Moran Texas Directional Boring: Wichita Clay, Texas State Highway 6, Deep Creek
Quick Answer: From our Yukon yard, Moran is 265 road miles away, and we staff work with our own crews and vetted partner drilling contractors. We take directional boring, also called horizontal directional drilling (HDD), for lines crossing Texas State Highway 6 or Post Oak Avenue. Wichita clay loam covers much of Moran, so sticky clay can build up on a reamer and grip the pipe. Deep Creek runs along or touches the city boundary, so a crossing there needs route planning.
Moran bores at a glance
- Incorporated city in Shackelford County, Texas. Population 234 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 265 miles, about 5.8 hours of driving.
- Ground: Wichita soil is mapped on 62 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 25 percent of the area.
- Highways inside the boundary: Texas State Highway 6 and FM 576. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Moran, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Moran, Shackelford County?
At 265 road miles from our Yukon yard, we take directional boring work in Moran, Shackelford County, with our own crews and vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts Moran at 234 people, which helps set the scale of local service work. We install water, sewer, gas, electric conduit and fiber, including routes under Fisher Street or Post Oak Avenue.
Our main office is in Yukon, Oklahoma, and Moran work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, planning around 265 road miles from our Yukon main office to Moran. For Moran routes near Texas State Highway 6, our work ranges from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

What kind of ground should I expect for a Moran bore in Wichita soil?
Moran is largely mapped as Wichita clay loam, so a bore route can pass through sticky, fine grained soil. The USDA soil survey maps Wichita soils across 62 percent of the city area, and clay loam across 74 percent. At about 40 inches below the surface, the mapped texture is clay across 99 percent of the area, with average clay content of 43 percent. These are mapped soil patterns, not test borings; actual conditions along Ground Street can vary.
| USDA soil survey, inside the Moran city limits | What is mapped |
|---|---|
| Soil series mapped | Wichita 62 percent, Owens 15 percent, Thurber 11 percent and Truce 11 percent |
| Texture at the surface | clay loam 74 percent, stony clay 14 percent and fine sandy loam 11 percent |
| Texture about 40 inches down | clay 99 percent |
| Engineering class about 40 inches down | lean clay (CL) 73 percent and fat clay (CH) 27 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 25 percent of the area (0 percent hard rock, 25 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 25 percent of Moran, with a typical depth of 32 inches; the mapped bedrock is weathered, not hard. No seasonal water table or flood prone soils are mapped, but Deep Creek still matters when planning a crossing. High steel corrosion risk is mapped across the city, so the line owner should weigh casing and tracer wire materials. The geologic map includes terrace deposits of Cenozoic age and Early Permian sedimentary rock, which can mean changing conditions along a bore.
How do we bore through Moran clay loam?
Wichita clay loam can stick to the reamer and tighten around pipe, so we plan the fluid, reaming sequence and pullback around the ground mapped near Moran streets such as Fisher Street.
- On a route through Wichita clay loam, we use a thinner drilling fluid with polymer and ream in stages to limit sticky buildup on the cutting tools.
- Because heavy clay can grip the pipe, we coordinate the pullback with the final ream instead of leaving an open bore along Fisher Street.
- We watch fluid returns on clay routes near Texas State Highway 6, since pressure that is too high can lift pavement.
- A walkover locator tracks the drill head as it advances beneath Post Oak Avenue, while we log its depth and pitch.

What could a Moran bore cross near Deep Creek?
Texas State Highway 6 has 0.6 mapped roadway miles inside Moran, and FM 576 has 0.5, so a route beneath either road needs a planned crossing. Post Oak Avenue is the longest named street at 0.77 miles in the city, followed by Ground Street at 0.67 miles and Fisher Street at 0.5 miles. South Avenue adds another named route. The city has 10.23 public road centerline miles, giving a project several possible street corridors to assess.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 6 | State highway | 0.6 roadway miles inside | State highway office |
| FM 576 | State highway | 0.5 roadway miles inside | State highway office |
| Deep Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Post Oak Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Cord Wood Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Moran Lake | Lake or pond | 22 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Moran or within one mile of its limits, and no street and rail crossings are mapped in the city. No named stream runs inside the limits, but Deep Creek and Post Oak Creek run along or touch the boundary; Cord Wood Creek is 0.4 miles away. No street crossings of named streams are mapped inside the city. Moran Lake, a 22 acre lake, lies outside the limits but within one mile, so a route near it should be checked during planning.
Who handles a Moran bore permit near Texas State Highway 6?
For a bore beneath Texas State Highway 6 in Moran, the line owner files the utility permit in TxDOT’s RULIS system, and the TxDOT Abilene District reviews it. We prepare the bore plan and profile for the utility owner’s application and work under its permit. TxDOT requires boring or tunneling beneath existing highway pavement; rural highway bores extend beneath all travel lanes. Required cover at a crossing is 60 inches for electric and communication lines and water lines, and for pressurized sewer. Moran’s incorporated city streets, including Fisher Street, belong to the city. Deep Creek is checked for possible U.S. Army Corps of Engineers jurisdiction during crossing planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may be near a Moran bore by the City of Moran system?
The City of Moran public water system uses purchased surface water and serves 235 people through 138 service connections. That system may be a factor when planning a new service along Post Oak Avenue. Utilities reporting electric service in Shackelford County include AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative, Comanche County Electric Cooperative Association and Taylor Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Moran | Public water system | Surface water bought from another system | 138 connections, 235 people served |
| AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative, Comanche County Electric Cooperative Association and Taylor Electric Cooperative | Electric utilities reporting service in Shackelford County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates put Moran’s median housing year at 1948, with 74 percent of homes built before 1960. Older homes along Ground Street may call for replacement service routes, while a new service has a different scope. On Texas State Highway 6 bore paths, we hydrovac pothole each marked utility before drilling near it. Paint shows a line’s position, not its depth, so exposed lines help guide the route.

Where is Moran in relation to Breckenridge and our Yukon yard?
Moran is an incorporated city in Shackelford County, Texas, at an elevation of 1,363 feet and covering 0.42 square miles. The city’s ZIP code is 76464. Putnam is 12.3 miles south, Albany is 14.5 miles northwest, Cisco is 15.4 miles southeast, and Baird is 17.0 miles southwest. Breckenridge, the nearest larger city, is 20.7 miles northeast; Albany is the county seat. Our Yukon yard is 265 road miles away, a 5.8 hour drive, which factors into mobilizing for a Moran job.
Places near Moran
- Directional boring in Putnam: 12.3 miles south
- Directional boring in Albany: 14.5 miles northwest
- Directional boring in Cisco: 15.4 miles southeast
- Directional boring in Baird: 17 miles southwest
- Directional boring in Breckenridge: 20.7 miles northeast
Which Moran jobs could call for a bore under Post Oak Avenue?
- Highway crossing: A water or conduit bore beneath Texas State Highway 6 needs a route and profile planned for the highway pavement and travel lanes.
- Street service: A replacement water line along Fisher Street can pass beneath the roadway without an open cut across the paved surface.
- Fiber route: A fiber conduit beneath Post Oak Avenue can connect properties while keeping the street surface intact.
- Creek crossing: A line route near Deep Creek needs planned depth and a check for possible federal jurisdiction.
- Water service: A new connection near the City of Moran system needs its route coordinated with the existing water connections.
- Emergency repair: An urgent bore near Ground Street can use Trinity’s 24 hour response, with marked utilities exposed before drilling near them.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to price a Moran bore near South Avenue?
For a Moran quote, send the address or map pin first, such as a point on South Avenue. Tell us what will go underground, whether that is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and footage. A sketch or plans help us see the route and any nearby roads or crossings.
Price follows the route and conditions, starting with the clay and any weathered bedrock mapped in Moran because they affect drilling and reaming. The number of utilities to expose, pipe size, footage, pavement and pits also matter. A Deep Creek crossing or work beneath Texas State Highway 6 adds crossing details to plan. Excavator time, sand backfill, emergency timing and mobilization from the Yukon yard can also change the scope.
Questions people ask about boring in Moran
Does Trinity Boring Solutions take directional boring work in Moran, Shackelford County?
Yes. We take directional boring work in Moran, with our own crews and vetted partner drilling contractors supporting the job. Our Yukon office is 265 road miles away, so we plan mobilization for work near Texas State Highway 6 or Deep Creek. For a planned FM 576 crossing, we handle your project from the first call through the bore log.
Who runs Moran’s water system in Shackelford County, and where does its water come from?
For bore planning on Post Oak Avenue, we account for the City of Moran’s public water system, which uses purchased surface water. The system serves 235 people through 138 service connections; we consider that scale when planning underground work in Moran. For a new line near Post Oak Avenue, the existing system and service route are details to account for before drilling.
Which electric utilities report service in Moran, Shackelford County, and who confirms conduit specs?
AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative, Comanche County Electric Cooperative Association and Taylor Electric Cooperative report service in Shackelford County. The line owner for the specific Moran address must be confirmed before a conduit bore, including any requirements for a route near Fisher Street.
Does Moran control Fisher Street, and does a bore have to cut the road?
Moran is incorporated, so Fisher Street and other city streets belong to the city. A bore can pass beneath the street without cutting across its surface. If the route is instead beneath Texas State Highway 6, TxDOT rules call for boring or tunneling under existing pavement.
What do Moran’s older homes near Ground Street mean for replacement bores?
The American Community Survey 2019 to 2023 estimates give Moran a median housing year of 1948, with 74 percent of homes built before 1960. That age can make replacement services a consideration near Ground Street, but the route still needs utility locates and potholes before drilling near marked lines.
Can Wichita soil in Moran corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across Moran, including areas mapped as Wichita clay loam. The line owner chooses materials and any coatings for steel casing or tracer wire. HDPE does not share the steel corrosion concern, but the right choice depends on the line design near Post Oak Avenue.
Can I reach Trinity after hours about an urgent bore near Fisher Street in Moran?
Yes. Trinity answers the phone 24 hours a day at (405) 409-7423, including for urgent work near Fisher Street. We can discuss the location, what needs to go underground and any nearby marked utilities to expose before a drill approaches.
How far ahead should I request utility marks for a Moran bore on Post Oak Avenue?
Texas811 needs a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and not more than 14 days ahead. If work on Post Oak Avenue slips more than 14 days past the notice, submit a new request. If marks are worn or moved along Railroad Street, we ask for refreshed markings through Texas811 before work continues.
What affects the cost of a Moran bore beneath Texas State Highway 6?
The price depends on footage, pipe or conduit size, soil and rock, utility crossings, pavement, pits and equipment time. Moran’s Wichita clay can affect the drilling plan, and a Texas State Highway 6 crossing adds permit and profile work. Creek crossings and mobilization from the Yukon yard also affect the scope.
Where the Moran facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Moran
- U.S. Census Bureau, TIGER/Line 2024: Moran boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Moran
- U.S. Census Bureau, American Community Survey 2019 to 2023: Moran housing units and year built
- Macrostrat geologic map compilation: map units under Moran
- U.S. EPA Safe Drinking Water Information System: public water systems serving Moran
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Shackelford County
- U.S. Geological Survey, Elevation Point Query Service: Moran elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Moran
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Moran
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Moran, Texas
Type the address of your job in Moran. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Moran
All counties: Texas county list.
