Bailey Texas Directional Boring: Fairlie Clay, Texas State Highway 78, Gober Chalk
Quick Answer: What does the top five feet look like in Bailey? The USDA soil survey maps Fairlie soil with heavy clay across most of the city, and weathered bedrock within five feet across the mapped area. We do directional boring, also called horizontal directional drilling (HDD), for routes such as Texas State Highway 78 in Bailey, Texas. The Yukon main office is 215 road miles away, a factor when planning work near Main Street. Clay can cling to the reamer, so staged passes and controlled drilling fluid matter here.
Bailey bores at a glance
- Incorporated city in Fannin County, Texas. Population 241 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 215 miles, about 4.4 hours of driving.
- Ground: Fairlie soil is mapped on 82 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 100 percent of the area.
- Highways inside the boundary: Texas State Highway 78, Texas State Highway 11 and FM 1491. State permit office: TxDOT Paris District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Bailey, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Bois d’Arc Street in Bailey?
Trinity Boring Solutions takes directional boring work in Bailey, Fannin County, where the Census Bureau Vintage 2024 estimate puts the population at 241. We install water, sewer, gas, electric conduit and fiber lines, including service routes along Bois d’Arc Street or connections crossing Main Street. The route and line type determine the bore plan, and we stay involved from the first call through the bore log.
Our main office is in Yukon, Oklahoma, and Bailey work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa; a typical Bailey job beside Bois d’Arc Street is a smaller service route. Our family business started in 1965, and we have done directional boring since 1982, with no utility strike in over 25 years.

What does the Fairlie soil survey show beneath Bailey?
The USDA soil survey maps Fairlie soil across 82 percent of Bailey and Austin soil across 18 percent. Fairlie Dalco complex is mapped on 1 to 3 percent slopes, while the Austin map unit is silty clay loam on similar slopes. Clay is the mapped surface texture across 82 percent of the city; at about 40 inches, clay is mapped under 82 percent and bedrock under 18 percent. The mapped average clay content at that depth is 50 percent. These are mapped soil patterns, not test borings, so a route near Main Street still needs site specific planning.
| USDA soil survey, inside the Bailey city limits | What is mapped |
|---|---|
| Soil series mapped | Fairlie 82 percent and Austin 18 percent |
| Texture at the surface | clay 82 percent and silty clay loam 18 percent |
| Texture about 40 inches down | clay 82 percent and bedrock 18 percent |
| Engineering class about 40 inches down | fat clay (CH) 82 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 100 percent of the area (0 percent hard rock, 100 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Weathered bedrock is mapped within five feet across Bailey, with a typical depth of 50 inches; hard bedrock is not mapped within that depth. The geologic map names Gober Chalk and Roxton Limestone, both Late Cretaceous units, so chalk may slow a bore compared with soil. Seasonal water table and flood prone soils are not mapped in the city. High steel corrosion risk is mapped across the area, which makes the line owner’s material choice relevant for any steel casing or tracer wire near Bois d’Arc Street.
How do we bore Bailey clay without losing the line?
Fairlie clay can stay open yet stick to tooling and grip pipe. On a route near Texas State Highway 78, we match fluid and reaming steps to the ground, then track the head as the bore advances.
- Clay control: Near Bois d’Arc Street, we use thinner fluid with polymer and ream in stages so Fairlie clay is less likely to ball on the reamer.
- Same day pullback: Because heavy clay can swell and grip pipe, we plan to pull the line soon after opening the hole on a Main Street route.
- Returns watch: Along Texas State Highway 78, we watch fluid returns and keep pressure controlled so clay does not lift pavement.
- Rock transition: Where a route meets the mapped Gober Chalk, we use a suitable soil bit and take care at the soil to chalk contact, where steering can shift.

What does a bore have to cross in Bailey near Texas State Highway 78?
Texas State Highway 78 has 1.5 mapped roadway miles inside Bailey, with Texas State Highway 11 and FM 1491 also inside the limits. A line beneath existing highway pavement is bored or tunneled rather than open cut. Bois d’Arc Street and Main Street are each mapped for 0.76 miles in the city, followed by Church Street at 0.39 miles. Those streets give a route planner several local corridors to consider, but marked utilities and pavement still affect where entry and exit pits can fit.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 78 | State highway | 1.5 roadway miles inside | State highway office |
| Texas State Highway 11 | State highway | 0.5 roadway miles inside | State highway office |
| FM 1491 | State highway | 0.2 roadway miles inside | State highway office |
| Spring Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Loring Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Bailey or within one mile outside its limits, so a mapped track crossing is not part of the city route picture. Spring Creek lies 0.6 miles beyond the limits and Loring Creek 0.7 miles beyond them; neither has a mapped street crossing inside the city. If a proposed route reaches a creek, we check during planning whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. No lake or pond is mapped within one mile.
Who approves a Bailey bore on roads in Fannin County?
Texas State Highway 78, Texas State Highway 11 and FM 1491 are state roads, so work in their right of way goes through TxDOT. The TxDOT Paris District reviews the utility permit application. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that owner’s application and work under its permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with the bore extending under all travel lanes on rural highways. Bailey’s city streets, including Main Street, belong to the city. A creek route near Spring Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Bailey system?
The City of Bailey public water system uses groundwater wells and serves 220 people through 155 service connections. That makes existing water lines a key locate and exposure item for nearby work on Main Street. Electric service reported in Fannin County includes Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association. We confirm the line owner for the specific route before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Bailey | Public water system | Groundwater wells | 155 connections, 220 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association | Electric utilities reporting service in Fannin County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Bailey’s median housing year at 1976. Survey estimates say 32 percent of Bailey homes were built before 1960, 40 percent from 1960 to 1999 and 28 percent in 2000 or later; we consider Fairlie soils. A route near Leslie Street could serve a replacement line for older housing or a newer connection. Before drilling near marked lines, we hydrovac pothole each one on the bore path; paint shows position, not depth.

Where is Bailey in relation to Leonard and nearby towns?
Bailey is an incorporated city in Fannin County, covering 0.4 square miles at an elevation of 719 feet. For underground work around Main Street, we confirm the address because Bailey uses ZIP codes 75413, 75496 and 75452. Leonard is 5.8 miles southwest, Wolfe City is 7.0 miles southeast, and Bonham is 10.8 miles north; Bonham is both the county seat and the nearest larger city. Our Yukon, Oklahoma main office is 215 road miles away, about a 4.4 hour drive, which matters when planning mobilization for a route on Bois d’Arc Street or beyond the city limits.
Places near Bailey
- Directional boring in Leonard: 5.8 miles southwest
- Directional boring in Wolfe City: 7 miles southeast
- Directional boring in Celeste: 10.1 miles south
- Directional boring in Trenton: 10.4 miles west
- Directional boring in Bonham: 10.8 miles north
Which jobs call for a bore near Main Street in Bailey?
- Water service: A connection near the City of Bailey groundwater system may need a route that avoids marked water lines near Main Street.
- Highway crossing: A utility route beneath Texas State Highway 78 is bored or tunneled, with highway pavement left uncut.
- Fiber conduit: A fiber drop beside Bois d’Arc Street can use a narrow bore, subject to the marked utilities along its path.
- Creek crossing: A proposed route toward Spring Creek needs a depth plan and a jurisdiction check during planning.
- Street connection: A service crossing near Leslie Street can pass beneath pavement while entry and exit pits stay in the dirt.
- Electric conduit: Near FM 1491, the line owner is confirmed before conduit work is planned for the selected route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for work near Leslie Street in Bailey?
For a Leslie Street quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route crossing Texas State Highway 78 or running near Main Street may need different access and pit planning. Those details let us assess the actual path instead of pricing from a street name alone.
The biggest local price variable is the ground: Fairlie clay can cling to the reamer, while weathered chalk mapped within five feet can slow progress. Next, the number of utilities to expose and any highway, pavement or creek crossing can change the work plan. Pipe size, length, pit needs, excavator time and sand backfill also matter. Mobilization reflects the 215 road miles from Yukon, and high profile or emergency timing can add planning demands. The route near Texas State Highway 78 determines which of those factors apply.
Questions people ask about boring in Bailey
Does Trinity Boring Solutions take directional boring jobs in Bailey and Fannin County, and who staffs them?
Yes. We take work in Bailey and across Texas, and work is handled by our crews or satellite yards operated by partner drilling contractors we have vetted. We work with you from the first call through the bore log for a crossing near Lusk Street. For a route near Bois d’Arc Street, the assigned crew still follows the same job plan and reporting process.
Is there rock beneath Bailey, and how much bedrock is mapped within five feet?
The USDA soil survey maps bedrock within five feet across Bailey, typically at 50 inches, and maps weathered bedrock across the area. We account for Fairlie and Austin soil series; hard bedrock is not mapped within that depth. The geologic map identifies Gober Chalk and Roxton Limestone, so a bore near Texas State Highway 78 may encounter chalk and take longer than a soil only route.
Does TxDOT Paris District approve a bore under Texas State Highway 78 in Bailey?
TxDOT reviews work in the right of way for Texas State Highway 78 through its Paris District. The utility that owns the line submits the application online through RULIS, while we prepare the bore plan and profile for the filing. The permit applies to the utility owner, and we work under that issued permit.
Can a line be bored under Spring Creek near Bailey?
It may be possible, but the route and ground conditions have to be reviewed first. Spring Creek is mapped 0.6 miles outside Bailey’s limits, and no street crossing of a named stream is mapped inside the city. Planning checks whether a proposed Spring Creek crossing falls under U.S. Army Corps of Engineers jurisdiction.
Who runs Bailey’s public water system near Bonham, and does it draw water from groundwater wells?
The City of Bailey owns and operates the public water system, which uses groundwater wells. The system serves 220 people through 155 connections. That nearby network matters for a bore around Main Street because marked water lines on the planned path need exposure before drilling gets close.
Which electric utilities report service in Bailey and Fannin County, and who confirms conduit specs?
Utilities reporting service in Fannin County include Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association. The specific line owner is confirmed for the route, then that owner confirms conduit requirements before a bore near Bois d’Arc Street is planned.
Does Trinity cover Leonard and rural sites outside Bailey?
Yes. We take work around Bailey, including Leonard, 5.8 miles southwest, and rural routes beyond the city limits. Each address needs its own route and access review. A job extending from Bailey toward Leonard can involve different line locations, road conditions and mobilization than a short service route near Main Street.
How much notice does Texas811 need for a bore along Bois d’Arc Street in Bailey, and what if marks move?
For a bore along Bois d’Arc Street, the excavator or contractor requests a locate through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a Texas State Highway 11 bore in Bailey, if the start slips more than 14 days past the original notice, we make a new request. Before continuing a bore near Spring Creek, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore under Texas State Highway 78 in Bailey?
The route and scope determine the price. Fairlie clay and weathered chalk affect drilling time; crossing Texas State Highway 78 brings highway pavement and permit planning into the scope. Line size, bore length, utility exposures, pit work, concrete or pavement, and any creek crossing also matter. Mobilization from the Yukon office is affected by the 215 road miles to Bailey.
Where the Bailey facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Bailey
- U.S. Census Bureau, TIGER/Line 2024: Bailey boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Bailey
- U.S. Census Bureau, American Community Survey 2019 to 2023: Bailey housing units and year built
- Macrostrat geologic map compilation: map units under Bailey
- U.S. EPA Safe Drinking Water Information System: public water systems serving Bailey
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Fannin County
- U.S. Geological Survey, Elevation Point Query Service: Bailey elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Bailey
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Bailey
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Bailey, Texas
Type the address of your job in Bailey. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.