Wills Point Texas Directional Boring: Crockett Loam, US 80 and Wills Creek
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), in Wills Point for routes beneath US 80 without opening its pavement. From the Yukon yard, the drive is 271 road miles, and we staff Wills Point jobs with our own crews or vetted partner contractor satellite yards. Crockett soil covers 87 percent of the mapped area, and the clay beneath can grip a pipe, so we plan reaming and pipe pull carefully. A route near Wills Creek also calls for checking the channel crossing during planning.
Wills Point bores at a glance
- Incorporated city in Van Zandt County, Texas. Population 4,050 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 271 miles, about 5.3 hours of driving.
- Ground: Crockett soil is mapped on 87 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 87 percent of the area.
- Highways inside the boundary: US 80, FM 751, FM 2965 and Texas State Highway 64. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Named streams inside the boundary: Wills Creek and Sycamore Branch.
- Public water: City of Wills Point, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Wills Point, Van Zandt County?
Trinity Boring Solutions takes directional boring work in Wills Point, Van Zandt County, for routes beneath US 80 or streets such as South Commerce Street. The Yukon yard is 271 road miles away, and our crews can route water, sewer, gas, electric conduit or fiber beneath Goodnight Boulevard and other local streets. The Census Bureau Vintage 2024 estimate puts Wills Point at 4,050 people.
Our main office is in Yukon, Oklahoma, and Wills Point work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have drilled directionally since 1982. The range from 3/4 inch service lines to 48 inch casing can fit a small connection along 4th Street or a larger crossing at US 80.

What is Crockett soil like to bore in Wills Point?
The USDA soil survey maps Crockett soil across 87 percent of Wills Point, so a bore route may spend much of its length in this loam series. Crockett loam, 1 to 3 percent slopes, covers 66 percent of the mapped area. At the surface, loam is mapped across 89 percent. At about 40 inches, clay is the mapped texture across 96 percent, with average clay content of 43 percent. Heavy clay is mapped at that depth across 98 percent of the area, while sandy ground is not mapped there. We treat Wills Point mapped soil patterns as planning information, not test borings.
| USDA soil survey, inside the Wills Point city limits | What is mapped |
|---|---|
| Soil series mapped | Crockett 87 percent and Wilson 7 percent |
| Texture at the surface | loam 89 percent, silt loam 7 percent and clay loam 3 percent |
| Texture about 40 inches down | clay 96 percent |
| Engineering class about 40 inches down | fat clay (CH) 77 percent and lean clay (CL) 23 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 87 percent of the area (0 percent hard rock, 87 percent weathered rock) |
| Seasonal water table within 60 inches | 9 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 87 percent of Wills Point, with a typical depth of 53 inches; bedrock is not mapped within 40 inches. The Wilcox Group, undivided, is mapped here and dates to the Paleogene, with mudstone, sandstone, conglomerate and lignite. Seasonal water tables are mapped within 60 inches across 9 percent, and flood prone soils across 2 percent. High steel corrosion risk covers 100 percent of the mapped area, so the line owner should consider casing and tracer wire materials; HDPE is not subject to that soil corrosion concern.
How do crews bore through clay in Wills Point?
In Wills Point, we adjust the bore for Crockett clay, which can cling to a reamer and grip pipe. Along streets such as Goodnight Boulevard, we also watch fluid returns to avoid lifting pavement.
- Crockett clay can ball onto a reamer, so we use thinner drilling fluid with polymer and open the hole in stages before pulling pipe.
- Because heavy clay is mapped across 98 percent of Wills Point at about 40 inches, we watch returns and keep fluid pressure low near pavement.
- At a US 80 or Goodnight Boulevard crossing, we pothole each marked utility on the path before drilling close to it; paint does not show depth.
- For a Wills Creek route, we plan beneath the channel, check the crossing for federal jurisdiction, and keep pits in dirt on each side.

What might a bore cross near US 80 in Wills Point?
A Wills Point route may need to pass beneath US 80, which has 5.8 mapped roadway miles inside city limits, or one of the local streets that connect to it. Goodnight Boulevard is the longest named street at 3.52 miles, followed by South Commerce Street at 2.22 miles and 4th Street at 1.78 miles. FM 751, FM 2965 and Texas State Highway 64 also run inside the limits. Boring below existing highway pavement keeps the travel surface intact, while the route and right of way determine the permit path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 80 | US highway | 5.8 roadway miles inside | State highway office |
| FM 751 | State highway | 0.7 roadway miles inside | State highway office |
| FM 2965 | State highway | 0.6 roadway miles inside | State highway office |
| Texas State Highway 64 | State highway | 0.5 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.23 track miles inside | The railroad |
| Wills Creek | Stream | 0.18 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sycamore Branch | Stream | 0.13 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Blackberry Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Magby Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Little Allen Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Willow Lake | Lake or pond | 58 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Wills Point Reservoir | Lake or pond | 38 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Fin and Feathers Club Lake | Lake or pond | 18 acres, nearby | Checked for Corps of Engineers jurisdiction |
The Union Pacific Mineola Subdivision runs 2.23 track miles through Wills Point, and public mapping shows 4 street and rail crossings in the city. A crossing of Union Pacific track needs an agreement with the railroad that sets the crossing conditions. Wills Creek runs 0.18 channel miles inside the limits, and Sycamore Branch runs 0.13; public mapping shows 3 street crossings of named streams. Willow Lake and Wills Point Reservoir are among the nearby water features, so a water crossing is checked for federal jurisdiction during planning.
Who approves a bore near Union Pacific tracks in Wills Point?
For a Wills Point bore on US 80 or another state highway right of way, the line owner files the utility permit through TxDOT’s online RULIS system; the TxDOT Tyler District reviews it. We provide the bore plan and profile for that filing and work under the permit issued to the utility owner. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, while water crossings need 60 inches and pressurized sewer crossings need 60 inches. A Union Pacific track crossing needs the railroad’s agreement. A route under Wills Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near the City of Wills Point system?
The City of Wills Point public water system uses surface water and reports 2,427 service connections serving 7,281 people. A connection near South Commerce Street may tie into that system, but the address and line owner still guide the bore plan. Electric utilities reporting service in Van Zandt County include Oncor Electric Delivery Company, Southwestern Electric Power, Texas New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative. We confirm the line owner for a specific address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Wills Point | Public water system | Surface water | 2,427 connections, 7,281 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Van Zandt County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Wills Point’s median housing year at 1975; 31 percent of homes were built before 1960, and 6 percent in 2000 or later. Along 4th Street, that age range makes a replacement bore different from a new service route because older buried lines may be present. We expose marked utilities with hydrovac potholing before drilling near them, since locate marks show position but not depth.

Where do we take boring work around Wills Point and Edgewood?
Wills Point is in Van Zandt County, where Canton is the county seat, and the city sits at 530 feet elevation across 3.67 square miles. ZIP code 75169 serves the area. Edgewood is 7.3 miles east, Myrtle Springs is 7.1 miles southeast, and Elmo is 8.8 miles west. Terrell, the nearest larger city, is 17.1 miles west; Canton is 13.5 miles southeast. The Yukon yard is 271 road miles away, a 5.3 hour drive, so distance is part of planning mobilization for a bore near US 80.
Places near Wills Point
- Directional boring in Myrtle Springs: 7.1 miles southeast
- Directional boring in Edgewood: 7.3 miles east
- Directional boring in Elmo: 8.8 miles west
- Directional boring in Fruitvale: 11.8 miles east
- Directional boring in Hawk Cove: 12.9 miles north
- Directional boring in Terrell: 17.1 miles west
What boring work comes up near Wills Creek in Wills Point?
- Highway crossing: A bore beneath US 80 keeps the roadway surface uncut, with the line owner arranging the TxDOT right of way permit.
- Water service: A connection near South Commerce Street can be routed toward the City of Wills Point surface water system after the line owner is confirmed.
- Fiber drop: A route along Goodnight Boulevard can carry fiber conduit beneath pavement rather than opening a street trench.
- Creek crossing: A Wills Creek bore needs a planned path beneath the channel and a check for federal jurisdiction.
- Rail crossing: A route beneath the Union Pacific Mineola Subdivision depends on an agreement with Union Pacific for its track crossing.
- Replacement bore: A route along 4th Street can replace an older service without assuming the depth or position of buried lines.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Goodnight Boulevard in Wills Point?
For a Wills Point quote, start with the address or map pin, such as a route off Goodnight Boulevard. For Wills Point, tell us what goes in the ground, plus pipe or conduit size and footage. A sketch or plans help us see how the route meets US 80, a street crossing or a utility connection.
The price for a Wills Point bore follows the actual route and work. Crockett clay matters first because sticky ground can take staged reaming and careful pipe pull. We also look at pipe size, footage, marked utilities to expose, pavement at US 80 or Goodnight Boulevard, and any Wills Creek drainage crossing. Pit work, excavator time, sand backfill, high profile or emergency needs and the 271 road miles from Yukon can also change the scope.
Questions people ask about boring in Wills Point
Does Trinity Boring Solutions take jobs in Wills Point, Van Zandt County, and who staffs them?
Yes, we take directional boring work in Wills Point, Van Zandt County. Our own crews handle jobs, and we also work from satellite yards run by partner drilling contractors we have vetted. You deal with Trinity from the first call through the bore log, whether the crew is ours or a partner’s. We can plan routes along streets such as Goodnight Boulevard.
Can a line be bored under Wills Creek in Wills Point?
A line can be planned beneath Wills Creek, whose channel runs 0.18 miles inside Wills Point. We plan the route to stay beneath the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction. The mapped 3 street crossings of named streams show why the path and access points need to be reviewed before drilling.
Who runs Wills Point’s public water system, and where does its water come from?
The City of Wills Point runs the public water system, and its source is surface water. We use Wills Point’s public records, 2,427 service connections and 7,281 people served, as underground planning context. For a bore near South Commerce Street, we still confirm which line serves the address before laying out a connection or replacement route.
Which electric company serves Wills Point, Van Zandt County, and who confirms conduit specifications?
Several utilities report service in Van Zandt County: Oncor Electric Delivery Company, Southwestern Electric Power, Texas New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative. That list does not identify the provider at every Wills Point address. The line owner confirms conduit specifications for a route near US 80.
Who controls 4th Street in Wills Point, and does a bore need a street cut?
4th Street is a city street in incorporated Wills Point, so it belongs to the city itself. A directional bore can pass beneath the street rather than cutting through its surface. The exact route and any right of way involved still matter, especially where 4th Street meets marked utilities.
How old are buried lines near South Commerce Street in Wills Point?
The American Community Survey 2019 to 2023 five year estimates give Wills Point a median housing year of 1975, with 31 percent of homes built before 1960. That does not establish the age of a particular buried line near South Commerce Street. For a replacement bore, we expose marked utilities first because their depth is not shown by surface marks.
What bore sizes and lengths can Trinity handle in Wills Point near North Commerce Street?
We handle bores from 3/4 inch service lines up to 48 inch casing, with lengths from 10 feet to 5,000 feet. That range can suit a small connection near North Commerce Street or a larger route beneath a crossing. The pipe, footage and Crockett clay help determine the method and equipment.
How much notice does Texas811 need for a Wills Point bore near Goodnight Boulevard?
For excavation near Goodnight Boulevard, Texas law requires a locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. We plan Wills Point scheduling around Texas811’s notice of at least two working days. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring in Wills Point under US 80?
The US 80 route, pipe size and footage all affect a Wills Point bore. Crockett clay can call for staged reaming, while pavement, utilities to expose and a creek or drainage crossing add work. The number of pits, excavator time, sand backfill, emergency conditions and mobilization from the Yukon yard also shape the scope.
Where the Wills Point facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Wills Point
- U.S. Census Bureau, TIGER/Line 2024: Wills Point boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Wills Point
- U.S. Census Bureau, American Community Survey 2019 to 2023: Wills Point housing units and year built
- Macrostrat geologic map compilation: map units under Wills Point
- U.S. EPA Safe Drinking Water Information System: public water systems serving Wills Point
- U.S. Department of Transportation, North American Rail Network: track owners in Van Zandt County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Van Zandt County
- U.S. Geological Survey, Elevation Point Query Service: Wills Point elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Wills Point
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Wills Point
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Wills Point, Texas
Type the address of your job in Wills Point. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Wills Point
Same county: Canton · Grand Saline · Van · Callender Lake · Edom · Ben Wheeler. All counties: Texas county list.
