Quick Answer: For Edgewood, the USDA soil survey maps fine sandy loam near the surface and clay or clay loam at about 40 inches. We take directional boring, also called horizontal directional drilling (HDD), work in Edgewood for crossings of US 80 and Union Pacific track. Edgewood is 278 road miles from our Yukon, Oklahoma main office, a factor for work near Front Street. Freestone soils cover 53 percent of mapped area, while heavy clay below can cling to a reamer and favors staged passes.
Edgewood bores at a glance
- Incorporated city in Van Zandt County, Texas. Population 1,752 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 278 miles, about 5.5 hours of driving.
- Ground: Freestone soil is mapped on 53 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 80, FM 859 and FM 1504. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
- Public water: City of Edgewood, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does Trinity do directional boring near US 80 in Edgewood?
Trinity Boring Solutions takes directional boring work in Edgewood, Van Zandt County, where the USDA soil survey shows fine sandy loam near the surface and clay lower down. The Census Bureau Vintage 2024 estimate puts the town at 1,752 people. We install water, sewer, gas, electric conduit and fiber along routes such as Front Street, Houston Street and US 80, with the bore path set to the line and crossings.
Our main office is in Yukon, Oklahoma, and Edgewood work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Edgewood planning, we rely on our family business, which started in 1965 and has done directional boring since 1982. That experience fits Edgewood jobs ranging from a 3/4 inch service line near FM 859 to a 48 inch casing crossing US 80; we stay involved from the first call through the bore log.

What does the USDA soil survey show for Freestone soil in Edgewood?
The USDA soil survey maps Freestone soil across 53 percent of Edgewood, commonly as fine sandy loam on 1 to 3 percent slopes. Woodtell and Derly are also mapped, with smaller areas of Nahatche. Near the surface, fine sandy loam covers 53 percent of the mapped area, loam 29 percent and silt loam 17 percent. At about 40 inches, the mapped texture is clay across 53 percent and clay loam across 46 percent. Heavy clay is mapped under 95 percent of the area at that depth. Across Edgewood, we treat these as soil survey patterns, not test borings, when planning a bore route.
| USDA soil survey, inside the Edgewood city limits | What is mapped |
|---|---|
| Soil series mapped | Freestone 53 percent, Woodtell 26 percent, Derly 17 percent and Nahatche 3 percent |
| Texture at the surface | fine sandy loam 53 percent, loam 29 percent and silt loam 17 percent |
| Texture about 40 inches down | clay 53 percent and clay loam 46 percent |
| Engineering class about 40 inches down | fat clay (CH) 79 percent and lean clay (CL) 20 percent |
| Average clay content about 40 inches down | 49 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 73 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 98 percent of the area |
Bedrock is not mapped in the top five feet of Edgewood, though the Wilcox Group, undivided, is mapped as Paleogene geology; deeper rock is still possible. A seasonal water table is mapped within 60 inches across 73 percent of the area, so pits may need pumping. Flood prone soils cover 3 percent, a factor near drainage routes. With high steel corrosion risk mapped across 98 percent in Edgewood, we advise line owners to consider casing and tracer wire materials. HDPE is unaffected by soil corrosion, while steel coating choices belong to the line owner.
How do we plan a bore through clay in Edgewood?
Edgewood’s heavy clay can stick to tooling and grip the pipe. Near US 80 or Front Street, we adjust the drilling fluid and reaming sequence to the mapped ground and keep the surface in view.
- Fluid and clay: Edgewood’s heavy clay can build up on a reamer, so we use a thinner fluid mix and polymer, then open the hole in stages.
- Same day pull: Where Edgewood’s clay could tighten around the pipe, we plan the pull soon after the final ream rather than leave the hole open.
- Wet pits: With a seasonal water table mapped across much of Edgewood, we keep pits compact and pump water when needed.
- Utility exposure: Before a bore near Houston Street or US 80, we expose each marked utility on the path and track drill depth and pitch from the surface.

What crossings should a new line plan for in Edgewood near Union Pacific?
Edgewood has US 80, FM 859 and FM 1504 within its limits, with 1.2 mapped roadway miles of US 80. Front Street is the longest named street at 2.43 miles, followed by Houston Street at 1.92 miles and Crooked Creek Road at 1.48 miles. A bore route across one of these streets can pass below the paved surface rather than cut across it. The exact path still depends on buried lines, access for the entry and exit pits, and the road or driveway profile.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 80 | US highway | 1.2 roadway miles inside | State highway office |
| FM 859 | State highway | 0.6 roadway miles inside | State highway office |
| FM 1504 | State highway | 0.5 roadway miles inside | State highway office |
| Union Pacific | Railroad | 0.98 track miles inside | The railroad |
| Giladon Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Edgewood City Lake | Lake or pond | 53 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Old City Lake | Lake or pond | 16 acres, nearby | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.98 track miles inside Edgewood on its Mineola Subdivision, and four street and rail crossings are mapped in town. A line crossing the tracks needs an agreement from the railroad that owns them, with crossing conditions set through that agreement. No named stream runs inside the town limits, and no street crossing of a named stream is mapped there. Giladon Creek is 0.1 mile outside the limits, while 3.13 miles of unnamed drainage are mapped inside; Edgewood City Lake and Old City Lake are nearby but outside town.
Who permits a bore in Edgewood, Van Zandt County?
For a bore in the US 80, FM 859 or FM 1504 right of way in Edgewood, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Tyler District reviews it. The permit sets the work conditions. For example, highway crossings need 60 inches of cover for electric, communication and water lines, and pressurized sewer; the required cover along the right of way differs by line type. We supply the bore plan and profile and work under the utility owner’s permit. A crossing of the Union Pacific track also needs that railroad’s agreement. A planned water crossing at Giladon Creek is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines are already in the ground in Edgewood near City of Edgewood?
The City of Edgewood public water system uses surface water and reports 808 service connections serving 1,530 people. For electric service in Van Zandt County, public records list Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative. The line owner for a specific Edgewood address must be confirmed before planning an electric conduit bore; the county list does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Edgewood | Public water system | Surface water | 808 connections, 1,530 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Van Zandt County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates put Edgewood’s median housing year at 1974; 17 percent of homes were built before 1960 and 13 percent in 2000 or later. That mix can mean a project is replacing an older line or adding a service to newer housing. On an Edgewood bore path, we hydrovac pothole every marked utility before drilling near it. For a proposed crossing along Houston Street, that means exposing marked lines to confirm their depth; paint shows position, not depth.

Do you cover Edgewood and nearby Myrtle Springs?
Edgewood is an incorporated town in Van Zandt County, at an elevation of 466 feet and within 1.44 square miles. ZIP code 75117 serves the town. Fruitvale is 4.6 miles east, Myrtle Springs is 5.6 miles southwest, Wills Point is 7.3 miles west, Canton is 9.5 miles south and Grand Saline is 10.0 miles east. Canton is the county seat; Mineola, the nearest larger city, is 23.5 miles east. Our Yukon, Oklahoma yard is 278 road miles away, about a 5.5 hour drive, which affects mobilization for work near US 80.
Places near Edgewood
- Directional boring in Fruitvale: 4.6 miles east
- Directional boring in Myrtle Springs: 5.6 miles southwest
- Directional boring in Wills Point: 7.3 miles west
- Directional boring in Canton: 9.5 miles south
- Directional boring in Grand Saline: 10 miles east
- Directional boring in Mineola: 23.5 miles east
Which Edgewood jobs may need a bore near Giladon Creek?
- Highway crossing: A route beneath US 80 uses a bore plan that accounts for pavement, travel lanes and the utility owner’s TxDOT permit.
- Rail crossing: A line across the Union Pacific Mineola Subdivision needs an agreement with the railroad and a route that fits its crossing conditions.
- Street service: A water, sewer or conduit run along Houston Street can use entry and exit pits off the paved path, subject to site access.
- Creek crossing: A proposed bore near Giladon Creek needs a route planned below the channel and a jurisdiction check during planning.
- Drainage crossing: The 3.13 mapped miles of unnamed drainage in Edgewood can affect bore depth and pit placement.
- Water service: A connection near the City of Edgewood system starts with confirming the line owner and identifying the route to the property.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How can I price a bore near Front Street in Edgewood?
A map pin matters for a Front Street quote because the exact route determines which streets, utilities or drainage features the bore must pass. Send the Edgewood address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us check the route, pit locations and nearby crossings before we scope the work.
A short route through Freestone soil with clear access and few crossings is simpler to plan than a longer route through heavy clay near US 80 or Union Pacific track. The scope also depends on pipe or conduit size, exposed utilities, pavement or concrete, creek or drainage crossings, and pit or excavator needs. Edgewood’s 278 road miles from Yukon affect mobilization. High profile or emergency work can add planning demands; we set the price from the job details rather than one feature alone.
Questions people ask about boring in Edgewood
Does Trinity take directional boring jobs in Edgewood, Van Zandt County, and who staffs them?
Yes, Trinity takes directional boring work in Edgewood, Van Zandt County. Our Yukon office coordinates the job, and work is handled by our own crews or by crews from partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including on a route near US 80.
Can a line be bored beneath Giladon Creek near Edgewood?
A bore beneath Giladon Creek can be considered after the route, ground and crossing conditions are reviewed. The creek is 0.1 mile outside Edgewood’s limits, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. The bore plan must account for the channel and suitable entry and exit locations.
Where does Edgewood’s public water come from, and who operates the system?
The City of Edgewood owns and runs the public water system, which uses surface water. Public records show 808 service connections and 1,530 people served in Edgewood, figures we use when planning underground work. For a proposed service near Front Street, confirm the address and connection point with the system owner before setting the bore route.
Which electric companies report service in Edgewood, Van Zandt County, and who confirms conduit specs?
Oncor Electric Delivery Company, Southwestern Electric Power, Texas-New Mexico Power, Farmers Electric Cooperative, Trinity Valley Electric Cooperative and Wood County Electric Cooperative report service in Van Zandt County. The provider at a particular Edgewood address must be confirmed with the line owner, who can also confirm conduit requirements for a bore near FM 859.
Are Edgewood streets such as Crooked Creek Road controlled by the city, and must pavement be cut?
Crooked Creek Road is a city street because Edgewood is incorporated. Directional boring can place a line beneath the street without cutting its paved surface, with pits on either side of the crossing when access allows. The route still needs to account for marked utilities and the actual road profile.
What do Edgewood’s Houston Street housing ages suggest about replacement bores?
The American Community Survey 2019 to 2023 estimates put Edgewood’s median housing year at 1974, with 17 percent of homes built before 1960. A project near Houston Street could replace an older buried service or add a line to newer housing. We expose marked utilities before drilling near them so the route can account for existing lines.
How far is Edgewood from the Yukon office, and does Mineola change the job plan?
Edgewood is 278 road miles and about a 5.5 hour drive from our Yukon, Oklahoma main office. Mineola is the nearest larger city, 23.5 miles east of Edgewood. The distance from Yukon affects mobilization planning for a job near US 80, while the bore route and site conditions determine the work itself.
How much Texas811 notice does an Edgewood bore near Front Street need, and what if marks move?
For a bore near Front Street, submit a Texas811 locate request at least 48 hours before excavation, counting working days and excluding Saturdays, Sundays and legal holidays. Do not submit earlier than 14 days before the planned start. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of a directional bore beneath US 80 in Edgewood?
The Edgewood job scope drives the price: length, pipe or conduit size, soil, utility crossings, pavement, creek or drainage crossings, pit work and excavator time all matter. Heavy clay can affect the drilling plan, while a US 80 crossing or Union Pacific track crossing adds coordination. Mobilization from Yukon is another factor for a job in Edgewood.
Where the Edgewood facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Edgewood
- U.S. Census Bureau, TIGER/Line 2024: Edgewood boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Edgewood
- U.S. Census Bureau, American Community Survey 2019 to 2023: Edgewood housing units and year built
- Macrostrat geologic map compilation: map units under Edgewood
- U.S. EPA Safe Drinking Water Information System: public water systems serving Edgewood
- U.S. Department of Transportation, North American Rail Network: track owners in Van Zandt County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Van Zandt County
- U.S. Geological Survey, Elevation Point Query Service: Edgewood elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Edgewood
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Edgewood
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Edgewood, Texas
Type the address of your job in Edgewood. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Edgewood
Same county: Van · Callender Lake · Edom · Ben Wheeler. All counties: Texas county list.