Leonard Texas Directional Boring: Fairlie Clay, US 69 and Deal Creek
Quick Answer: What does the top five feet look like in Fairlie soil around Leonard? The USDA soil survey maps clay across 84 percent at about 40 inches and weathered bedrock within 60 inches across 96 percent. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for lines crossing Deal Creek or US 69. Leonard is 212 road miles from our Yukon, Oklahoma main office, and Fairlie clay can grip a reamer.
Leonard bores at a glance
- Incorporated city in Fannin County, Texas. Population 2,203 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 212 miles, about 4.2 hours of driving.
- Ground: Fairlie soil is mapped on 80 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 96 percent of the area.
- Highways inside the boundary: US 69, Texas State Highway 78, FM 896, FM 1553 and FM 272. State permit office: TxDOT Paris District.
- Railroad track inside the boundary: Dallas, Garland and Northeastern Railroad, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Deal Creek and South Sulphur River.
- Public water: City of Leonard, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Fannin Street in Leonard?
What does the top five feet look like beneath Fannin Street? The USDA soil survey maps clay at about 40 inches, with weathered bedrock mapped within 60 inches. Leonard is in Fannin County and has a population of 2,203, according to the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber where routes along Main Street or US 69 need to pass beneath pavement or other lines.
Our main office is in Yukon, Oklahoma, and Leonard work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a small service near Main Street, we offer 3/4 inch sizing, casing up to 48 inch, and bore lengths from 10 feet to 5,000 feet. Our family business started in 1965 and has done directional boring since 1982, experience that serves jobs from Fannin Street to US 69.

How does Fairlie soil affect drilling in Leonard?
The USDA soil survey maps Fairlie soil across 80 percent of Leonard. Fairlie clay, with 0 to 1 percent slopes, covers 8 percent, while Fairlie Dalco complex, with 1 to 3 percent slopes, covers 72 percent. Clay is the mapped surface texture across 84 percent of the city, and at about 40 inches the survey maps clay across 84 percent, with average clay content of 50 percent. For a Leonard bore route, we use mapped soil patterns as planning context, not as test borings or confirmation of subsurface conditions. For a bore near Cedar Street, heavy clay can hold an open hole but stick to the reamer and grip pipe.
| USDA soil survey, inside the Leonard city limits | What is mapped |
|---|---|
| Soil series mapped | Fairlie 80 percent, Howe 8 percent, Stephen 4 percent and Whitewright 3 percent |
| Texture at the surface | clay 84 percent, clay loam 8 percent and silty clay 4 percent |
| Texture about 40 inches down | clay 84 percent and bedrock 15 percent |
| Engineering class about 40 inches down | fat clay (CH) 84 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 96 percent of the area (0 percent hard rock, 96 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
Weathered bedrock is mapped within 60 inches across 96 percent of Leonard, with typical bedrock depth at 48 inches; hard bedrock is not mapped within that depth. The geologic map identifies Gober Chalk and Roxton Limestone of Late Cretaceous age, so the drill may slow as it reaches chalk or a soil to rock contact. A seasonal water table is not mapped within 60 inches, while flood prone soils cover 1 percent. High steel corrosion risk is mapped across 99 percent, a concern for casing and tracer wire that the line owner should address.
How is a bore run through Leonard clay?
Fairlie clay covers much of Leonard, so we plan the bore for sticky cuttings and the mapped weathered bedrock. A route beneath Cedar Street or toward Deal Creek gets its own locating and depth plan.
- At a Fairlie clay route, we use thinner drilling fluid and polymer, then ream in stages to limit sticky cuttings and pipe grip.
- Near US 69 pavement, we watch fluid returns and keep pressure controlled so clay does not lift the surface.
- Where mapped weathered bedrock approaches the bore near Leonard, we slow the cut and track the head through the soil to rock contact.
- Before a route near Deal Creek advances, we expose each marked utility with hydrovac and log drill head depth and pitch.

Where might a Leonard line pass under US 69?
US 69, Texas State Highway 78, FM 896, FM 1553 and FM 272 are mapped within Leonard. A bore beneath existing highway pavement uses boring or tunneling, keeping the surface route intact. Fannin Street is the longest named street at 1.29 miles within the city; Main Street measures 1.03 miles and Cedar Street 0.98 miles. Those streets give a project a defined route to assess for pavement, driveways and existing utilities before setting bore pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 69 | US highway | 9 roadway miles inside | State highway office |
| Texas State Highway 78 | State highway | 13.6 roadway miles inside | State highway office |
| FM 896 | State highway | 4.5 roadway miles inside | State highway office |
| FM 1553 | State highway | 3.5 roadway miles inside | State highway office |
| FM 272 | State highway | 3.4 roadway miles inside | State highway office |
| Dallas, Garland and Northeastern Railroad | Railroad | 2.01 track miles inside | The railroad |
| Deal Creek | Stream | 1.03 channel miles inside | Checked for Corps of Engineers jurisdiction |
| South Sulphur River | Stream | 0.04 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mustang Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Jacobs Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Lee Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Bear Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Thornton Lake | Lake or pond | 23 acres, nearby | Checked for Corps of Engineers jurisdiction |
The Dallas, Garland and Northeastern Railroad has 2.01 track miles in Leonard, and 3 street and rail crossings are mapped. A track crossing needs an agreement with that railroad, which sets crossing conditions such as casing, depth and flagging. Deal Creek runs 1.03 channel miles in the city, and the South Sulphur River 0.04 miles; 10 street crossings of named streams are mapped. Thornton Lake is nearby but outside city limits, so its location matters only if a proposed route approaches it.
Who approves a Leonard bore near US 69 or Dallas, Garland and Northeastern Railroad?
Leonard’s city streets, including Fannin Street, belong to the city itself. For work in the right of way of US 69, Texas State Highway 78 or an FM road, the utility owner applies for the TxDOT utility permit through RULIS; the TxDOT Paris District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. TxDOT cover rules call for 60 inches for electric and communication lines at highway crossings, 48 inches along the right of way, and 60 inches for water at crossings. Pressurized sewer crossings also call for 60 inches. The railroad crossing agreement governs a route under the Dallas, Garland and Northeastern Railroad. Deal Creek and other water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines are already in the ground in Fannin County near Leonard?
The City of Leonard public water system serves 2,691 people through 897 service connections, which we account for when planning underground work. For a water service near Cedar Street, that system is a useful starting point for confirming the line owner and route. Electric service reporting in Fannin County includes Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Leonard | Public water system | Groundwater wells | 897 connections, 2,691 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association | Electric utilities reporting service in Fannin County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Leonard’s median housing year at 1973; 31 percent of homes were built before 1960, and 24 percent in 2000 or later. A replacement route along Main Street may meet older buried lines, while newer services can require a separate path. Paint shows a marked line’s position, not its depth, so we hydrovac pothole marked utilities before the drill approaches them. Near a water connection or electric conduit, that exposure confirms the crossing point and depth.

Where is Leonard in relation to Trenton and our Yukon yard?
Leonard is an incorporated city in Fannin County, with an elevation of 723 feet and a land area of 2.29 square miles. Its ZIP code is 75452. Bailey is 5.8 miles northeast, Trenton is 6.4 miles northwest, and Celeste is 7.1 miles southeast. Bonham, the county seat and nearest larger city, is 14.5 miles north. The route from our Yukon, Oklahoma yard is 212 road miles and a 4.2 hour drive, which is part of planning a bore near US 69 or Deal Creek.
Places near Leonard
- Directional boring in Bailey: 5.8 miles northeast
- Directional boring in Trenton: 6.4 miles northwest
- Directional boring in Celeste: 7.1 miles southeast
- Directional boring in Wolfe City: 10.1 miles east
- Directional boring in Blue Ridge: 10.6 miles southwest
- Directional boring in Bonham: 14.5 miles north
What kinds of bores may come up near Main Street in Leonard?
- Highway crossing: A bore beneath US 69 can carry water, sewer or conduit while keeping the highway surface uncut.
- Water service: A route near Cedar Street can connect a service to the City of Leonard groundwater system.
- Fiber conduit: A bore along Main Street can pass beneath pavement and marked utilities without opening a trench across the street.
- Creek crossing: A route beneath Deal Creek needs a planned bore path and a check for federal jurisdiction during planning.
- Rail crossing: A line beneath the Dallas, Garland and Northeastern Railroad needs the railroad’s crossing agreement and its stated conditions.
- Electric conduit: A route near Fannin Street starts with confirming the electric line owner and exposing marked utilities.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Leonard bore near Deal Creek?
A map pin matters near Deal Creek because the crossing location can change the route, access and planning needs. Send the Leonard address or pin, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see how the route meets US 69, a street or the Dallas, Garland and Northeastern Railroad.
For Leonard, ground conditions come first: Fairlie clay can cling to tooling, and weathered bedrock may slow a bore. The number of utilities to expose, pipe size and bore length also shape the work. A crossing at US 69, the railroad or Deal Creek adds route and crossing details. Pavement, pits, excavator time and sand backfill affect the scope, as does mobilization for a site 212 road miles from Yukon. High profile or emergency work can also change the plan.
Questions people ask about boring in Leonard
Does Trinity Boring Solutions take directional boring work in Leonard and Fannin County, and who staffs it?
Yes. We take directional boring work in Leonard and across Texas, with our own crews and crews working from partner drilling contractors’ satellite yards. We stay involved from the first call through the bore log, whether the route is near Fannin Street or outside the city.
Can a line be bored under Deal Creek in Leonard?
A bore can be planned beneath Deal Creek, but the route and ground conditions need review first. The creek has 1.03 channel miles within Leonard, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. We also locate and expose marked utilities along the route.
Who runs Leonard’s public water system, and does it use groundwater wells?
When planning near the City of Leonard system, we account for its groundwater wells as the water source. With 897 service connections serving 2,691 people, we plan underground work in Leonard without assuming connection locations. For a proposed service near Cedar Street, confirm the existing line and connection point before setting the bore route.
Which electric providers report service in Fannin County near Leonard, and who confirms conduit specs?
Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association report electric service in Fannin County. The line owner for the specific Leonard address should confirm conduit specifications before a bore is planned.
Who is responsible for Cedar Street in Leonard, and can a bore avoid cutting it?
Because Leonard is incorporated, we treat its city streets as city property when planning boring access and street work. A directional bore can pass beneath Cedar Street without cutting the street surface, subject to the route and utility locations. The street is 0.98 miles long within the city, so the exact crossing point matters.
What does Leonard’s housing age near Main Street mean for replacement bores?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1973, with 31 percent of homes built before 1960. A replacement bore near Main Street may meet older buried lines. We expose marked utilities before drilling near them because surface marks do not show depth.
Does Trinity cover Bailey and rural sites outside Leonard?
Yes. We take work in Texas beyond Leonard’s city limits, including routes near Bailey, 5.8 miles northeast of Leonard. A rural site still needs an address or map pin, the line type, size and footage so we can assess its route and mobilization.
How much notice does Texas811 need for a bore near Fannin Street in Leonard?
For a bore near Fannin Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For a Leonard start moved more than 14 days past the original notice, we make a new request. On Leonard work, we refresh worn or moved marks through Texas811 before continuing with the bore.
What affects the cost of a directional bore near US 69 in Leonard?
The Leonard price depends first on Fairlie clay and any weathered bedrock, then on pipe size, bore length and utilities that need exposure. A US 69, railroad or Deal Creek crossing adds route requirements. Pavement, pits, equipment time, backfill and mobilization from Yukon also affect the job scope.
Where the Leonard facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Leonard
- U.S. Census Bureau, TIGER/Line 2024: Leonard boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Leonard
- U.S. Census Bureau, American Community Survey 2019 to 2023: Leonard housing units and year built
- Macrostrat geologic map compilation: map units under Leonard
- U.S. EPA Safe Drinking Water Information System: public water systems serving Leonard
- U.S. Department of Transportation, North American Rail Network: track owners in Fannin County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Fannin County
- U.S. Geological Survey, Elevation Point Query Service: Leonard elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Leonard
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Leonard
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Leonard, Texas
Type the address of your job in Leonard. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Leonard
Same county: Honey Grove · Savoy · Ector · Ladonia · Dodd City · Windom · Ravenna · Pecan Gap. All counties: Texas county list.
