Barstow Texas Directional Boring: Monahans Fine Sandy Loam, Union Pacific, Lateral Canal No 3
Quick Answer: At Interstate 20 Business and Lateral Canal No 3, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Barstow, Texas. Barstow is 517 road miles from our Yukon, Oklahoma main office, and Canal Street is one route where a line may need a planned crossing. USDA maps Monahans fine sandy loam across 82 percent of the city, with sandy clay loam below about 40 inches. In Monahans soil, gravelly material at depth can loosen behind a reamer, so we plan staged reaming and fluid control.
Barstow bores at a glance
- Incorporated city in Ward County, Texas. Population 256 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 517 miles, about 10 hours of driving.
- Ground: Monahans soil is mapped on 82 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 20 Business, FM 516 and FM 873. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Lateral Canal No 3.
- Public water: City of Barstow, groundwater bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring on Canal Street in Barstow?
Trinity Boring Solutions takes directional boring work in Barstow, Ward County, including routes along Canal Street and Brant Avenue. The Census Bureau Vintage 2024 estimate puts Barstow at 256 people. Depending on the route and scope, we install water, sewer, gas, electric conduit and fiber lines beneath streets or other crossings while keeping pavement and sidewalks uncut.
Our main office is in Yukon, Oklahoma, and Barstow work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982 when planning Barstow work. For a Canal Street service route, our equipment range runs from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

What does the soil survey show under Barstow and Monahans soil?
The USDA soil survey maps Monahans fine sandy loam, 0 to 2 percent slopes, across 82 percent of Barstow, and Toyah clay loam across 16 percent. At about 40 inches, sandy clay loam is mapped under 98 percent of the city. The surface texture is mostly fine sandy loam, 84 percent, with clay loam at 16 percent. We use Barstow mapped patterns for planning, but these are not test borings. A route near Canal Street still needs field checks because gravelly material can affect how a bore holds open.
| USDA soil survey, inside the Barstow city limits | What is mapped |
|---|---|
| Soil series mapped | Monahans 82 percent and Toyah 16 percent |
| Texture at the surface | fine sandy loam 84 percent and clay loam 16 percent |
| Texture about 40 inches down | sandy clay loam 98 percent |
| Engineering class about 40 inches down | clayey sand (SC) 82 percent and lean clay (CL) 16 percent |
| Average clay content about 40 inches down | 24 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 2 percent of the area |
For Barstow, the survey leaves bedrock unmapped in the top five feet, while the geologic map names Holocene alluvium and Paleocene Cenozoic sedimentary rocks. Seasonal water table and flood prone soils are not mapped, but drainage still matters near Lateral Canal No 3. High steel corrosion risk is mapped across 2 percent of the area, so the line owner should weigh casing and tracer wire materials. The mapped gravelly ground at depth can cave behind a bit, calling for staged reaming and pipe ready for pullback.
How do we bore through Barstow sandy clay loam?
In Barstow, we plan the bore around the sandy clay loam mapped below about 40 inches and the gravelly ground mapped across much of the area. The setup depends on the route, utility marks and the surface crossing.
- The USDA map shows fine sandy loam over much of Barstow, so we match the drilling fluid and reamer setup to the route rather than treating every street crossing alike.
- At about 40 inches, sandy clay loam is mapped under 98 percent of Barstow; we open the hole in stages and have the pipe ready for the final ream.
- Gravelly material is mapped across 82 percent of the area at that depth, so we track depth and pitch as the drill advances near Canal Street.
- Before drilling near a marked line on Colorado Street, we use hydrovac potholing to expose it because locate paint does not show its depth.

Where might a Barstow line go under Interstate 20 Business?
Interstate 20 Business runs 0.8 mapped roadway miles inside Barstow, and Interstate 20 is 1.2 miles outside the limits. FM 516 and FM 873 also run through the city. Canal Street is the longest named street at 1.12 miles, followed by Brant Avenue at 1.01 miles and Mackey Avenue at 0.89 miles. Those routes make street crossings a practical part of planning. A bore beneath existing highway pavement avoids cutting across the surface, with the route and cover planned for the applicable right of way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 Business | Interstate | 0.8 roadway miles inside | State highway office |
| FM 516 | State highway | 1 roadway miles inside | State highway office |
| FM 873 | State highway | 0.5 roadway miles inside | State highway office |
| Interstate 20 | Highway nearby | 1.2 miles outside | State highway office |
| Union Pacific | Railroad | 0.77 track miles inside | The railroad |
| Lateral Canal No 3 | Stream | 0.81 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Lateral Canal No 2 | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Main Line Canal | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific track runs 0.77 miles through Barstow on the Toyah Subdivision, and public mapping shows 2 street and rail crossings in the city. A route beneath that track needs the railroad owner’s agreement. Lateral Canal No 3 runs 0.81 channel miles inside Barstow, and mapped streets cross named streams at 7 locations. Lateral Canal No 2 and Main Line Canal are also nearby. No lakes or ponds are mapped within one mile, so drainage and canal routes are the water features to assess.
Whose permission does a Barstow bore near Union Pacific need?
For work on Interstate 20 Business, FM 516 or FM 873 right of way in Barstow, the line owner submits the utility permit application through TxDOT’s online RULIS system. The TxDOT Odessa District reviews it. We prepare the bore plan and profile for the utility owner’s filing and work under the permit issued to that owner. Because Barstow is incorporated, we treat city streets as city property when planning a boring route. A crossing of Union Pacific track also needs an agreement with the railroad owner, which sets crossing conditions. Planning a Lateral Canal No 3 crossing includes checking whether the U.S. Army Corps of Engineers has jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Barstow and Ward County?
The City of Barstow public water system serves 198 people through 255 service connections, using purchased groundwater. For electric service in Ward County, Oncor Electric Delivery Company and Texas-New Mexico Power report service to the EIA. Those county reports do not identify the provider for every address, so we confirm the line owner before planning an electric conduit bore near Canal Street or another route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Barstow | Public water system | Groundwater bought from another system | 255 connections, 198 people served |
| Oncor Electric Delivery Company and Texas-New Mexico Power | Electric utilities reporting service in Ward County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Barstow’s median housing year at 1956; 61 percent of units were built before 1960, while 10 percent date to 2000 or later. That older housing stock can mean a replacement line as well as a new service near Colorado Street. We use hydrovac potholing to expose marked utilities before drilling near them, since surface paint shows position but not depth.

Where is Barstow in relation to the Town of Pecos?
Barstow is in Ward County at an elevation of 2,567 feet, with 0.66 square miles of land and ZIP code 79719. The Town of Pecos is 9.1 miles southwest, and Lindsay is 10.6 miles southwest; Pyote is 16.9 miles east. Monahans, the county seat, is 22.7 miles northeast. From our Yukon, Oklahoma main office, Barstow is 517 road miles away and about a 10.0 hour drive, which factors into mobilization for a project on Canal Street or FM 516.
Places near Barstow
- Town of Pecos: 9.1 miles southwest
- Lindsay: 10.6 miles southwest
- Directional boring in Pyote: 16.9 miles east
- Directional boring in Mentone: 20.8 miles northwest
- Directional boring in Monahans: 22.7 miles northeast
What boring work comes up near Lateral Canal No 3 in Barstow?
- Highway crossing: A bore beneath Interstate 20 Business can keep the roadway surface intact, with the route planned for the TxDOT right of way.
- Water service: A new connection near the City of Barstow system needs a route coordinated with the purchased groundwater service lines.
- Fiber conduit: A run along Canal Street can pass beneath pavement, with marked utilities exposed before the drill approaches them.
- Canal crossing: A line near Lateral Canal No 3 needs a planned path beneath the channel and a jurisdiction check during planning.
- Rail crossing: A route under the 0.77 miles of Union Pacific track in Barstow needs an agreement with the railroad owner.
- Street replacement: Older housing near Colorado Street can mean replacing a buried service, so we expose marked lines before drilling nearby.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a directional boring quote for Barstow near Colorado Street?
For a Barstow quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage. A Colorado Street location helps show where the route meets existing pavement; a sketch or plans can clarify a crossing at Interstate 20 Business or Lateral Canal No 3. We can discuss the route from the first call through the bore log.
In Barstow, the ground is a leading price factor: Monahans soil maps gravelly material at about 40 inches, which can call for staged reaming and careful fluid returns. The number and type of utilities to expose also matter, especially near older streets such as Canal Street. Interstate 20 Business, Union Pacific track, pavement, drainage crossings, pits and excavator time can add work. Mobilization from Yukon also matters because Barstow is 517 road miles from our main office. Pipe size, bore length and emergency timing affect the scope too.
Questions people ask about boring in Barstow
Does Trinity take directional boring jobs in Barstow and Ward County?
Yes, we take directional boring jobs in Barstow, Ward County. Our own crews and partner drilling contractors from satellite yards support the work, while Trinity remains the point of contact from the first call through the bore log. A route near Canal Street is planned for its specific crossings and marked utilities.
Could a Barstow bore encounter rock below the soil?
A bore in Barstow could encounter rock at depth, even though bedrock is not mapped in the top five feet. The geologic map shows Holocene alluvium and Paleocene Cenozoic sedimentary rocks. A route near Lateral Canal No 3 needs site specific planning rather than assuming the mapped surface soil continues unchanged.
Who approves a Barstow bore under Interstate 20 Business?
The line owner applies for a TxDOT utility permit for work in the Interstate 20 Business right of way, and the TxDOT Odessa District reviews it. The owner files through RULIS, with our bore plan and profile supporting the application. The permitted route and cover conditions govern the highway crossing.
What does a Barstow bore under Union Pacific track require?
A crossing beneath Union Pacific track in Barstow needs an agreement from the railroad that owns it. The track is part of the Union Pacific Toyah Subdivision, with 0.77 track miles inside the city. The railroad’s agreement establishes crossing conditions such as casing, depth and flagging.
Can a line be bored under Lateral Canal No 3 in Barstow?
A line can be planned beneath Lateral Canal No 3, which runs 0.81 channel miles inside Barstow. The crossing route and depth need to account for the channel, and planning checks whether the U.S. Army Corps of Engineers has jurisdiction. The local drainage conditions are reviewed before the bore is laid out.
Who operates Barstow’s public water system, and where does its water come from?
The City of Barstow owns and runs the public water system, which uses purchased groundwater. Barstow’s system serves 198 people through 255 service connections, figures we consider when planning underground work. For a new line near Canal Street, the water system information helps frame the route, but the specific buried line locations still need to be checked.
How far is Barstow from the Yukon office, and does Town of Pecos help?
Barstow is 517 road miles and about a 10.0 hour drive from our Yukon, Oklahoma main office. The Town of Pecos is 9.1 miles southwest of Barstow, but the Yukon distance still affects mobilization. We consider that trip alongside the route, equipment and crossings on a job near FM 516.
How early should I call 811 for a Barstow bore on Canal Street?
For a Canal Street bore in Barstow, submit the locate request through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. Do not submit earlier than 14 days before the work. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
What affects the price of a Barstow bore under Interstate 20 Business?
The route and job scope determine the price of a Barstow bore, not one standard rate. Monahans soil and its gravelly material can affect drilling time; Interstate 20 Business adds highway planning, and marked utilities may require potholing. Pipe size, footage, pavement, pits, drainage crossings and mobilization from Yukon also shape the work.
Where the Barstow facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Barstow
- U.S. Census Bureau, TIGER/Line 2024: Barstow boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Barstow
- U.S. Census Bureau, American Community Survey 2019 to 2023: Barstow housing units and year built
- Macrostrat geologic map compilation: map units under Barstow
- U.S. EPA Safe Drinking Water Information System: public water systems serving Barstow
- U.S. Department of Transportation, North American Rail Network: track owners in Ward County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Ward County
- U.S. Geological Survey, Elevation Point Query Service: Barstow elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Barstow
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Barstow
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Barstow, Texas
Type the address of your job in Barstow. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Barstow
Same county: Thorntonville · Wickett · Grandfalls · Southwest Sandhill. All counties: Texas county list.