trinityboringsolutions.com

Pecan Gap Texas Directional Boring: Wilson Silt Loam, FM 64 and Jennings Creek

Quick Answer: FM 64 is the main route to plan around, and Trinity Boring Solutions provides directional boring, or horizontal directional drilling (HDD), in Pecan Gap, Texas. The Yukon, Oklahoma main office is 238 road miles away, so work near Main Street needs mobilization planned around that run. Wilson silt loam is common at the surface, while clay makes up 85 percent of mapped soil about 40 inches down. That sticky layer can load a reamer and grip pipe, so we manage fluid and stage the ream before pulling.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pecan Gap bores at a glance

  • Incorporated city in Delta County and Fannin County, Texas. Population 186 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 238 miles, about 4.8 hours of driving.
  • Ground: Wilson soil is mapped on 40 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 34 percent of the area.
  • Highways inside the boundary: FM 64, FM 904 and FM 128. State permit office: TxDOT Paris District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Pecan Gap near Jennings Creek?

With FM 64 running through town, we take directional boring work in Pecan Gap, Delta County, for water, sewer, gas, electric conduit and fiber routes along streets such as Main Street or Mayo Street. At 186 residents, Pecan Gap’s Census Bureau Vintage 2024 estimate helps us plan underground work along Main Street. Even in a small service area, the route plan needs to match the address and the lines already in the ground.

Our main office is in Yukon, Oklahoma, and Pecan Gap work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965 and moved into directional boring in 1982. For a Mayo Street service route, our range covers 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Pecan Gap and Wilson soil?

The USDA soil survey maps Wilson soil across 40 percent of Pecan Gap and Crockett soil across 33 percent. Wilson silt loam, 0 to 2 percent slopes, covers 33 percent of mapped area; Crockett loam, 1 to 3 percent slopes, covers another 33 percent. Silt loam and loam are common surface textures. About 40 inches down, clay is mapped under 85 percent of the area, with silty clay loam under 14 percent. The mapped clay share averages 44 percent at that depth. These are mapped patterns, not test borings, so the address still matters.

USDA soil survey, inside the Pecan Gap city limitsWhat is mapped
Soil series mappedWilson 40 percent, Crockett 33 percent, Lamar 14 percent, Leson 9 percent and Houston Black 4 percent
Texture at the surfacesilt loam 40 percent, loam 33 percent and clay loam 14 percent
Texture about 40 inches downclay 85 percent and silty clay loam 14 percent
Engineering class about 40 inches downfat clay (CH) 85 percent and lean clay (CL) 14 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inches34 percent of the area (0 percent hard rock, 34 percent weathered rock)
Seasonal water table within 60 inches6 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel86 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches under 34 percent of Pecan Gap and within 40 inches under 1 percent; hard bedrock is not mapped within 60 inches. Weathered rock can slow the bore, while the survey shows a seasonal water table within 60 inches under 6 percent of the area. Flood prone soils are not mapped, but we account for silt loam when planning bores near Jennings Creek. High steel corrosion risk is mapped under 86 percent, so the line owner should set any coating for steel casing or tracer wire; HDPE avoids that soil corrosion concern. The geologic map names the Late Cretaceous Wolfe City Sand, with sand and silt above calcareous mudstone, so ground conditions may change along a route.

How do we plan a bore through Pecan Gap clay with the Wilson soil series in mind?

Pecan Gap’s mapped clay at about 40 inches can stick to the reamer and grip pipe. We plan the fluid, reaming sequence and pull around that ground, using the route and access near streets such as Main Street.

  1. We track the drill head from the surface and log depth and pitch as it advances near FM 64, then compare the bore path with the plan at each rod.
  2. In Pecan Gap clay, we use thinner drilling fluid with polymer and ream in stages to limit sticky buildup before pulling pipe through the opened hole.
  3. Wilson silt loam can drill quickly but wash out under excess fluid, so we keep pressure low beneath pavement on Main Street or FM 64.
  4. Where the mapped Wolfe City Sand ground changes toward weathered rock, we slow down and watch steering near the soil and rock contact.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

What does a bore have to cross in Pecan Gap near FM 64?

FM 64 has 1.9 mapped roadway miles within Pecan Gap. FM 904 has 0.3 miles and FM 128 has 0.2 miles inside the limits, with no other state highways mapped within 1.5 miles outside them. Main Street is the longest named street at 1.12 miles, followed by Mayo Street at 0.6 and Merrill Street at 0.56. Miller Street runs 0.46 miles. A bore can keep pavement and driveways uncut, but a route under a state highway needs a permitted bore plan and the required cover.

CrossingTypeMapped extentWho has a say
FM 64State highway1.9 roadway miles insideState highway office
FM 904State highway0.3 roadway miles insideState highway office
FM 128State highway0.2 roadway miles insideState highway office
Jennings CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
East Fork Jernigan CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Johns CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Old River ChannelStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Railroad tracks are not mapped inside Pecan Gap or within one mile outside the limits, and no mapped street and rail crossings are shown. No named stream crosses a city street in the mapped limits. Jennings Creek runs along or touches the boundary; East Fork Jernigan Creek is 0.4 miles away, Johns Creek 0.7 miles and Old River Channel 0.8 miles. The survey maps 0.25 miles of unnamed drainage inside the city and no lakes or ponds within one mile. A planned creek crossing needs a check for U.S. Army Corps of Engineers jurisdiction.

Who approves a Pecan Gap bore in Delta County?

Pecan Gap’s incorporated status in Delta County means we coordinate Main Street boring plans with the city that owns its streets. For work in the right of way of FM 64, FM 904 or FM 128, the line owner, not the driller, submits the utility permit application through TxDOT’s online RULIS system. The TxDOT Paris District reviews it. For crossings on FM 128, we provide the bore plan and profile and work under the utility owner’s permit through TxDOT Paris District. TxDOT cover rules set 60 inches below the lowest crossed grade for electric and communication lines, 60 inches for water crossings and pressurized sewer crossings, and the district can require another depth. The state requires highway pavement crossings to be bored or tunneled, with casing; a rural highway bore extends beneath all travel lanes. Jennings Creek also calls for a jurisdiction check during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Pecan Gap, Delta County?

The water provider for a specific Pecan Gap address has to be confirmed with the city, the county or the local water district before a bore is planned; available records do not match a provider to the town. For electric conduit near FM 64, Oncor Electric Delivery Company, Farmers Electric Cooperative and Lamar County Electric Cooperative Association report service in Delta County. Those reports do not establish which company serves a particular address, so the line owner must be confirmed before conduit specifications are set.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Farmers Electric Cooperative and Lamar County Electric Cooperative AssociationElectric utilities reporting service in Delta County and Fannin CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates give Pecan Gap a median housing year of 1987; 22 percent of homes were built before 1960, 31 percent from 1960 to 1999 and 47 percent in 2000 or later. That mix can mean a route serves either an older line being replaced or a newer service. We expose each marked utility on the bore path with hydrovac before drilling near it; locate paint shows position, not depth. For example, a conduit route under Merrill Street needs its marked lines exposed before the drill approaches.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

Where is Pecan Gap in relation to Commerce and nearby towns?

Pecan Gap covers 0.63 square miles at an elevation of 571 feet, mostly in Delta County, with 11 percent of the city in Fannin County. Pecan Gap’s ZIP codes are 75469 and 75449; we use nearby Ladonia to distinguish local underground project locations. Ladonia is 5.5 miles west; Roxton is 10.4 miles northeast; Cooper is 10.4 miles southeast; Honey Grove is 10.8 miles north; and Petty is 11.9 miles north. Cooper is the county seat, while Commerce is the nearest larger city, 13.9 miles south. The Yukon, Oklahoma yard is 238 road miles away, a 4.8 hour drive, which affects mobilization for work near FM 64.

Places near Pecan Gap

What boring work comes up near Mayo Street in Pecan Gap?

  • Highway crossing: A bore beneath FM 64 needs a route and cover plan that meets the TxDOT permit for the utility owner.
  • Water service: A connection near Main Street needs the address specific water provider confirmed before we set the bore route.
  • Electric conduit: A route along Mayo Street needs the electric line owner identified before conduit specifications are selected.
  • Creek crossing: A planned route beneath Jennings Creek needs the channel location and federal jurisdiction checked during planning.
  • Street service: A replacement beneath Merrill Street can leave pavement uncut while marked utilities are exposed before drilling.
  • Fiber route: A run near FM 904 can use a bore plan matched to the conduit size, footage and known crossings.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a Pecan Gap bore quote near Miller Street?

For a Miller Street quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. The route near FM 64 or a named street helps us see which crossings and access points need to be included.

The largest price factor in Pecan Gap is the ground: Wilson silt loam gives way to clay mapped under 85 percent of the area at about 40 inches, which can call for staged reaming and careful fluid control. Next are the number of utilities to expose and any FM 64 pavement or concrete crossings. Creek or drainage crossings, pits, excavator time and sand backfill also change the scope. Mobilization matters because the Yukon yard is 238 road miles away; high profile or emergency work can add planning demands.

Questions people ask about boring in Pecan Gap

Does Trinity Boring Solutions take directional boring jobs in Pecan Gap and Delta County?

Yes. We take directional boring work in Pecan Gap and staff it with our own crews or crews working from satellite yards run by drilling partners we have vetted. You work with Trinity through planning and the bore log, whichever crew is on site. For a route near FM 64, the address and scope help set the plan.

Is there rock under Pecan Gap, and how much bedrock is mapped?

The USDA soil survey maps weathered bedrock within 60 inches under 34 percent of Pecan Gap and within 40 inches under 1 percent. Hard bedrock is not mapped within 60 inches. That points to possible slower drilling in weathered rock rather than a uniform rock route; the Late Cretaceous Wolfe City Sand map unit also includes calcareous mudstone below sand and silt.

Who approves a bore under FM 64 in Pecan Gap?

The utility line owner files the right of way permit through TxDOT’s RULIS system, and the TxDOT Paris District reviews it for FM 64. We provide the bore plan and profile for the filing and work under the permit issued to the owner. The permit sets the approved route and may require a different cover depth than the standard.

Can a line be bored under Jennings Creek near Pecan Gap?

A bore can be planned for a Jennings Creek crossing, but the channel route and site conditions need review first. Jennings Creek touches or follows the Pecan Gap boundary, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. No flood prone soils are mapped in the city, but that does not replace site review.

Which electric companies report service in Delta County near Pecan Gap?

Oncor Electric Delivery Company, Farmers Electric Cooperative and Lamar County Electric Cooperative Association report electric service in Delta County. That does not confirm which company serves an address on Main Street or elsewhere in Pecan Gap. Confirm the line owner before setting conduit specifications or planning a bore beside existing electric lines.

Does the city or county control Merrill Street in Pecan Gap, and must it be cut?

Pecan Gap is an incorporated city, so Merrill Street is a city street, not a county road. A bore can pass beneath the street without opening the pavement, subject to the route and any applicable permit. We expose marked utilities along the path before drilling near them, since surface marks do not show burial depth.

What bore sizes and lengths can Trinity handle for a job on Miller Street in Pecan Gap?

For a Miller Street job, our equipment range covers 3/4 inch service lines through 48 inch casing and bore lengths from 10 feet to 5,000 feet. The right setup depends on what the line carries, the ground and the route. Clay mapped below the surface in Pecan Gap can affect reaming and the pipe pull.

How early should I call Texas811 for a Pecan Gap bore near Main Street?

For a Main Street start, make the Texas811 locate request at least 48 hours ahead, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before work. Texas811 describes that as two working days. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing through Texas811 before work resumes.

What affects directional boring costs near FM 64 in Pecan Gap, where silt loam can influence bore planning?

For a route near FM 64, the answer depends first on Pecan Gap’s clay, which can add reaming and fluid control work. The number of utilities to expose, highway or pavement crossings, pipe size and length, pits, excavator time, backfill and creek or drainage work also affect the scope. Mobilization is another factor because the Yukon yard is 238 road miles away.

Where the Pecan Gap facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pecan Gap

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pecan Gap, Texas

Type the address of your job in Pecan Gap. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pecan Gap

County: Fannin County directional boring. Same county: Bonham · Leonard · Trenton · Savoy · Ector · Dodd City · Bailey · Windom · Ravenna. All counties: Texas county list.