Coyote Flats Texas Directional Boring: Crosstell Soil, FM 3136 and Boss Branch
Quick Answer: The top five feet in Coyote Flats is mapped as fine sandy loam near the surface, with clay and weathered bedrock below. At FM 3136, we use directional boring, also called horizontal directional drilling (HDD), to place lines without cutting pavement. Our Yukon office is 246 road miles away, and Boss Branch touches the city boundary. At 40 inches, clay is mapped across 89 percent of the area, so sticky cuttings call for staged reaming.
Coyote Flats bores at a glance
- Incorporated city in Johnson County, Texas. Population 295 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 246 miles, about 4.9 hours of driving.
- Ground: Crosstell soil is mapped on 51 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 66 percent of the area.
- Highways inside the boundary: FM 3136 and FM 2415. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Coyote Flats near Boss Branch?
Trinity Boring Solutions takes directional boring work in Coyote Flats, Johnson County, where the Census Bureau Vintage 2024 estimate is 295 residents. Along a proposed route beside FM 3136, FM 2415 or Blair Lane, we install water, sewer, gas, electric conduit and fiber. The route and line size determine the bore plan.
Our main office is in Yukon, Oklahoma, and Coyote Flats work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For short service lines as well as larger casing work, our range runs from 3/4 inch lines to 48 inch casing and from 10 feet to 5,000 feet. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to routes near Blair Lane and FM 3136.

What is Coyote Flats ground like to bore in Crosstell soil?
The USDA soil survey maps Crosstell across 51 percent of Coyote Flats, with Crosstell fine sandy loam on 47 percent of the area. Fine sandy loam makes up 55 percent of mapped surface texture, while clay accounts for 31 percent. At about 40 inches below the surface, clay is mapped across 89 percent of the area, and average clay content there is 46 percent. Before we plan a Coyote Flats bore, we treat mapped soil patterns as a guide, not a substitute for test borings. The change from a loamy surface to clay below can make the reamer sticky and the cuttings cling to the tool.
| USDA soil survey, inside the Coyote Flats city limits | What is mapped |
|---|---|
| Soil series mapped | Crosstell 51 percent, Heiden 16 percent, Ferris 15 percent, Navo 5 percent and Gasil 4 percent |
| Texture at the surface | fine sandy loam 55 percent, clay 31 percent and clay loam 9 percent |
| Texture about 40 inches down | clay 89 percent and sandy clay loam 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 87 percent, lean clay (CL) 9 percent and clayey sand (SC) 4 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | 66 percent of the area (0 percent hard rock, 66 percent weathered rock) |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 89 percent of the area |
Weathered bedrock is mapped within 60 inches across 66 percent of Coyote Flats, with typical depth listed as 50 inches; hard bedrock is not mapped in that interval. The Woodbine Formation, of Late Cretaceous age, is the mapped geologic unit, so the soil survey alone does not establish what a specific bore will meet. A seasonal water table within 60 inches is mapped in 1 percent of the area, and flood prone soils in 3 percent. High steel corrosion risk covers 89 percent, so the line owner should consider casing and tracer wire materials.
How do we drill Coyote Flats clay without opening the surface?
Crosstell fine sandy loam at the surface gives way to clay below in Coyote Flats. We match the fluid, reaming sequence and pull timing to the ground, while tracking the drill head along the planned route.
- Crosstell fine sandy loam can lose support behind the bit, so we keep the hole stable with drilling fluid and have the pipe ready before the final ream.
- Clay is mapped across 89 percent of the area at about 40 inches, so we use thinner fluid with polymer, ream in stages and watch returns for pressure buildup.
- Along a proposed route by FM 3136, we hydrovac expose each marked utility before drilling close; a surface locator tracks the head and records depth and pitch.
- For a route near Boss Branch, we plan the bore depth to pass beneath the channel and check during planning whether the crossing falls under Corps jurisdiction.

What does a bore have to cross in Coyote Flats near FM 3136?
FM 3136 has 1.6 mapped roadway miles inside Coyote Flats, and FM 2415 has 1.5. Both are state highways, so a route beneath either needs to be planned as a highway crossing. Blair Lane is the longest named street in the city, with 0.23 miles mapped there. The city has 4.83 public road centerline miles in all. A bore beside Blair Lane or beneath either farm to market road can leave the paved surface uncut, with entry and exit pits placed off the travel way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 3136 | State highway | 1.6 roadway miles inside | State highway office |
| FM 2415 | State highway | 1.5 roadway miles inside | State highway office |
| BNSF Railway | Railroad nearby | 0.9 miles outside | The railroad |
| Boss Branch | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Chambers Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Mustang Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway track is 0.9 miles outside the Coyote Flats limits; no railroad is mapped inside the city, and no street and rail crossing is mapped there. Boss Branch runs along or touches the boundary, while Chambers Creek and Mustang Creek are each 0.3 miles away. The city has 1.17 miles of mapped unnamed drainage and no mapped street crossings of named streams. With no lakes or ponds mapped within one mile of Coyote Flats, we can assess route options without assuming a water crossing. A proposed creek route needs channel depth planning and a jurisdiction check.
Whose permission does a Coyote Flats bore in Johnson County need?
Blair Lane is a city street, so city streets in incorporated Coyote Flats belong to the city itself. FM 3136 and FM 2415 are state highways; for work in their right of way, the line owner, not the driller, submits the utility permit through TxDOT’s RULIS system. The TxDOT Fort Worth District reviews it, and we prepare the bore plan and profile for the owner. Highway cover depends on the line: electric and communication need 60 inches at crossings and 48 inches along the right of way; water needs 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. The district can set another depth in the permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the utilities serving Coyote Flats in Johnson County?
The water provider for a specific Coyote Flats address has to be confirmed with the city, Johnson County or the local water district before a bore is planned. County electric service reporting includes Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service; confirm the line owner for the address before planning conduit. Before drilling near marked lines along FM 3136, we use hydrovac potholing to expose them. Paint shows a line’s position, not its depth, so this also helps identify the water and electric conflicts on the actual route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Johnson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Coyote Flats’ median housing year at 1996. For Coyote Flats, survey estimates 6 percent of homes before 1960, 51 percent from 1960 to 1999 and 43 percent in 2000 or later; we plan bores to site conditions. That mix can mean a bore serves either a replacement line or a newer service near Blair Lane. We expose each marked utility on the path before drilling close to it, since a locate mark does not show burial depth.

How far is Coyote Flats from Keene and our Yukon office?
Coyote Flats is in Johnson County, at an elevation of 856 feet, and covers 1.84 square miles. Across ZIP codes 76031 and 76009, we use the Coyote Flats address to confirm the service location before planning a bore. Keene is 3.3 miles northwest, Alvarado is 6.0 miles northeast, and Cleburne is 7.0 miles west; Cleburne is the county seat. Joshua is 8.9 miles northwest, and Grandview is 9.0 miles southeast. From our Yukon, Oklahoma main office, the road distance is 246 miles and the drive is 4.9 hours. That distance is part of mobilization planning for work near FM 3136.
Places near Coyote Flats
- Directional boring in Keene: 3.3 miles northwest
- Directional boring in Alvarado: 6 miles northeast
- Directional boring in Cleburne: 7 miles west
- Directional boring in Joshua: 8.9 miles northwest
- Directional boring in Grandview: 9 miles southeast
What boring work comes up in Coyote Flats near Blair Lane?
- Highway crossing: A bore beneath FM 3136 or FM 2415 passes under the road surface, with the route and cover planned for the state highway.
- Water service: A proposed service near Blair Lane can be bored from pits in the dirt, avoiding an open cut across the paved street.
- Fiber route: A fiber conduit beside FM 3136 can be installed by directional boring, with marked utilities exposed before the drill approaches.
- Drainage crossing: A proposed route near Boss Branch needs depth planned beneath the channel and a jurisdiction check during planning.
- Rail crossing: A proposed bore toward the BNSF Railway track outside Coyote Flats needs the railroad’s agreement for that crossing.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of Coyote Flats boring near BNSF Railway?
For a Coyote Flats quote, give us the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. A route near FM 3136 or Boss Branch is useful to identify because highway pavement, drainage and channel conditions can change the bore plan.
For a Coyote Flats bore, we price the defined job scope rather than assume one rate for every route. Ground conditions such as clay at 40 inches and the mapped weathered bedrock can affect drilling time and reaming. Crossings matter too: FM 3136 pavement, a drainage route or a planned crossing near BNSF Railway can add planning and exposure work. Length, pipe size, pits, excavator time and sand backfill also shape the work. Mobilization is another factor for Coyote Flats, which is 246 road miles from our Yukon office.
Questions people ask about boring in Coyote Flats
Does Trinity Boring Solutions take jobs in Coyote Flats, Johnson County, and how are crews assigned?
Yes. We take directional boring work in Coyote Flats, Johnson County. Our own crews and satellite yards operated by partner drilling contractors we have vetted can staff the work. You work with Trinity from the initial call through the bore log, including a route near FM 3136.
Can a line be bored under Boss Branch in Coyote Flats?
A bore may be planned beneath Boss Branch, which runs along or touches the Coyote Flats boundary. The route needs enough depth to stay below the channel, and the crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. The alignment and ground conditions determine the approach.
Who owns electric lines in Coyote Flats, Johnson County, and who confirms conduit specifications?
County reports list Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the owner at every Coyote Flats address. Confirm the line owner and conduit requirements for the specific route before planning a bore beside FM 2415.
Who is responsible for Coyote Flats streets in Johnson County, and can Blair Lane stay uncut?
Because Coyote Flats is incorporated, we treat its city streets as belonging to the city when coordinating the street portion of a bore. Directional boring can place a line beneath Blair Lane without an open cut across the pavement, using pits on either side of the route. The specific bore plan depends on marked utilities and access.
How old are buried lines in Coyote Flats, Johnson County, and can replacements use a bore?
Housing age gives context, not an inventory of buried lines. The American Community Survey 2019 to 2023 estimates a median housing year of 1996, with 51 percent of homes built from 1960 to 1999. A replacement route near FM 3136 can be considered for boring after existing utilities are exposed.
Can Crosstell soil in Coyote Flats corrode steel, and what pipe should a bore use?
The USDA soil survey maps high steel corrosion risk across 89 percent of Coyote Flats, including areas mapped as Crosstell soil. The line owner selects casing and tracer wire materials or coatings for the project. For Coyote Flats sites with this soil corrosion concern, we can specify HDPE, which that concern does not affect.
How far is Coyote Flats from Keene and Trinity’s Yukon, Oklahoma main office?
Coyote Flats is 246 road miles and a 4.9 hour drive from our Yukon main office. Keene is 3.3 miles northwest of the city. The Yukon distance affects mobilization planning, while the route near Keene or within Coyote Flats determines the bore equipment and work scope.
How much Texas811 notice does a Coyote Flats bore near Blair Lane need, and what if marks move?
For a bore near Blair Lane, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If a Coyote Flats start slips more than 14 days past the original notice, we submit a new request before proceeding. When marks wear or move on a Coyote Flats job, we refresh them through Texas811 before work continues.
What affects the cost of a Coyote Flats directional bore near FM 3136?
The job details set the price, with no single factor deciding it. Length, pipe or conduit size, clay and weathered bedrock, pavement at FM 3136, utility crossings, pits and excavator time all affect the scope. A route near Boss Branch or mobilization from Yukon can also change the work required.
Where the Coyote Flats facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Coyote Flats
- U.S. Census Bureau, TIGER/Line 2024: Coyote Flats boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Coyote Flats
- U.S. Census Bureau, American Community Survey 2019 to 2023: Coyote Flats housing units and year built
- Macrostrat geologic map compilation: map units under Coyote Flats
- U.S. Department of Transportation, North American Rail Network: track owners in Johnson County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Johnson County
- U.S. Geological Survey, Elevation Point Query Service: Coyote Flats elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Coyote Flats
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Coyote Flats
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Coyote Flats, Texas
Type the address of your job in Coyote Flats. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Coyote Flats
Same county: Burleson · Venus · Mansfield · Pecan Plantation · Godley · Rio Vista · Briaroaks · Cross Timber · Cresson · The Homesteads. All counties: Texas county list.