trinityboringsolutions.com

Potosi Texas Directional Boring: Sagerton Clay Loam, FM 1750 and Lytle Creek

Quick Answer: Sagerton clay loam can hold a bore open, while sticky clay can build up on the reamer; we do directional boring, also called horizontal directional drilling (HDD), for routes near FM 1750. Potosi is 308 road miles from our Yukon yard, so a route crossing Lytle Creek affects planning and mobilization. Clay loam and clay dominate the mapped ground at about 40 inches. We ream in stages and manage drilling fluid to limit pressure under pavement.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Potosi bores at a glance

  • Unincorporated community in Taylor County, Texas. Population 3,947 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 308 miles, about 6.1 hours of driving.
  • Ground: Sagerton soil is mapped on 42 percent of the area, with clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 10 percent of the area.
  • Highways inside the boundary: FM 1750, Texas State Highway 36 and FM 707. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Lytle Creek.
  • Public water: Potosi Water Supply Corporation, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near FM 1750 in Potosi?

Trinity Boring Solutions takes directional boring work in Potosi, Taylor County, including routes along FM 1750. Sagerton clay loam can stay open around the drill, while sticky clay needs careful reaming. The Census Bureau counted 3,947 people in Potosi in the 2020 Census. We install water, sewer, gas, electric conduit and fiber lines along local roads such as Key Lane and Vinson Road.

Our main office is in Yukon, Oklahoma, and Potosi work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business that started in 1965 and has done directional boring since 1982. Four decades of boring inform how we plan for Potosi’s Sagerton clay loam and routes beneath FM 1750.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a bore meet in Potosi’s Sagerton soil?

The USDA soil survey maps Sagerton across 42 percent of Potosi, with Sagerton clay loam among the leading map units. At about 40 inches below the surface, clay loam covers 45 percent of the mapped area and clay covers 38 percent. We account for the 37 percent average clay content at that depth when planning bores through Potosi’s clay loam surface soil. Clay can cling to a reamer and grip pipe, so crews need to control fluid and open the hole in stages. Sagerton and Tobosa soil maps guide our Potosi route planning, but they show mapped patterns rather than test borings.

USDA soil survey, inside the Potosi mapped community boundaryWhat is mapped
Soil series mappedSagerton 42 percent, Tobosa 13 percent, Rowena 11 percent, Rioconcho 5 percent and Hamby 4 percent
Texture at the surfaceclay loam 70 percent, clay 17 percent and fine sandy loam 4 percent
Texture about 40 inches downclay loam 45 percent, clay 38 percent and bedrock 5 percent
Engineering class about 40 inches downlean clay (CL) 59 percent, fat clay (CH) 32 percent and clayey gravel (GC) 3 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inches10 percent of the area (5 percent hard rock, 4 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils12 percent of the area
High corrosion risk for uncoated steel45 percent of the area

The USDA soil survey maps bedrock within 60 inches in 10 percent of Potosi; hard bedrock accounts for 5 percent and weathered bedrock for 4 percent. The typical mapped depth is 27 inches, so the route needs checking for shallow rock. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 12 percent. High steel corrosion risk is mapped across 45 percent, a concern for casing and tracer wire that the line owner can address through material choices. The Clear Fork Group, of Kungurian age, includes mudstone, siltstone, sandstone, dolomite, limestone and gypsum.

How do crews handle Potosi’s clay loam?

In Potosi, we adjust the bore to the clay loam and clay mapped around FM 1750. Those soils can hold the hole open but stick to the reamer, so staged passes and controlled fluid help manage the pull.

  1. Sagerton clay loam is common in Potosi, so we use staged reaming to keep sticky soil from loading the reamer and gripping the pipe.
  2. With 37 percent average clay mapped at about 40 inches, we watch returns and keep fluid pressure in check beneath paved roads such as Key Lane.
  3. Where a route approaches the mapped shallow bedrock, including ground in the Clear Fork Group, we track depth and pitch as drilling slows through harder material.
  4. Near Lytle Creek, we plan the bore to pass beneath the channel and check for U.S. Army Corps of Engineers jurisdiction before setting the route.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Which roads and creeks can a Potosi bore cross near Key Lane?

Potosi routes may meet FM 1750, Texas State Highway 36 or FM 707, all mapped inside the community. US 84 and US 83 lie 1.0 mile from the mapped boundary. Key Lane runs 4.69 miles inside the community, Potosi Road 4.05 miles and Bacacita Farms Road 2.44 miles; Vinson Road adds another possible route at 2.38 miles. A bore can pass below pavement rather than cut across these roads, subject to the road owner’s approval.

CrossingTypeMapped extentWho has a say
FM 1750State highway7.5 roadway miles insideState highway office
Texas State Highway 36State highway3.1 roadway miles insideState highway office
FM 707State highway1.3 roadway miles insideState highway office
US 84Highway nearby1 miles outsideState highway office
US 83Highway nearby1 miles outsideState highway office
Lytle CreekStream6.41 channel miles insideChecked for Corps of Engineers jurisdiction
Spring CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Cedar CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Kirby LakeLake or pond485 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad runs inside the mapped Potosi community or within 1 mile outside it, so no track crossing is mapped there. Lytle Creek has 6.41 channel miles inside the community, and public records map six street crossings of named streams. Spring Creek touches or follows the boundary, while Cedar Creek is 0.1 mile away. Kirby Lake covers 485 acres within 1 mile but is outside the community. A creek route needs depth planning and a check for federal jurisdiction.

Who approves a Potosi bore in Taylor County?

Potosi is an unincorporated community, so there is no city government to permit its streets; the responsible county or state authority depends on the route. A bore under FM 1750, Texas State Highway 36, FM 707 or nearby US 84 or US 83 needs a TxDOT utility permit for highway right of way, reviewed by the TxDOT Abilene District. The line owner applies through RULIS, and we prepare the bore plan and profile for its application. TxDOT’s cover rules set the bore depth, and highway pavement must be crossed by boring or tunneling. Lytle Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near Potosi Water Supply Corporation routes?

Potosi Water Supply Corporation is the local government owned public water system; it uses purchased surface water and reports 2,471 service connections serving 7,413 people. The Census Bureau maps many road routes near Key Lane where water lines may need protection. AEP Texas North and Taylor Electric Cooperative report electric service in Taylor County, but we confirm the line owner for the specific route before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Potosi Water Supply CorporationPublic water systemSurface water bought from another system2,471 connections, 7,413 people served
AEP Texas North and Taylor Electric CooperativeElectric utilities reporting service in Taylor CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Potosi’s median housing year at 2003: 7 percent of homes were built before 1960, 34 percent from 1960 to 1999 and 59 percent in 2000 or later. That mix can mean either replacement work or new services along Vinson Road. Before a drill approaches a marked line, we hydrovac pothole it to check its depth; surface paint alone cannot show how deep it sits.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Do you cover Potosi and nearby Abilene?

We take directional boring work in Potosi and across Texas, including routes toward Abilene, 8.8 miles north. Potosi is in Taylor County, stands at 1,843 feet and covers 18.35 square miles within its mapped community boundary. Its ZIP code is 79602. Buffalo Gap is 9.5 miles west, Tuscola 10.9 miles southwest and Clyde 11.6 miles northeast. Abilene is both the nearest larger city and the county seat. Our Yukon yard is 308 road miles away, a 6.1 hour drive, which can affect mobilization for a Potosi job.

Places near Potosi

Which jobs call for a bore near Potosi’s Bacacita Farms Road?

  • Highway crossing: A route under FM 1750 can avoid cutting the pavement, with the bore plan and cover set through the TxDOT permit process.
  • Water service: A service line near Potosi Water Supply Corporation routes can connect a property while avoiding exposed existing water lines.
  • Fiber drop: Fiber conduit along Key Lane can run beneath the road surface, with marked utilities exposed before the drill approaches.
  • Creek crossing: A route under Lytle Creek needs channel depth planning and a jurisdiction check during project planning.
  • Electric conduit: For work near Vinson Road, we confirm the electric line owner before planning a conduit route.
  • Residential service: A new service near Bacacita Farms Road can be routed around existing utilities with potholing at marked crossings.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Potosi bore near Vinson Road?

Start with a map pin, because a site on Vinson Road may have a different route and access plan from one near Lytle Creek. For a Key Lane bore, we need the material, pipe or conduit size, and footage before planning. A sketch or plans help us see the proposed path, nearby crossings and work area before we scope the Potosi bore.

A short, direct route on Sagerton clay loam with few exposed utilities can be simpler to plan than a bore under FM 1750 or across Lytle Creek. Length, pipe size, soil and rock, utility crossings, pavement, creek or drainage crossings, pits, excavator time and sand backfill all affect the work. Potosi’s 308 road miles from Yukon can also affect mobilization, while high profile or emergency work changes the demands on the plan.

Questions people ask about boring in Potosi

Does Trinity take directional boring jobs in Potosi, Taylor County, and who staffs them?

Yes, we take directional boring work in Potosi, Taylor County, using our own crews or crews working from partner contractor satellite yards. You work with Trinity through the job, regardless of which crew is at the site. For a route near FM 1750, we plan around the highway and mapped ground.

What ground should I expect for a Potosi bore in Sagerton soil?

Potosi has extensive Sagerton soil, with clay loam and clay common at about 40 inches below the surface. The USDA soil survey maps clay loam across 45 percent and clay across 38 percent at that depth. Clay can stick to the reamer, so staged reaming and managed fluid help on routes such as Key Lane.

Is rock likely along a Potosi bore route?

The USDA soil survey maps bedrock within five feet across 10 percent of Potosi, with hard bedrock mapped in 5 percent and weathered bedrock in 4 percent. The typical mapped depth is 27 inches. That makes route specific checks useful near roads such as Vinson Road; the survey map is not a test boring.

Who approves a Potosi bore beneath FM 1750?

TxDOT reviews work in the FM 1750 right of way through its Abilene District. The utility owner submits the application in TxDOT’s RULIS system, and we prepare the bore plan and profile for that filing. TxDOT cover requirements and any permit conditions guide the crossing beneath the highway.

Can a Potosi line be bored beneath Lytle Creek?

A line can be planned beneath Lytle Creek, which has 6.41 channel miles inside the mapped Potosi community. The route needs enough depth to pass under the channel, and project planning checks whether the crossing is under U.S. Army Corps of Engineers jurisdiction. Nearby street crossings may also shape the approach.

Who runs Potosi’s public water system, and where does it get water for FM 1750 work?

Potosi Water Supply Corporation owns and runs the public water system, which uses purchased surface water. Public records report 2,471 service connections and 7,413 people served. For a bore near a water route along Bacacita Farms Road, the existing line location and depth need to be checked before drilling.

What bore sizes and lengths can you handle near Potosi’s Vinson Road?

We handle Potosi projects from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The right setup near Vinson Road depends on the route, ground and crossings. A sketch or plans help us assess the needed line size and bore path.

How much 811 notice does a Potosi bore near Key Lane need?

For a bore near Key Lane, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. For an FM 1750 bore in Taylor County, we submit a new request if the start slips more than 14 days past the original notice. Before we resume a Lytle Creek crossing, we refresh worn or moved marks through Texas811.

What affects the cost of a Potosi directional bore near FM 1750?

The price depends on the Potosi route and scope, not one standard figure. Length, line size, Sagerton clay loam or shallow rock, utilities to expose, pavement, creek crossings, pits and equipment time all matter. A route under FM 1750 may bring highway permit and cover planning, and mobilization reflects the distance from Yukon.

Where the Potosi facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Potosi

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Potosi, Texas

Type the address of your job in Potosi. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Potosi

Same county: Merkel · Tye · Lawn · Trent. All counties: Texas county list.