trinityboringsolutions.com

Ferris Texas Directional Boring: Houston Black Soil, Ten Mile Creek, Union Pacific

Quick Answer: We do directional boring, also called horizontal directional drilling (HDD), in Ferris for routes crossing streets such as FM 983. Ferris is 240 road miles from our Yukon office, so mobilization is part of planning a job near Ten Mile Creek, staffed by our crews and vetted drilling partners. Houston Black soil and clay cover much of the city, so sticky cuttings and fluid returns need attention. A bore can pass beneath pavement and creek banks without cutting the surface.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Ferris bores at a glance

  • Incorporated city in Ellis County and Dallas County, Texas. Population 4,200 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 240 miles, about 4.8 hours of driving.
  • Ground: Houston Black soil is mapped on 49 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 11 percent of the area.
  • Highways inside the boundary: Interstate 45, Interstate 45 Business, FM 664 and FM 660. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: Union Pacific, with 10 mapped street and rail crossings.
  • Named streams inside the boundary: Ten Mile Creek and Long Branch.
  • Public water: City of Ferris, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near FM 983 in Ferris?

Ferris is 240 road miles from our Yukon office, and our crews or vetted partner drilling contractors can staff a job along FM 983. The Census Bureau Vintage 2024 estimate puts Ferris at 4,200 people across Ellis County and Dallas County. We install water, sewer, gas, electric conduit and fiber, routing lines beneath local streets or around crossings such as Ten Mile Creek.

Our main office is in Yukon, Oklahoma, and Ferris work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet under the Arkansas River in Tulsa. A Ferris route near FM 983 can involve anything from a 3/4 inch service line to 48 inch casing, depending on the line and crossing. Our family business began in 1965, and we have done directional boring since 1982, bringing that experience to Ferris projects.

Trinity Boring Solutions Ditch Witch JT922 HDD rig and vacuum excavation truck on a commercial bore in Oklahoma City
Our Ditch Witch JT922 drill and vacuum excavation truck on a commercial bore in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What should we plan for when directional boring through Houston Black soil in Ferris?

The USDA soil survey maps Houston Black soil across 49 percent of Ferris, Heiden across 32 percent and Ferris soil across 11 percent. Houston Black clay with 1 to 3 percent slopes is mapped under 48 percent of the city area. At the surface, 95 percent is mapped as clay; at about 40 inches, clay is also mapped across 95 percent. The soil at that depth averages 52 percent clay, and 97 percent is mapped as heavy clay. These are mapped soil conditions, not results from test borings. Sticky clay can ball up on a reamer and grip the pipe, so the drilling fluid and reaming sequence matter.

USDA soil survey, inside the Ferris city limitsWhat is mapped
Soil series mappedHouston Black 49 percent, Heiden 32 percent and Ferris 11 percent
Texture at the surfaceclay 95 percent and variable 3 percent
Texture about 40 inches downclay 95 percent and variable 3 percent
Engineering class about 40 inches downfat clay (CH) 97 percent
Average clay content about 40 inches down52 percent
Bedrock mapped within 60 inches11 percent of the area (0 percent hard rock, 11 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel96 percent of the area

At about 40 inches, 97 percent of Ferris is mapped as CH soil. The USDA soil survey places weathered bedrock within 60 inches in 11 percent of the area, with typical bedrock depth at 41 inches, so a route may need to account for slower drilling near rock. Seasonal water tables are not mapped, while flood prone soils cover 3 percent. The Ozan Formation, a Late Cretaceous unit, is mapped here. High steel corrosion risk covers 96 percent, so the line owner should consider materials for steel casing and tracer wire; HDPE does not share that soil corrosion concern.

What does it take to bore clay in Ferris?

Ferris soil maps point to a clay focused drilling plan, especially around Houston Black soil. We adjust the fluid, ream in stages and keep an eye on returns so pressure does not lift pavement along FM 983.

  1. Fluid plan: Houston Black soil is heavy clay, so we use a fluid mix suited to sticky cuttings and manage returns to avoid lifting pavement.
  2. Staged reaming: Ferris clay can cling to the reamer and tighten around pipe, so we enlarge the bore in steps and prepare pipe for the pull.
  3. Utility exposure: Near the City of Ferris water system or electric lines reported in Ellis County, we hydrovac marked lines before the drill approaches them.
  4. Path tracking: For routes near FM 983 or Ten Mile Creek, we track the drill head from the surface and record depth and pitch as it advances.
Reel of 4 inch HDPE conduit on the exit side of a 385 foot directional bore under creeks and wetland in Guthrie, Oklahoma
A reel of 4 inch HDPE conduit on the exit side of a 385 foot bore under creeks and wetland in Guthrie, Oklahoma.

Which roads, tracks or creeks might a Ferris bore cross near Ten Mile Creek?

Interstate 45 has 3.7 mapped roadway miles inside Ferris, and Interstate 45 Business has 1.8. FM 664 and FM 660 add 2.7 and 2.0 roadway miles inside the city. The longest named streets include FM 983 at 2.02 miles, Central Street at 1.83 miles and Main Street at 1.47 miles. A bore can route beneath pavement rather than cut across it, with its alignment planned for the road and nearby buried lines.

CrossingTypeMapped extentWho has a say
Interstate 45Interstate3.7 roadway miles insideState highway office
Interstate 45 BusinessInterstate1.8 roadway miles insideState highway office
FM 664State highway2.7 roadway miles insideState highway office
FM 660State highway2 roadway miles insideState highway office
Union PacificRailroad3.07 track miles insideThe railroad
Ten Mile CreekStream1.15 channel miles insideChecked for Corps of Engineers jurisdiction
Long BranchStream1.07 channel miles insideChecked for Corps of Engineers jurisdiction
Bear CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Heath LakeLake or pond27 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 3.07 track miles inside Ferris on its Ennis Subdivision, and public mapping shows 10 street and rail crossings in the city. A rail route needs the railroad’s crossing agreement, which sets the site conditions. Ten Mile Creek runs 1.15 channel miles within Ferris, and Long Branch runs 1.07; two mapped street crossings cross named streams. Heath Lake is within one mile but outside city limits. Creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who has to sign off on a Ferris bore in Ellis County?

Interstate 45, Interstate 45 Business, FM 664 and FM 660 are state roads, so work in their right of way needs a TxDOT utility permit. For Ferris crossings, the TxDOT Dallas District reviews it before we plan the underground route. The utility owner files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. Ferris is incorporated, so its city streets, including FM 983 and Central Street, belong to the city. A Union Pacific track crossing needs an agreement with the railroad, and a Ten Mile Creek crossing is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Ferris water system?

The City of Ferris public water system uses purchased surface water and reports 1,678 service connections serving 4,204 people. Electric service reporting in Ellis County includes Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near the water system or along FM 983.

Line ownerWhat it isSourceSize
City of FerrisPublic water systemSurface water bought from another system1,678 connections, 4,204 people served
Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative ServiceElectric utilities reporting service in Ellis County and Dallas CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use community context when planning underground work in Ferris: the American Community Survey 2019 to 2023 five year estimates put its median housing year at 1983. The survey estimates 27 percent of housing was built before 1960, 37 percent from 1960 to 1999 and 36 percent in 2000 or later. A replacement route near Central Street may need to avoid older buried services, while a newer service on FM 983 still needs a clear path. We hydrovac expose marked utilities on the bore route before drilling near them; paint shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Ferris and nearby Wilmer?

Ferris covers 4.65 square miles at an elevation of 466 feet and lies in Ellis County and Dallas County. For Ferris underground work, we use ZIP codes 75125 and 75146 to clarify the service location. Wilmer is 4.3 miles north, Bear Creek Ranch is 5.4 miles west and Red Oak is 6.6 miles west; Lancaster is 7.0 miles northwest. Red Oak is the nearest larger city, while Waxahachie, the Ellis County seat, is 13.5 miles southwest. Ferris is 240 road miles and a 4.8 hour drive from our Yukon yard, which figures into mobilization planning.

Places near Ferris

What boring work comes up near Main Street in Ferris?

  • Highway crossing: An Interstate 45 bore needs a route below the roadway, with the line owner’s TxDOT permit covering work in the right of way.
  • Street service: A water or sewer line along Central Street can pass below pavement, leaving the street surface uncut.
  • Fiber route: A fiber conduit near Main Street can follow a planned path around marked utilities and connect to its intended service point.
  • Creek crossing: A Ten Mile Creek bore needs a planned path under the channel, with federal waterway jurisdiction checked during planning.
  • Rail crossing: A bore beneath Union Pacific track needs the railroad’s agreement and a route planned around its crossing conditions.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Ferris bore near Union Pacific?

Start with a map pin or address, because a route beside Main Street differs from one near Ten Mile Creek or the Union Pacific track. Before we plan your Ferris bore, tell us what will go underground, the pipe or conduit size, and the footage. A sketch or plans help us see the entry and exit points, crossings and access before we set the scope.

A short route with room for pits and no pavement, creek or rail crossing is simpler to plan than a constrained route beside Ten Mile Creek or Union Pacific. Price reflects bore length, pipe size, Houston Black clay, utilities to expose, pavement, crossing conditions, pits, excavator time and sand backfill. A crossing under Interstate 45 adds planning around the state right of way. Mobilization also reflects the 240 road miles from Yukon, and emergency or high profile work can change the scope.

Questions people ask about boring in Ferris

Does Trinity Boring Solutions take directional boring jobs in Ferris and Ellis County?

Yes. We take directional boring work in Ferris and across Texas, with our own crews and vetted partner drilling contractors available to staff the job. Ferris is 240 road miles from our Yukon office, so that distance is part of planning work near FM 983 or Ten Mile Creek.

Who owns electric lines in Ellis County near Ferris, and who confirms conduit specs?

The owner depends on the Ferris address. Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service report electric service in Ellis County. We confirm the line owner before planning a conduit route, then confirm the conduit requirements with that owner for the specific work near FM 983 or another route.

Does Ferris control Main Street, and can a bore avoid cutting it?

Ferris is incorporated, so Main Street is a city street. Directional boring can route a line beneath its pavement rather than open cutting across the street. The entry and exit pits and the route still need to fit the site, including any marked utilities near Main Street.

How do housing age and buried lines near Ferris Central Street affect replacement bores?

Ferris housing has a median year built of 1983 in the American Community Survey 2019 to 2023 five year estimates. Older services near Central Street may need careful locating on a replacement route, while newer construction can still have buried lines to avoid. We expose marked utilities along the path before drilling near them.

Does Houston Black soil in Ferris corrode steel, and what pipe is used?

The USDA soil survey maps high steel corrosion risk across 96 percent of Ferris, including areas mapped as Houston Black soil. The line owner selects suitable materials or coatings for steel casing and tracer wire. HDPE is not subject to the mapped soil corrosion concern, but the pipe choice depends on the line design.

What ground does a bore pass through in Ferris Houston Black soil?

Houston Black is mapped across 49 percent of Ferris, and clay covers 95 percent of the mapped surface texture and at about 40 inches. At that depth, the soil averages 52 percent clay and 97 percent is mapped as CH. That heavy clay can cling to the reamer and pipe, so we plan fluid and staged reaming for the route.

How far is Ferris from the Yukon office, and does nearby Red Oak affect the job?

Ferris is 240 road miles and a 4.8 hour drive from our Yukon yard. Red Oak is 6.6 miles west and is the nearest larger city, but the job route and access in Ferris determine the work plan. Mobilization from Yukon is considered alongside the ground and crossings at the actual site.

How much 811 notice is needed for a Ferris bore along FM 983, and what if marks move?

The Texas811 locate request for a bore along FM 983 must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before continuing.

What affects the cost of a directional bore in Ferris near Interstate 45?

The price depends on the job details, not one single factor. Length, pipe size, Houston Black clay, utilities to expose, pavement, creek or drainage crossings, pits and excavator time all affect the scope. A route near Interstate 45 has state right of way considerations, and mobilization also reflects the 240 road miles from Yukon.

Where the Ferris facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Ferris

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Ferris, Texas

Type the address of your job in Ferris. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Ferris

Same county: Waxahachie · Midlothian · Ennis · Glenn Heights · Ovilla · Palmer · Italy · Oak Leaf · Maypearl · Garrett · Venus · Milford. All counties: Texas county list.