Quick Answer: Garrett’s top five feet are mapped mostly as clay, with weathered bedrock within 60 inches in parts of town. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for Garrett lines crossing Interstate 45. Garrett is 250 road miles from our Yukon, Oklahoma main office, and the Union Pacific tracks add another route constraint. Wilson clay can stick to a reamer and grip pipe, so staged reaming matters along Sleepy Hollow Road.
Garrett bores at a glance
- Incorporated city in Ellis County, Texas. Population 878 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 250 miles, about 4.9 hours of driving.
- Ground: Wilson soil is mapped on 45 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 21 percent of the area.
- Highways inside the boundary: Interstate 45, FM 879 and Spur 469. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Wolf Branch.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near Interstate 45 in Garrett?
What does the ground look like below Garrett’s streets? The USDA soil survey maps clay through about 40 inches, with weathered bedrock mapped within 60 inches in parts of town. Garrett is in Ellis County, where the Census Bureau Vintage 2024 estimate puts the population at 878. We install water, sewer, gas, electric conduit and fiber along routes such as Garrett Avenue and FM 879.
Our main office is in Yukon, Oklahoma, and Garrett work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. We are a family business started in 1965, with directional boring since 1982; that reach also serves jobs along Garrett Avenue.

What is Garrett ground like to bore through Wilson soil?
The USDA soil survey maps Wilson soil across 45 percent of Garrett, with Heiden at 23 percent, Crockett at 21 percent and Houston Black at 7 percent. The mapped surface texture is clay loam across 45 percent and clay across 32 percent. At about 40 inches below the surface, clay is mapped across 100 percent of the town, and the average clay content there is 48 percent. These are mapped soil patterns, not readings from a bore on Garrett Avenue. Heavy clay can ball on a reamer and grip pipe, so the drilling plan needs to account for sticky returns.
| USDA soil survey, inside the Garrett city limits | What is mapped |
|---|---|
| Soil series mapped | Wilson 45 percent, Heiden 23 percent, Crockett 21 percent and Houston Black 7 percent |
| Texture at the surface | clay loam 45 percent, clay 32 percent and loam 21 percent |
| Texture about 40 inches down | clay 100 percent |
| Engineering class about 40 inches down | fat clay (CH) 97 percent |
| Average clay content about 40 inches down | 48 percent |
| Bedrock mapped within 60 inches | 21 percent of the area (0 percent hard rock, 21 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Weathered bedrock is mapped within 60 inches across 21 percent of Garrett; hard bedrock is not mapped within that depth, and bedrock is not mapped within 40 inches. The seasonal water table is not mapped within 60 inches, while flood prone soils cover 1 percent. High steel corrosion risk is mapped across 100 percent, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel concern. The Wolfe City Formation, of Phanerozoic age, includes sandstone, mudstone and claystone, which can mean slower drilling where harder material is encountered.
How do we bore Garrett clay without cutting local streets?
Garrett’s clay can cling to the reamer, so we match fluid and reaming to the ground rather than forcing the hole. For a Garrett bore, we track the drill head from the surface and log depth and pitch.
- Wilson clay makes sticky cuttings, so we use thinner fluid with polymer and open the hole in stages instead of asking one reamer pass to do all the work.
- Because heavy clay covers mapped ground at about 40 inches, we watch fluid returns closely near Garrett pavement to avoid pressure lifting the surface.
- We keep pipe ready for the pull through Garrett clay, which can swell around it; pulling the same day helps limit how long the opened hole sits.
- Near a marked line on East Gibson, we hydrovac pothole before the drill approaches, then use a walkover locator to track depth and pitch.

Where might a Garrett line pass under Union Pacific tracks?
Interstate 45 and FM 879 each run through Garrett, along with Spur 469; Interstate 45 Business is 0.6 miles beyond the town limits. TxDOT rules call for boring or tunneling beneath existing highway pavement, and rural highway bores extend beneath all travel lanes. Garrett Avenue is the longest named street at 1.42 miles, followed by Boyce Drive at 0.79 miles and Sleepy Hollow Road at 0.73 miles. East Gibson runs 0.66 miles in town. These routes help define whether a bore stays on a city street or reaches state right of way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 45 | Interstate | 2.2 roadway miles inside | State highway office |
| FM 879 | State highway | 2.3 roadway miles inside | State highway office |
| Spur 469 | State highway | 0.5 roadway miles inside | State highway office |
| Interstate 45 Business | Highway nearby | 0.6 miles outside | State highway office |
| Union Pacific | Railroad | 2.29 track miles inside | The railroad |
| Wolf Branch | Stream | 0.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Village Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Lake Clark | Lake or pond | 170 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Old Lake | Lake or pond | 29 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.29 track miles inside Garrett, on the Ennis and Midlothian subdivisions, and three mapped street and rail crossings. A rail bore needs an agreement from Union Pacific that sets crossing conditions. Wolf Branch runs 0.1 channel miles in town, but no street crossings of named streams are mapped. Village Creek touches or runs along the boundary, so a route there needs site specific planning. Lake Clark and Old Lake are outside town limits but within one mile.
Do I need a permit for a Garrett bore in Ellis County?
Garrett is incorporated, so its city streets belong to the city itself; no city permit form or fee is assumed here. For work in Interstate 45, FM 879 or Spur 469 right of way, the utility that owns the line files the TxDOT application through RULIS, and the TxDOT Dallas District reviews it. We give the line owner the bore plan and profile and work under its permit. TxDOT cover rules set 60 inches below the lowest crossed grade for electric and communication lines, 60 inches for water and pressurized sewer crossings, and 48 inches for electric or communication lines running along the right of way. A Union Pacific crossing needs the railroad’s agreement; if highway right of way is also involved, TxDOT asks for a copy. Wolf Branch is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines serving Garrett in Ellis County?
EPA drinking water records do not tie a named water system to Garrett, so the provider for a specific address must be confirmed with the city, Ellis County or the local water district before planning a bore. Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service report electric service in Ellis County. We confirm the line owner for the address before planning an electric conduit bore near Garrett Avenue.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Ellis County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Garrett’s median housing year at 1988, context for underground work. It estimates 11 percent of homes were built before 1960, 69 percent from 1960 to 1999 and 20 percent in 2000 or later. That mix can mean replacement work as well as new services along streets such as East Gibson. Before drilling near any marked utility, we hydrovac pothole it; paint shows position, not depth.

Where is Garrett in relation to Ennis?
Garrett is an incorporated town in Ellis County, at an elevation of 545 feet and covering 1.78 square miles. We use Garrett’s ZIP codes, 75119 and 75152, to confirm the service location before planning underground work. Ennis is 3.6 miles south and Palmer is 3.6 miles north; Bristol is 7.0 miles northeast. Waxahachie, the county seat, is 11.4 miles west, while Ennis is the nearest larger city. From our Yukon, Oklahoma yard, Garrett is 250 road miles away, a 4.9 hour drive. That distance is part of planning mobilization for a bore near Interstate 45.
Places near Garrett
- Directional boring in Ennis: 3.6 miles south
- Directional boring in Palmer: 3.6 miles north
- Directional boring in Bristol: 7 miles northeast
- Directional boring in Bardwell: 7.8 miles south
- Directional boring in Alma: 9.3 miles southeast
What boring work comes up along Garrett Avenue?
- Highway crossing: A bore beneath Interstate 45 needs a route and profile that fit TxDOT right of way and travel lane requirements.
- Water service: A service route near Garrett Avenue starts with confirming the address’s water provider before the bore is planned.
- Fiber conduit: A conduit run along East Gibson needs the line owner identified and marked utilities exposed before drilling nearby.
- Rail crossing: A route beneath Union Pacific track needs the railroad agreement and its crossing conditions built into the bore plan.
- Creek crossing: A bore near Wolf Branch needs depth planning beneath the channel and a check for federal waterway jurisdiction.
- Street bore: A route under Sleepy Hollow Road can avoid cutting pavement, with marked utilities pothole exposed before the drill gets near them.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Garrett quote near East Gibson?
Send a map pin at the exact spot on East Gibson or another Garrett route; the location shows whether the bore approaches Interstate 45, Union Pacific track or a drainage feature. In a Garrett boring plan, we specify what goes in the ground, pipe or conduit size, and footage. A sketch or plans help us review the route and access.
For Garrett, heavy clay and the number of utilities to expose can shape the work before length does, especially along a built street such as Garrett Avenue. Pipe size, pavement, pits, excavator time and sand backfill also matter. A bore near Interstate 45 or Union Pacific track may need added crossing work, while creek or drainage crossings change the plan. The 250 road miles from Yukon affect mobilization, and high profile or emergency work can add requirements.
Questions people ask about boring in Garrett
Does Trinity take directional boring work in Garrett and Ellis County?
Yes. We take directional boring work across Texas, including Garrett in Ellis County. Our main office is in Yukon, Oklahoma, and we use our own crews or vetted drilling partners for Garrett work. You deal with Trinity from the first call through the bore log, whether the route is near FM 879 or another local road.
What ground should I expect on a Garrett bore through Wilson soil?
The USDA soil survey maps Wilson soil across 45 percent of Garrett, and clay across 100 percent at about 40 inches below the surface. That heavy clay can stick to a reamer and grip the pipe. A bore near Garrett Avenue needs a plan for staged reaming and fluid returns.
Is rock mapped within five feet of the ground in Garrett?
Weathered bedrock is mapped within 60 inches across 21 percent of Garrett, but hard bedrock is not mapped within that depth. Bedrock is not mapped within 40 inches. Near Interstate 45, we treat soil survey patterns as screening context, and a Garrett route may still need site specific review.
Who approves a Garrett bore under Interstate 45?
The utility owner files for work in Interstate 45 right of way through TxDOT’s RULIS system, and the TxDOT Dallas District reviews the application. We provide the bore plan and profile for the owner’s filing. A route that also uses Garrett city streets involves the city street system as well.
What does a Garrett bore under Union Pacific track require for clearance and permitting?
A bore under Union Pacific track requires an agreement with the railroad that owns it. That agreement sets crossing details such as casing, depth and flagging. Garrett has 2.29 track miles inside town, so the exact route and the Ennis or Midlothian subdivision location matter to the crossing plan.
Can a line be bored under Wolf Branch in Garrett?
A bore under Wolf Branch can be planned, but the route and channel depth need review. The stream runs 0.1 channel miles inside Garrett, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. The mapped street crossings of named streams in town do not include Wolf Branch.
Can I call Trinity after hours about an urgent bore on Sleepy Hollow Road in Garrett?
Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423, including for an urgent request near Sleepy Hollow Road. For a bore there, have the location and what the line must cross ready to describe so we can discuss the scope.
How much 811 notice is needed for a Garrett Avenue bore in Garrett?
Texas law requires a locate request through Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. Describe the bore path along Garrett Avenue. If the start slips more than 14 days past the original notice, make a new request; have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a Garrett directional bore near Interstate 45?
The route’s clay, bore length and pipe or conduit size affect the work, as do utilities to expose, pavement, pits, excavation and backfill. A crossing at Interstate 45 or Union Pacific track can add planning needs. Creek or drainage crossings and the 250 road miles from Yukon also shape the job and mobilization.
Where the Garrett facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Garrett
- U.S. Census Bureau, TIGER/Line 2024: Garrett boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Garrett
- U.S. Census Bureau, American Community Survey 2019 to 2023: Garrett housing units and year built
- Macrostrat geologic map compilation: map units under Garrett
- U.S. Department of Transportation, North American Rail Network: track owners in Ellis County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Ellis County
- U.S. Geological Survey, Elevation Point Query Service: Garrett elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Garrett
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Garrett
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Garrett, Texas
Type the address of your job in Garrett. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Garrett
Same county: Waxahachie · Midlothian · Red Oak · Glenn Heights · Ovilla · Ferris · Italy · Oak Leaf · Maypearl · Venus · Milford · Pecan Hill. All counties: Texas county list.