until worn or moved marks are refreshed through Texas811.
What affects the cost of a Grandfalls directional bore under Texas State Highway 18?
The route and scope determine the price, with soil and crossing conditions first: Ima fine sandy loam can affect drilling and reaming, while a highway crossing has permit and cover requirements. Length, pipe or conduit size, utilities to expose, pavement, pits and excavator time also matter. Mobilization from Yukon is another factor for Grandfalls.
Where the Grandfalls facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Grandfalls
- U.S. Census Bureau, TIGER/Line 2024: Grandfalls boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Grandfalls
- U.S. Census Bureau, American Community Survey 2019 to 2023: Grandfalls housing units and year built
- Macrostrat geologic map compilation: map units under Grandfalls
- U.S. EPA Safe Drinking Water Information System: public water systems serving Grandfalls
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Ward County
- U.S. Geological Survey, Elevation Point Query Service: Grandfalls elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Grandfalls
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Grandfalls
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Grandfalls, Texas
Type the address of your job in Grandfalls. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Grandfalls
Same county: Barstow · Pyote. All counties: Texas county list.
