Ore City Texas Directional Boring: Bowie Fine Sandy Loam, US 259, Meddlin Creek
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), in Ore City for routes beneath US 259 and its pavement. The Yukon office is 322 road miles away, and Meddlin Creek is one local crossing to plan around. Bowie fine sandy loam covers 38 percent of the mapped area, while sandy clay loam below can grip the reamer and pipe. Nearby Gilmer is 14.0 miles west.
Ore City bores at a glance
- Incorporated city in Upshur County, Texas. Population 1,199 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 322 miles, about 6.4 hours of driving.
- Ground: Bowie soil is mapped on 38 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 259, FM 450 and FM 1649. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Meddlin Creek.
- Public water: City of Ore City, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near US 259 in Ore City?
Trinity Boring Solutions takes directional boring work in Ore City, with a 322 road mile trip from our Yukon office and work staffed by our own crews and vetted partner contractor satellite yards. The Census Bureau Vintage 2024 estimate puts the population at 1,199 in Upshur County. Near US 259 or Mimosa Street, we install water, sewer, gas, electric conduit and fiber lines by boring beneath the surface.
Our main office is in Yukon, Oklahoma, and Ore City work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started directional boring in 1982, bringing four decades of practice to the Bowie fine sandy loam and sandy clay loam mapped around Ore City. Our family business began in 1965.

What does the soil survey show beneath Ore City and Bowie soil?
The USDA soil survey maps Bowie fine sandy loam across 38 percent of Ore City, with Cuthbert fine sandy loam across 18 percent and Kirvin gravelly fine sandy loam across 13 percent. At about 40 inches below the surface, sandy clay loam is mapped under 70 percent of the area and clay loam under 22 percent. The survey average clay content at that depth is 28 percent. Those mapped patterns point to clay that can cling to a reamer and grip the pipe, so the bore plan needs to account for the material deeper down.
| USDA soil survey, inside the Ore City city limits | What is mapped |
|---|---|
| Soil series mapped | Bowie 38 percent, Cuthbert 18 percent, Kirvin 13 percent, Tenaha 8 percent and Iulus 7 percent |
| Texture at the surface | fine sandy loam 67 percent, gravelly fine sandy loam 13 percent and loamy fine sand 10 percent |
| Texture about 40 inches down | sandy clay loam 70 percent, clay loam 22 percent and fine sandy loam 7 percent |
| Engineering class about 40 inches down | lean clay (CL) 71 percent, clayey sand (SC) 21 percent and silty clayey sand (SC SM) 7 percent |
| Average clay content about 40 inches down | 28 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 53 percent of the area |
| Flood prone soils | 12 percent of the area |
| High corrosion risk for uncoated steel | 47 percent of the area |
Bedrock is not mapped in the top five feet of Ore City, though the Queen City Sand geologic unit, of Lutetian age, includes sandstone, siltstone and claystone. Seasonal water table is mapped within 60 inches across 53 percent of the area, so pits may need pumping. Flood prone soils cover 12 percent. High steel corrosion risk is mapped across 47 percent, so the line owner should consider casing and tracer wire materials; HDPE does not share that steel concern.
What does it take to bore Ore City sandy clay loam?
For Ore City routes through sandy clay loam, we control the drilling fluid and open the hole in stages. That helps manage clay that can ball on the reamer and tighten around pipe.
- Bowie fine sandy loam covers 38 percent of Ore City, so we select drilling fluid and staged reaming to keep the hole stable as the bit advances.
- Sandy clay loam is mapped under 70 percent of the area at about 40 inches, so we prepare the pipe and pull it after opening the final ream.
- Seasonal water table is mapped within 60 inches across 53 percent of Ore City; near Meddlin Creek, we plan manageable pits and pump water if needed.
- Before drilling near Main Street or US 259, we hydrovac marked utilities on the route, then track the drill head and record depth and pitch.

Where does a line have to go under Meddlin Creek in Ore City?
Ore City routes may need to cross US 259, FM 450 or FM 1649, all mapped within city limits. A line beneath existing highway pavement is installed by boring or tunneling, rather than cutting across the pavement. Main Street is the longest named street at 1.96 miles in the city, followed by Mimosa Street at 1.11 miles and Front Street at 1.0 mile. Those corridors can put a bore near pavement, driveways or existing utilities, so we plan the entry and exit pits outside the crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 259 | US highway | 1.9 roadway miles inside | State highway office |
| FM 450 | State highway | 1.2 roadway miles inside | State highway office |
| FM 1649 | State highway | 0.7 roadway miles inside | State highway office |
| Meddlin Creek | Stream | 0.61 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sandy Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Baker Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake O the Pines | Lake or pond | 15,347 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Ore City or within one mile outside it, and no street and rail crossings are mapped. Meddlin Creek runs 0.61 channel miles through the city, with two mapped street crossings of named streams. Sandy Creek is 0.4 miles from the limits and Baker Creek is 0.9 miles away. Lake O the Pines is nearby but outside city limits. A creek or lake crossing needs a check for U.S. Army Corps of Engineers jurisdiction during planning.
Whose permission does an Ore City bore in Upshur County need?
For a bore along Main Street or Mimosa Street, Ore City itself governs its city streets because it is an incorporated city. Work in the right of way of US 259, FM 450 or FM 1649 needs a TxDOT utility permit reviewed by the TxDOT Atlanta District. The line owner files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for that application. TxDOT cover requirements vary by line type: electric and communication lines need 60 inches at crossings and 48 inches along the right of way; water lines need 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. The permit may set another depth. No railroad is mapped in Ore City. A Meddlin Creek crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near City of Ore City lines in Ore City?
The City of Ore City public water system uses groundwater wells and reports 577 service connections serving 1,509 people. Before planning a water bore near Main Street, we confirm the system and line owner for the address. Southwestern Electric Power, Upshur Rural Electric Cooperative and Wood County Electric Cooperative report electric service in Upshur County; we confirm the electric line owner before planning a conduit bore, since providers can vary by address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Ore City | Public water system | Groundwater wells | 577 connections, 1,509 people served |
| Southwestern Electric Power, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Upshur County | EIA Form 861 | Confirm the line owner by address |
Ore City’s median housing year is 1977, so we confirm utility locations for underground work instead of relying on housing age. The estimates show 18 percent of homes built before 1960, 80 percent from 1960 to 1999 and 2 percent in 2000 or later. A replacement service near Mimosa Street may meet older buried lines, while a new service may need a different route. We hydrovac expose marked utilities on the bore path before drilling near them; paint shows position, not depth.

Do you cover Ore City and nearby Lone Star?
Ore City is in Upshur County, at an elevation of 310 feet, and covers 2.16 square miles. The city’s ZIP codes are 75683 and 75640. Lone Star is 9.6 miles north, Avinger is 11.7 miles northeast, Pine Harbor is 12.9 miles east, and Gilmer is 14.0 miles west. Gilmer is both the nearest larger city and the Upshur County seat. From our Yukon yard, Ore City is 322 road miles away, about a 6.4 hour drive, so distance is part of planning crew mobilization.
Places near Ore City
- Directional boring in Lone Star: 9.6 miles north
- Directional boring in Avinger: 11.7 miles northeast
- Directional boring in Pine Harbor: 12.9 miles east
- Directional boring in Gilmer: 14 miles west
- Directional boring in Hughes Springs: 14.6 miles north
Which jobs call for a bore near Mimosa Street in Ore City?
- Highway crossing: A route beneath US 259 needs a bore or tunnel under existing pavement, with the line owner handling the TxDOT permit.
- Water service: A connection near Main Street may tie into the City of Ore City groundwater system after the address and line owner are confirmed.
- Fiber drop: A Mimosa Street fiber route can pass beneath pavement and driveways without cutting the street surface.
- Creek crossing: A Meddlin Creek bore needs a route under the channel and a check for U.S. Army Corps of Engineers jurisdiction.
- Electric conduit: Near FM 450, we confirm which reported Upshur County electric provider owns the line before planning a conduit bore.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of an Ore City bore near Main Street?
For an Ore City quote, start with the address or map pin, such as a location along Main Street. Tell us what will go underground, whether it is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans help us see how the route relates to US 259, driveways or Meddlin Creek.
A short route along Mimosa Street with clear access and no creek crossing may be simpler to plan than a route under US 259 or Meddlin Creek. Length, pipe size, soil and rock, the number of utilities to expose, pavement, creek crossings, pits and excavator time all shape the work. The mapped sandy clay loam can affect reaming, while 322 road miles from Yukon also affects mobilization. High profile or emergency work adds planning demands.
Questions people ask about boring in Ore City
Does Trinity Boring Solutions take jobs in Ore City, Upshur County, and who staffs them?
Yes. We take directional boring work in Ore City, and our own crews and vetted partner contractor satellite yards staff jobs there. For an FM 450 crossing, we stay involved from the first call through the bore log, regardless of which crew is on site. For a route near US 259, we can review the address, line type, size and footage.
What does Ore City housing near Mimosa Street mean for replacing buried lines?
Ore City housing has a median year built of 1977, according to American Community Survey 2019 to 2023 five year estimates. Since 18 percent of homes were built before 1960, a replacement bore near Mimosa Street may encounter older utilities. We expose marked lines on the route before drilling close to them.
Could groundwater or wet ground near Meddlin Creek affect Ore City bore pits?
It could. The USDA soil survey maps a seasonal water table within 60 inches across 53 percent of Ore City, and flood prone soils across 12 percent. Near Meddlin Creek, we plan the crossing depth beneath the channel and account for water in the pits. Creek crossings are checked for Corps jurisdiction during planning.
Does Bowie soil in Ore City corrode steel, and what pipe can we use?
The survey maps high steel corrosion risk across 47 percent of Ore City, including areas with Bowie soil. For Main Street boring, the line owner selects any coating for steel casing or tracer wire, and we follow that specification. HDPE avoids that steel corrosion concern. We use the planned line material and the route conditions to shape the bore plan near US 259 or other local streets.
What ground does a bore pass through in Ore City near Bowie soil?
The USDA soil survey maps Bowie fine sandy loam across 38 percent of Ore City. At about 40 inches, sandy clay loam is mapped under 70 percent of the area, with clay loam under 22 percent. That deeper clay can stick to a reamer and grip pipe, so staged reaming and fluid control may matter.
Will an Ore City bore hit rock near the Queen City Sand formation?
Bedrock is not mapped in the top five feet of Ore City, but the Queen City Sand unit includes sandstone, siltstone and claystone. That map does not rule out rock at greater depth. If the bore reaches soft or weathered rock, we adjust the drilling approach to the material encountered along the route.
How much notice does Texas811 need for an Ore City bore near Main Street?
For a bore near Main Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For Ore City work, we schedule Texas811 notice at least two working days ahead and coordinate state permits with TxDOT Atlanta District. If the start slips more than 14 days past the notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
How far is Ore City from Yukon, and does Gilmer change the job plan?
Ore City is 322 road miles and about a 6.4 hour drive from our Yukon yard. Gilmer, the county seat and nearest larger city, is 14.0 miles west of Ore City. The trip from Yukon can affect mobilization, while the local route, such as a crossing near US 259, sets the drilling plan.
What affects directional boring costs near US 259 in Ore City?
The route and work scope determine the price, not the highway name alone. Bore length and size, Bowie soil conditions, utilities to expose, pavement, pits and creek crossings all matter. A crossing beneath US 259 may involve highway permit planning, while a Meddlin Creek route adds creek planning. Distance from Yukon can also affect mobilization.
Where the Ore City facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Ore City
- U.S. Census Bureau, TIGER/Line 2024: Ore City boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Ore City
- U.S. Census Bureau, American Community Survey 2019 to 2023: Ore City housing units and year built
- Macrostrat geologic map compilation: map units under Ore City
- U.S. EPA Safe Drinking Water Information System: public water systems serving Ore City
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Upshur County
- U.S. Geological Survey, Elevation Point Query Service: Ore City elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Ore City
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Ore City
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Ore City, Texas
Type the address of your job in Ore City. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Ore City
Same county: Gladewater · Big Sandy · East Mountain · Union Grove. All counties: Texas county list.