trinityboringsolutions.com

Grand Saline Texas Directional Boring: Woodtell Loam, US 80 and Union Pacific

Quick Answer: Woodtell soil is common in Grand Saline, and its sticky clay can cling to a reamer. We take directional boring and horizontal directional drilling (HDD) work in Texas, including bores beneath Grand Saline streets and US 80. The Yukon, Oklahoma main office is 288 road miles from Grand Saline, near the Union Pacific track. The USDA soil survey maps clay loam at 40 inches across much of the city, so staged reaming and attention to fluid returns matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Grand Saline bores at a glance

  • Incorporated city in Van Zandt County, Texas. Population 3,292 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 288 miles, about 5.7 hours of driving.
  • Ground: Woodtell soil is mapped on 57 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 80, FM 17, Texas State Highway 110 and FM 857. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: Union Pacific, with 6 mapped street and rail crossings.
  • Public water: City of Grand Saline, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Grand Saline Creek?

Trinity Boring Solutions takes directional boring work in Grand Saline, Van Zandt County, where the Census Bureau Vintage 2024 estimate puts the population at 3,292. Woodtell soil is the main mapped soil series. We install water, sewer, gas, electric conduit and fiber lines along routes that can include Frank Street, US 80 or a crossing near Grand Saline Creek.

Our main office is in Yukon, Oklahoma, and Grand Saline work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982, applying that experience to Grand Saline planning. Our record of no utility strikes in over 25 years matters around the City of Grand Saline water lines and the other buried services near US 80.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

How does Woodtell soil affect a bore in Grand Saline?

Woodtell soil is the leading mapped soil series in Grand Saline, covering 57 percent of the city, according to the USDA soil survey. At 40 inches, clay loam is mapped across 57 percent of the area, and heavy clay is mapped across 68 percent. For Grand Saline bore planning, we use mapped soil patterns as context, not as test borings. Clay can hold an open bore but may stick to the reamer and grip the pipe. Staged reaming and a thinner fluid mix help manage that behavior.

USDA soil survey, inside the Grand Saline city limitsWhat is mapped
Soil series mappedWoodtell 57 percent, Nahatche 11 percent, Freestone 11 percent, Bernaldo 11 percent and Wolfpen 8 percent
Texture at the surfaceloam 68 percent, fine sandy loam 21 percent and loamy fine sand 8 percent
Texture about 40 inches downclay loam 57 percent, sandy clay loam 19 percent and stratified loam to silty clay loam 11 percent
Engineering class about 40 inches downfat clay (CH) 68 percent, clayey sand (SC) 19 percent and lean clay (CL) 11 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches32 percent of the area
Flood prone soils11 percent of the area
High corrosion risk for uncoated steel79 percent of the area

Across Grand Saline, we do not see mapped bedrock in the top five feet, but deeper rock remains possible. Seasonal water tables are mapped within 60 inches across 32 percent of the area, so pits may need pumping. Flood prone soils are mapped across 11 percent. High steel corrosion risk covers 79 percent, a consideration for casing and tracer wire. The mapped Wilcox Group, undivided, is Paleogene and includes mudstone, sand and lignite; ground conditions can vary along a bore.

How do we drill Grand Saline clay loam?

In Grand Saline, clay loam at 40 inches calls for controlled fluid and staged reaming. Woodtell soil is common, so we plan the bore around sticky ground and the route’s marked utilities.

  1. Woodtell soil can stick to the reamer, so we use a thinner fluid mix and open the Grand Saline bore in stages.
  2. With heavy clay mapped across 68 percent of Grand Saline, we watch fluid returns closely to reduce the chance of lifting pavement.
  3. Seasonal water tables mapped within 60 inches across 32 percent of the city can fill pits, so we plan smaller pits and pumping where needed.
  4. Before a bore near Frank Street, we hydrovac pothole each marked utility on the path, then track and log the drill head’s depth and pitch.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks affect bores in Grand Saline near Frank Street?

Grand Saline bores can cross US 80, FM 17, Texas State Highway 110 or FM 857, all mapped within the city limits. FM 1652 is 0.3 miles outside them. Frank Street is the longest named street at 1.92 miles in the city; Spring Street and High Street are also among the longest. A bore beneath these paved routes can avoid an open cut, with alignment and depth set by the route and applicable permit conditions.

CrossingTypeMapped extentWho has a say
US 80US highway2.4 roadway miles insideState highway office
FM 17State highway0.8 roadway miles insideState highway office
Texas State Highway 110State highway0.5 roadway miles insideState highway office
FM 857State highway0.5 roadway miles insideState highway office
FM 1652Highway nearby0.3 miles outsideState highway office
Union PacificRailroad2.84 track miles insideThe railroad
Grand Saline CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
City LakeLake or pond59 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.84 track miles inside Grand Saline, and six street and rail crossings are mapped in the city. A bore beneath its track requires an agreement with the railroad, which sets crossing conditions such as casing, depth and flagging. No named stream crossing is mapped on city streets. Grand Saline Creek is 0.5 miles outside the limits, and City Lake lies outside the city, so a proposed water crossing needs its own review.

Do I need a permit to bore beneath US 80 in Grand Saline?

For a Grand Saline bore crossing US 80, electric and communication lines need 60 inches of cover below the lowest crossed grade, while water lines need 60 inches and pressurized sewer lines need 60 inches. TxDOT Utility Accommodation Rules also set cover for lines running along the right of way. The utility owner, not our crew, applies through TxDOT’s online RULIS system, and the TxDOT Tyler District reviews it. We prepare the bore plan and profile for the owner’s application.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near the City of Grand Saline water system?

The City of Grand Saline owns the public water system, which draws from groundwater wells and reports 1,387 service connections serving 3,219 people. Electric utilities reporting service in Van Zandt County include Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative. We confirm which company owns the line at the specific Frank Street or US 80 address before planning a conduit bore.

Line ownerWhat it isSourceSize
City of Grand SalinePublic water systemGroundwater wells1,387 connections, 3,219 people served
Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric CooperativeElectric utilities reporting service in Van Zandt CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Grand Saline’s median housing year at 1971; 24 percent of homes were built before 1960, and 8 percent were built in 2000 or later. That mix can mean a route involves replacing older buried pipe or adding a newer service. On a High Street project, we use hydrovac potholing to uncover marked utilities before drilling near them, since locate paint does not show depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Grand Saline from Fruitvale and the Yukon office?

Grand Saline is in Van Zandt County, 12.3 miles northeast of the county seat, Canton, and has an elevation of 425 feet. The incorporated city covers 2.1 square miles and uses ZIP code 75140. Fruitvale is 5.4 miles west; Alba is 8.8 miles northeast; Edgewood is 10.0 miles west; and Van is 11.5 miles south. Lindale, the nearest larger city, is 21.8 miles southeast. The Yukon, Oklahoma main office is 288 road miles away, a 5.7 hour drive, which affects mobilization for Grand Saline work.

Places near Grand Saline

What would we bore near Spring Street in Grand Saline?

  • Highway crossing: A bore beneath US 80 can carry water, sewer or conduit without cutting across the paved route.
  • Street service: A service along Spring Street can be drilled between access pits, with marked utilities exposed before the drill approaches.
  • Rail crossing: A route beneath the Union Pacific track needs railroad coordination for casing, depth and flagging.
  • Creek crossing: A proposed line near Grand Saline Creek needs planning for channel depth and a check for federal jurisdiction.
  • Water connection: A new line near the City of Grand Saline system needs the route and connection point identified before sizing the bore.
  • Electric conduit: Near High Street, we first confirm the electric line owner and expose marked utilities along the planned route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Grand Saline work near Union Pacific?

For a Grand Saline quote, send the job address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. Include any crossing near Union Pacific or US 80, since those routes can change the bore plan and the work needed to reach the line.

The scope sets the price for a Grand Saline bore. Woodtell clay can affect fluid and reaming time; crossings of US 80 or Union Pacific add coordination and access needs. We also consider line size, length, utilities to expose, pavement, drainage, pits and excavator time. The 288 road miles from Yukon affect mobilization, while high profile or emergency work can change the required planning.

Questions people ask about boring in Grand Saline

Does Trinity take directional boring jobs in Grand Saline and Van Zandt County?

Yes. We take work in Grand Saline and across Van Zandt County using our own crews or crews from satellite yards run by partner drilling contractors we have vetted. The customer works with Trinity from the initial call through the bore log, regardless of which crew is on site.

What is needed for a bore beneath Union Pacific track in Grand Saline?

A bore beneath the Union Pacific track in Grand Saline needs an agreement from the railroad that owns it. That agreement establishes crossing details, including casing, depth and flagging. The route has to be planned around the track and any nearby street or utility crossings.

Can a line be bored under Grand Saline Creek near Grand Saline?

A line can be planned beneath Grand Saline Creek, which is 0.5 miles outside the city limits. The crossing plan needs to account for channel depth and be checked for U.S. Army Corps of Engineers jurisdiction. Site conditions and the line’s route determine the bore design.

Who runs the Grand Saline water system, and where does its water come from?

We account for the City of Grand Saline’s public water system, supplied by groundwater wells, when planning underground work. The system reports 1,387 service connections and 3,219 people served. For a bore near the system, the planned connection and existing lines need to be identified.

Which electric company serves my Grand Saline address in Van Zandt County?

The electric line owner depends on the address. Utilities reporting service in Van Zandt County include Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative. We confirm the owner before planning a conduit bore near a Grand Saline street.

Do I have to cut High Street for a Grand Saline bore?

Not necessarily. Directional boring can place a line beneath High Street without cutting the pavement, subject to the route and any required approvals. Because Grand Saline is incorporated, we plan city street bores with the city as the street owner. We expose marked utilities along the bore path before drilling near them.

Does Lindale being near Grand Saline change a job from the Yukon office?

Grand Saline is 288 road miles from Trinity’s Yukon, Oklahoma main office, while Lindale is 21.8 miles southeast of the city. The trip affects mobilization planning. The address, route and work scope determine how that distance fits into the job.

How early should I request utility marks for a Grand Saline bore near Frank Street?

For a Grand Saline bore near Frank Street, request marks at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days after the original notice, make a new request. When marks wear or shift in Grand Saline, we refresh them through Texas811 before resuming boring work.

What affects a directional bore beneath US 80 in Grand Saline?

The US 80 route, bore length and line size all affect the price in Grand Saline. Woodtell clay, pavement, utilities to expose, pits, drainage crossings and excavator time can also change the scope. Union Pacific crossings and the 288 road miles from Yukon affect coordination and mobilization.

Where the Grand Saline facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Grand Saline

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Grand Saline, Texas

Type the address of your job in Grand Saline. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Grand Saline

Same county: Wills Point · Callender Lake · Myrtle Springs · Edom · Ben Wheeler. All counties: Texas county list.