Camargito Texas Directional Boring: Jimenez Soil, US 83 and Olmitos Creek
Quick Answer: Camargito is an unincorporated community in Starr County, so its streets, including Buffel Street, are not owned by a city government; Trinity handles directional boring, also called horizontal directional drilling (HDD), for routes such as US 83. The Yukon main office is 738 road miles away, and the 2.62 public road miles inside Camargito include Pepino Lane. Jimenez soil is mapped across 76 percent of the community, with very gravelly loam at the surface. That ground calls for staged reaming and close attention to the hole as crews work along Agira Street or near Olmitos Creek.
Camargito bores at a glance
- Unincorporated community in Starr County, Texas. Population 324 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 738 miles, about 14.4 hours of driving.
- Ground: Jimenez soil is mapped on 76 percent of the area, with variable about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 83. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Olmitos Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near US 83 in Camargito?
Camargito is an unincorporated community in Starr County, so there is no city government to own its streets. The Census Bureau counted 324 residents in 2020. We install water, sewer, gas, electric conduit and fiber lines, including routes along US 83 and local roads such as Buffel Street. The specific route and existing utilities determine whether a bore can pass under pavement or needs another alignment.
Our main office is in Yukon, Oklahoma, and Camargito work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle work from 3/4 inch service lines to 48 inch casing, from a short service near Pepino Lane to longer routes. Our family business started in 1965 and has done directional boring since 1982; the distance to Camargito affects how we plan mobilization.

What does Jimenez soil mean for boring in Camargito?
Jimenez soil is the main mapped ground in Camargito, so its gravelly surface and changing layers matter to bore planning. The USDA soil survey maps the Jimenez series across 76 percent of the community, with very gravelly loam at the surface. At about 40 inches, the mapped texture is variable across 77 percent, while sandy clay loam accounts for 16 percent and silty clay loam for 8 percent. The survey reports an average clay content of 27 percent at that depth. Our mapped patterns in Camargito show planning information, not test borings, so they do not verify subsurface conditions at a crossing.
| USDA soil survey, inside the Camargito mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Jimenez 76 percent, McAllen 16 percent and Reynosa 8 percent |
| Texture at the surface | very gravelly loam 76 percent, fine sandy loam 16 percent and silty clay loam 8 percent |
| Texture about 40 inches down | variable 77 percent, sandy clay loam 16 percent and silty clay loam 8 percent |
| Engineering class about 40 inches down | lean clay (CL) 23 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped in the top five feet of Camargito, and seasonal water table and flood prone soils are not mapped there; that does not rule out deeper rock or wet conditions at a work site. High steel corrosion risk is not mapped, but the line owner still chooses materials for casing and tracer wire. The geologic map identifies the Miocene Goliad Formation, which includes clay, sandstone, marl, caliche and limestone. That range makes site checks important rather than assuming one ground condition throughout a bore.
How do crews handle variable ground in Camargito?
Camargito’s USDA survey maps variable texture below the surface, so we adjust the bore plan as the ground changes. Jimenez soil’s gravelly surface and the mapped fine sandy loam and silty clay loam call for steady tracking and controlled fluid use.
- Jimenez soil has a very gravelly mapped surface; we check depth and pitch at each rod so gravel does not push the drill head off line near Buffel Street.
- Below the surface, Camargito’s mapped texture is variable; staged reaming and fluid choices respond to changing layers instead of treating the route as uniform.
- The survey maps silty clay loam and sandy clay loam at about 40 inches; we manage fluid and reaming so the hole stays controlled near Agira Street.
- For a route near Olmitos Creek, we track the head from the surface and record depth and pitch as the bore advances.

What could a new line cross near Buffel Street in Camargito?
US 83 runs 0.7 mapped roadway miles inside Camargito, making it the main highway crossing to plan around. TxDOT rules affect the bore depth and method where a line crosses its right of way. Inside the community, Buffel Street is the longest named street at 0.27 miles, followed by Pepino Lane at 0.2 miles and Agira Street at 0.16 miles. Those short local roads can shape service routes, but the address and proposed line determine the actual path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 83 | US highway | 0.7 roadway miles inside | State highway office |
| Border Pacific Railroad | Railroad nearby | 0 miles outside | The railroad |
| Olmitos Creek | Stream | 0.14 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Scs 7 | Lake or pond | 81 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Camargito, but Border Pacific Railroad runs along or touches the mapped community boundary. A street and rail crossing is not mapped inside the community, yet a proposed route near the track still needs a crossing plan. Olmitos Creek runs 0.14 channel miles inside Camargito, and two mapped streets cross named streams there. Scs 7, an 81 acre pond, is outside the community; the route determines whether it matters to a project.
Whose permission does a Camargito bore in Starr County need?
For a bore under US 83 in Camargito, TxDOT reviews the utility permit through its Pharr District. The utility owner, not the drilling contractor, files in TxDOT’s RULIS system, and we prepare the bore plan and profile for that application. At a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches. The permit may set a different depth. Because Camargito has no city government, its local streets belong to the county or state authority that controls the road. A route under Border Pacific Railroad needs an agreement from the railroad, which sets crossing conditions. Planning a bore under Olmitos Creek includes checking for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should a Camargito crew check in Starr County?
For a Camargito address, we confirm the water provider with the county or local water district before planning a bore. EPA drinking water records do not tie a system to this community, so the provider cannot be matched from those records. AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative report electric service in Starr County, but that does not identify the owner at every address. We confirm the electric line owner before planning conduit near US 83 or Buffel Street.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative | Electric utilities reporting service in Starr County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Camargito’s median housing year at 1985; we still verify site conditions before underground work. The survey estimates that 87 percent of housing was built from 1960 to 1999 and 13 percent in 2000 or later. Work near older homes may involve replacing an existing line, while newer construction may need a service route along Pepino Lane. We hydrovac expose marked utilities on the bore path before drilling near them; locate marks show position, not depth.

What is near Camargito and Rio Grande City?
Camargito is in Starr County, with Rio Grande City 5.7 miles northwest as both the nearest larger city and the county seat. The mapped community covers 0.07 square miles and sits at an elevation of 170 feet. ZIP code 78582 serves the area. Nearby places include Amada Acres, 0.1 miles south, Chaparrito, 0.4 miles southeast, La Casita, 0.6 miles southeast, La Puerta, 0.7 miles west, and B and E, 1.2 miles northwest. The Yukon yard is 738 road miles away, a 14.4 hour drive, which factors into mobilization for Camargito work.
Places near Camargito
- Amada Acres: 0.1 miles south
- Chaparrito: 0.4 miles southeast
- La Casita: 0.6 miles southeast
- Directional boring in La Puerta: 0.7 miles west
- Directional boring in B and E: 1.2 miles northwest
- Directional boring in Rio Grande City: 5.7 miles northwest
Which jobs call for a bore near Pepino Lane in Camargito?
- Highway crossing: A bore under US 83 needs a route and profile that account for TxDOT cover requirements and the highway right of way.
- Local service: A water or sewer line along Pepino Lane can be installed beneath pavement, with the route checked against marked utilities first.
- Creek crossing: A line under Olmitos Creek needs a planned path and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: A route under Border Pacific Railroad needs an agreement with the track owner before the crossing details are set.
- Electric conduit: Near Buffel Street, the line owner must be confirmed before conduit size and the bore path are planned.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Camargito work near Border Pacific Railroad?
For a Camargito quote, start with the address or map pin, such as a location on Buffel Street or near US 83. Tell us what will go in the ground, whether it is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans showing Olmitos Creek, road edges or Border Pacific Railroad help us review the route.
The 738 road miles from Yukon are part of mobilization planning for Camargito, but the route and site conditions also shape the price. Jimenez soil’s variable texture can affect drilling and reaming. A crossing at US 83 or near Border Pacific Railroad adds coordination, while pavement, creek crossings and the number of marked utilities to expose affect the work. Pit size, excavator time, sand backfill, emergency timing and the bore length and diameter also matter.
Questions people ask about boring in Camargito
Does Trinity take directional boring jobs in Camargito and Starr County?
Yes, we take directional boring work in Camargito and across Texas. Our own crews and vetted partner drilling contractors can staff the work, while Trinity remains your point of contact through the bore log. For a route near Buffel Street or US 83, the address and line scope help determine which crew and equipment fit.
Who approves a bore under US 83 in Camargito?
TxDOT reviews the utility permit for a bore under US 83 in Camargito through its Pharr District. The utility owner submits the application in RULIS, while we prepare the bore plan and profile. TxDOT cover requirements and the permitted route determine how deep the line must pass beneath the highway.
What does a Camargito bore under Border Pacific Railroad require?
A crossing under Border Pacific Railroad requires an agreement with the railroad that owns the track. That agreement for a Camargito crossing sets the conditions for casing, depth and flagging before we plan the bore. The railroad runs along or touches Camargito’s mapped boundary, so the exact proposed route determines whether a rail crossing is involved.
Can a line be bored under Olmitos Creek in Camargito?
A line can be planned beneath Olmitos Creek, subject to the route and site conditions. The creek runs 0.14 channel miles inside Camargito, and planning includes checking whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. The bore path needs to account for the channel rather than treating the creek like an ordinary street.
Which company owns electric lines in Camargito, Starr County?
AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative report service in Starr County, but those records do not identify the owner at every Camargito address. Before planning an electric conduit bore in Camargito, we confirm the line owner so the correct utility is identified for the route. Near US 83, the owner can also provide the conduit specifications for the proposed route.
Who controls Agira Street in Camargito, and does it need to be cut?
Camargito has no city government, so Agira Street is controlled by the county or state authority responsible for that road. A directional bore can pass beneath pavement without cutting the street, subject to the route and any applicable permit. The road authority and marked utilities still need to be considered before work begins.
How much notice does Texas811 need for a bore on Buffel Street in Camargito?
For a bore along Buffel Street, the Texas811 locate request must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. Texas811 describes that as at least two working days, which we include when scheduling a bore in Camargito. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
How far is Camargito from Yukon via Rio Grande City, and does it affect a job?
Camargito is 738 road miles and a 14.4 hour drive from our Yukon main office. Rio Grande City, the county seat, is 5.7 miles northwest of Camargito, but it does not change the Yukon distance. Mobilization is one job factor; the bore length, Jimenez soil and any crossing at US 83 also shape the work.
What affects the cost of directional boring under US 83 in Camargito?
The route, bore length and pipe or conduit size all affect a US 83 job in Camargito. Jimenez soil and the number of utilities to expose can change the drilling work, while pavement, creek crossings and pits add site tasks. A Border Pacific Railroad crossing or mobilization from Yukon can also affect the scope.
Where the Camargito facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Camargito
- U.S. Census Bureau, TIGER/Line 2024: Camargito boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Camargito population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Camargito housing units and year built
- Macrostrat geologic map compilation: map units under Camargito
- U.S. Department of Transportation, North American Rail Network: track owners in Starr County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Starr County
- U.S. Geological Survey, Elevation Point Query Service: Camargito elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Camargito
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Camargito
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Camargito, Texas
Type the address of your job in Camargito. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Camargito
Same county: Roma · Las Lomas · Escobares · La Grulla · Mikes · East Alto Bonito · Garza-Salinas II · West Alto Bonito · Mesquite · Valle Vista · El Chaparral · Garceno. All counties: Texas county list.