Pecan Plantation Texas Directional Boring: Bastrop Loamy Fine Sand, Brazos River, Sandy Clay Loam
Quick Answer: At Ravenswood Road, what does the top five feet look like, and what lies below? The USDA soil survey maps sandy clay loam at about 40 inches across 41 percent of Pecan Plantation, while mapped geology includes Early Cretaceous sedimentary units. Trinity handles directional boring, also called horizontal directional drilling (HDD), for routes under the Brazos River and streets such as Bellechase Road. From Yukon, the main office is 254 road miles away, so Ravenswood Road mobilization matters.
Pecan Plantation bores at a glance
- Unincorporated community in Hood County and Johnson County, Texas. Population 6,236 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 254 miles, about 5.2 hours of driving.
- Ground: Bastrop soil is mapped on 39 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 8 percent of the area.
- No state or US highway is mapped inside the boundary or within a mile and a half of it.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Brazos River and Wilson Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring on Ravenswood Road in Pecan Plantation?
Pecan Plantation is an unincorporated community in Hood County, not a city; the Census Bureau counted 6,236 residents in 2020. Along Ravenswood Road or toward the Brazos River, our crews can bore water, sewer, gas, electric conduit and fiber routes without opening the full street.
Our main office is in Yukon, Oklahoma, and Pecan Plantation work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Directional boring has been part of our work since 1982, giving us four decades of experience planning through layers like Bastrop loamy fine sand above sandy clay loam. Our family business started in 1965, and we stay involved from first call through bore log.

What is Pecan Plantation ground like to bore through Bastrop soil?
The USDA soil survey maps Bastrop soil across 39 percent of Pecan Plantation, with Bastrop loamy fine sand on 31 percent. Decordova soil accounts for another 20 percent, and its loamy fine sand map unit covers the same share. At about 40 inches below the surface, sandy clay loam is mapped across 41 percent; fine sandy loam covers 26 percent and very fine sandy loam 14 percent. The survey maps loamy fine sand at the surface across 52 percent. Our Bastrop and Paluxy soil maps show patterns, not test borings for a Pecan Plantation crossing. Sand can loosen behind the drill, so staged reaming and drilling fluid help keep the hole stable.
| USDA soil survey, inside the Pecan Plantation mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Bastrop 39 percent, Decordova 20 percent, Paluxy 14 percent, Yahola 7 percent and Eckrant 6 percent |
| Texture at the surface | loamy fine sand 52 percent, fine sandy loam 17 percent and very fine sandy loam 15 percent |
| Texture about 40 inches down | sandy clay loam 41 percent, fine sandy loam 26 percent and very fine sandy loam 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 48 percent, silty sand (SM) 33 percent and silty clay (CL ML) 7 percent |
| Average clay content about 40 inches down | 20 percent |
| Bedrock mapped within 60 inches | 8 percent of the area (7 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 9 percent of the area |
Bedrock is mapped within 60 inches across 8 percent of Pecan Plantation, including hard bedrock on 7 percent and weathered bedrock on 1 percent; that calls for checking the route rather than assuming one ground condition throughout. Seasonal water tables are mapped within 60 inches on 2 percent, and flood prone soils on 7 percent, so Brazos River areas need depth and water planning. High steel corrosion risk is mapped on 9 percent, a concern for uncoated casing or tracer wire; the line owner selects coatings, while HDPE is not affected by soil corrosion. The mapped units include Pleistocene alluvial gravel, sand, silt, and clay, plus Early Cretaceous sedimentary material.
What does it take to bore Pecan Plantation sandy clay loam?
The USDA maps sandy clay loam beneath much of Pecan Plantation, with loamy fine sand also common near streets like Ravenswood Road. We match fluid, reaming and tracking to the changing ground along each planned route.
- Bastrop loamy fine sand is mapped across 31 percent of Pecan Plantation, so we use staged reaming and drilling fluid to help hold loose ground open.
- With sandy clay loam mapped at about 40 inches across 41 percent, we watch the returns and adjust fluid so the hole stays controlled beneath Ravenswood Road.
- Where a route nears the Brazos River, we plan the bore depth around the channel and check jurisdiction before setting the crossing plan.
- Along Westover Drive, we expose marked utilities with hydrovac before drilling near them, then track the head from the surface and log depth and pitch.

Where does a line have to go under the Brazos River in Pecan Plantation?
No highways are mapped inside the Pecan Plantation community boundary or within 1.5 miles outside it. Ravenswood Road is the longest named street, with Bellechase Road and Westover Drive also among the longer routes. A bore beneath these streets can place a line without trenching along the full pavement, but the entry and exit pits still need workable access. If a proposed route reaches a highway beyond the mapped area, its road authority and right of way become part of the plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Brazos River | Stream | 1.48 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Wilson Creek | Stream | 0.04 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cedar Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Fall Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Rocky Branch | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Taylor Branch | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Pecan Plantation or within 1 mile outside it, and none of the mapped street and rail crossings fall inside the community. The Brazos River runs through the area for 1.48 channel miles, and Wilson Creek for 0.04 mile; mapped street crossings of named streams are absent. Cedar Creek and Fall Creek touch or run along the boundary. A crossing plan near the Brazos River or either boundary creek needs to account for the channel and its banks.
Whose permission does a Pecan Plantation bore in Hood County need?
Pecan Plantation has no city government, so streets and permits fall to Hood County or the state, depending on the route. No highway is mapped inside the community or within 1.5 miles, but work on a state, US, farm to market or ranch to market road right of way needs a TxDOT utility permit. The utility owner files through RULIS for review by the TxDOT Fort Worth District; we prepare the bore plan and profile and work under that owner’s permit. A route near the Brazos River or Wilson Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning. No railroad is mapped near the community.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Pecan Plantation, Hood County?
EPA drinking water records do not tie a water system to Pecan Plantation, so the water provider for a specific address must be confirmed with Hood County or the local water district before a bore is planned. Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative Service report electric service in Hood County. That does not establish the provider at every Ravenswood Road address, so we confirm the line owner before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Hood County and Johnson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates put Pecan Plantation’s median housing year at 1998: 1 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 43 percent in 2000 or later. That mix can mean either replacement lines or new services near Bellechase Road; the age of a particular buried line still needs checking. Before the drill approaches a marked utility, we hydrovac pothole it to expose its depth, since paint shows position, not depth.

Where is Pecan Plantation in relation to Granbury?
Pecan Plantation spans 7.42 square miles, mostly in Hood County, with 6 percent in Johnson County, and sits at 720 feet elevation. ZIP code 76049 covers the community. DeCordova is 5.1 miles northwest, Canyon Creek is 5.3 miles west, and Granbury is 8.5 miles northwest. Granbury is both the nearest larger city and the Hood County seat. The Yukon main office is 254 road miles away, a 5.2 hour drive, so mobilization is part of planning work on Ravenswood Road and other local routes.
Places near Pecan Plantation
- Directional boring in DeCordova: 5.1 miles northwest
- Directional boring in Canyon Creek: 5.3 miles west
- Directional boring in Granbury: 8.5 miles northwest
- Directional boring in Godley: 9.6 miles northeast
- Directional boring in Glen Rose: 9.8 miles southwest
Which jobs call for a bore near Ravenswood Road in Pecan Plantation?
- Water or sewer service: A replacement or new service along Westover Drive can pass beneath pavement instead of requiring a full length street trench.
- Electric conduit: Near Ravenswood Road, we confirm the line owner and expose marked utilities before planning a conduit route.
- Fiber route: A fiber bore along Bellechase Road can use entry and exit pits while keeping the street surface uncut.
- Creek crossing: A planned bore under the Brazos River needs a route and depth plan that accounts for the channel and jurisdiction review.
- Drainage crossing: Near Wilson Creek, the bore path and pits need to account for the mapped channel and local ground conditions.
- Airport utility: A service route near Pecan Plantation Airport can be planned around the proposed line, size and available access.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Pecan Plantation bore near Wedgefield Road?
A map pin matters first: the exact spot on Wedgefield Road or near the Brazos River affects the route, access and crossings we need to plan. For a crossing on Bellechase Road, send us the address or pin, planned installation, pipe or conduit size, and footage. A sketch or plans can help us understand the route before we price the work.
The mapped sand and sandy clay loam make ground conditions the first pricing question on a Pecan Plantation bore. Route length, pipe or conduit size, and the number of utilities to expose also shape the work. A Brazos River or drainage crossing, pavement, and the space available for pits can add planning and equipment needs. Mobilization matters too: the Yukon main office is 254 road miles away. High profile or emergency work can also change what the job requires.
Questions people ask about boring in Pecan Plantation
Does Trinity take directional boring jobs in Pecan Plantation, Hood County?
Yes. We take directional boring work in Pecan Plantation and staff it with our crews or with crews from partner contractors we have vetted. The customer works with Trinity from the first call through the bore log, including when a partner crew is on site. Routes near Ravenswood Road are planned for the specific address and ground.
Who controls Westover Drive in Pecan Plantation, and can a bore avoid cutting it?
Pecan Plantation is unincorporated, so there is no city government; street and permit authority rests with the county or state, depending on the route. A directional bore can pass beneath Westover Drive without trenching across its full surface. Entry and exit pits still need room, and the route has to be planned for existing utilities.
How old are homes and buried lines near Bellechase Road in Pecan Plantation?
The American Community Survey 2019 to 2023 estimates give Pecan Plantation a median housing year of 1998. Those records describe homes, not the installation date of a particular buried line near Bellechase Road. Replacement bores may follow older utilities, while newer homes can need service extensions; we expose marked lines before drilling close to them.
What ground does a bore pass through in Pecan Plantation, including Bastrop soil?
The USDA soil survey maps Bastrop soil across 39 percent of Pecan Plantation and sandy clay loam at about 40 inches across 41 percent. Loamy fine sand is common at the surface. Sand can cave behind the drill, while clay can cling to the reamer, so we adjust fluid and reaming to the route.
How much bedrock is mapped within five feet in Pecan Plantation?
Bedrock is mapped within 60 inches across 8 percent of Pecan Plantation; hard bedrock accounts for 7 percent and weathered bedrock 1 percent. The survey also maps bedrock on 7 percent at about 40 inches. We treat Yahola soil patterns as mapped information, not a site specific reading for an individual bore along Ravenswood Road.
Can a line be bored under the Brazos River in Pecan Plantation?
A bore can be planned under the Brazos River, which has 1.48 channel miles in Pecan Plantation, but the route needs site specific review. Near the Brazos River, we check during planning whether a crossing falls under US Army Corps of Engineers jurisdiction. Channel depth, banks and access affect the bore plan and where entry and exit pits can go.
How far is Pecan Plantation from Yukon by way of Granbury, and does it affect the job?
Pecan Plantation is 254 road miles and a 5.2 hour drive from our Yukon main office. Granbury, the Hood County seat and nearest larger city, is 8.5 miles northwest of the community. The distance from Yukon makes mobilization part of the job plan, alongside the route, ground and crossings.
How early should I call Texas811 for a bore on Ravenswood Road in Pecan Plantation?
For a Ravenswood Road bore, Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If our Hood County start moves more than 14 days past the original notice, we submit a new request. On Wedgefield Road, we refresh marks through Texas811 if they wear off or move before work continues.
What affects the cost of a Pecan Plantation bore under the Brazos River?
Ground and crossing conditions matter first: the Brazos River route, sandy clay loam and loose surface soils can affect the plan and drilling time. Length, pipe or conduit size, marked utilities to expose, pavement, drainage crossings and pit work also affect price. Mobilization from the Yukon office is another job factor for Pecan Plantation.
Where the Pecan Plantation facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Pecan Plantation
- U.S. Census Bureau, TIGER/Line 2024: Pecan Plantation boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Pecan Plantation population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Pecan Plantation housing units and year built
- Macrostrat geologic map compilation: map units under Pecan Plantation
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hood County and Johnson County
- U.S. Geological Survey, Elevation Point Query Service: Pecan Plantation elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Pecan Plantation
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Pecan Plantation
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Pecan Plantation, Texas
Type the address of your job in Pecan Plantation. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Pecan Plantation
County: Johnson County directional boring. Same county: Oak Trail Shores · Tolar · Cresson · Lipan · Stockton Bend · Burleson · Cleburne · Joshua · Venus · Alvarado · Keene · Mansfield. All counties: Texas county list.
