Walnut Springs Texas Directional Boring: Krum Clay, Texas State Highway 144, Steele Creek
Quick Answer: The City of Walnut Springs runs the local groundwater system, while Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service report service in Bosque County, so we confirm the line owner before a bore. We do directional boring, also called horizontal directional drilling (HDD), for crossings such as Texas State Highway 144. Walnut Springs is 280 road miles from our Yukon, Oklahoma main office, and Farm Road 927 is one local route to plan around. Krum clay covers much of the mapped ground and can cling to the reamer, so the drilling fluid and reaming pace matter.
Walnut Springs bores at a glance
- Incorporated city in Bosque County, Texas. Population 898 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 280 miles, about 5.6 hours of driving.
- Ground: Krum soil is mapped on 82 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 9 percent of the area.
- Highways inside the boundary: Texas State Highway 144 and FM 927. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Steele Creek.
- Public water: City of Walnut Springs, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Farm Road 927 in Walnut Springs?
The City of Walnut Springs operates the local groundwater system, and the electric utilities reporting service in Bosque County include Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service. We confirm the owner of the line before planning a conduit bore along Farm Road 927 or another local street. The Census Bureau Vintage 2024 estimate puts Walnut Springs at 898 people, a small service area with streets and existing utilities to locate carefully.
Our main office is in Yukon, Oklahoma, and Walnut Springs work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have drilled directionally since 1982, bringing four decades of boring experience to the Krum clay and Walnut Clay mapped here. That ground can hold a hole open but may load the reamer with sticky clay, so the crew has to manage fluid and reaming stages.

What ground should we expect in Walnut Springs and Krum soil?
The USDA soil survey maps Krum soil across 82% of Walnut Springs, including Krum clay on 70% of the mapped area at 1 to 3 percent slopes and 12% at 0 to 1 percent slopes. Clay makes up 85% of mapped surface texture and 82% at about 40 inches below the surface; the average clay content at that depth is 44%. These are mapped soil patterns, not test borings. For a bore, the heavy clay can stick to the reamer and grip the pipe, so the reaming sequence and timing of the pull matter.
| USDA soil survey, inside the Walnut Springs city limits | What is mapped |
|---|---|
| Soil series mapped | Krum 82 percent, Cranfill 7 percent, Purves 4 percent and Maloterre 3 percent |
| Texture at the surface | clay 85 percent and gravelly clay loam 10 percent |
| Texture about 40 inches down | clay 82 percent, bedrock 7 percent and gravelly clay loam 7 percent |
| Engineering class about 40 inches down | fat clay (CH) 82 percent, silty gravel (GM) 7 percent and lean clay (CL) 4 percent |
| Average clay content about 40 inches down | 44 percent |
| Bedrock mapped within 60 inches | 9 percent of the area (9 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 86 percent of the area |
The USDA soil survey maps bedrock within 60 inches on 9% of the area, including hard bedrock on 9% and weathered bedrock on 1%; typical mapped depth is 21 inches. Seasonal water table and flood prone soils are not mapped in the city, but that does not remove the need to plan a Steele Creek crossing carefully. High steel corrosion risk is mapped on 86% of the area, so the line owner should select any protection for steel casing or tracer wire. The geologic map unit is Walnut Clay, Albian age, with clay, limestone and shale; the mix can change drilling resistance along a route.
How do we bore through Walnut Springs clay?
Krum clay is the main mapped soil in Walnut Springs, so we plan for sticky cuttings and a hole that can grip the pipe. The bore path, nearby pavement and utility marks shape each pass.
- Krum clay dominates the mapped soils, so we use a thinner drilling fluid with polymer and ream in stages to manage sticky cuttings.
- Because heavy clay can hold pressure, we watch fluid returns near Farm Road 927 pavement to reduce the chance of lifting the surface.
- We expose marked utilities with hydrovac potholing near Norway Street before the drill approaches; paint locates position but does not show depth.
- A walkover locator follows the drill head around Steele Creek, while the crew records depth and pitch as the bore advances.

Which roads and creeks could a Walnut Springs bore cross near Steele Creek?
Texas State Highway 144 runs 1.1 mapped roadway miles inside Walnut Springs, and FM 927 accounts for 0.1 mapped roadway miles. Farm Road 927 is also the longest named street at 1.3 miles. Norway Street runs 1.24 miles and Denmark Street runs 1.03 miles, so a route may pass several street fronts before reaching a crossing. We plan the entry and exit pits off the pavement where access allows, keeping the road surface intact while the bore passes beneath it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 144 | State highway | 1.1 roadway miles inside | State highway office |
| FM 927 | State highway | 0.1 roadway miles inside | State highway office |
| Steele Creek | Stream | 1.38 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Rock Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Walnut Springs or within one mile outside its limits, and no street and rail crossings are mapped in the city. Steele Creek runs 1.38 channel miles inside the limits, with five mapped street crossings of named streams in all. Rock Creek lies 0.5 miles outside the city limits, and no lakes or ponds are mapped within one mile. For a Steele Creek route, the bore plan needs to account for the channel and check for federal waterway jurisdiction during planning.
Who approves a Walnut Springs bore in Bosque County?
For city streets such as Norway Street, Walnut Springs is incorporated, so its streets belong to the city itself. Work in the right of way of Texas State Highway 144 or Farm Road 927 needs a TxDOT utility permit reviewed by the TxDOT Waco District. The utility that owns the line submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the utility owner’s permit. At Texas State Highway 144 crossings, electric and communication lines need 60 inches of cover below the lowest crossed grade, and water lines need 60 inches. TxDOT may set another depth in the permit. A Steele Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Walnut Springs for the City of Walnut Springs?
The City of Walnut Springs public water system serves 795 people through 360 service connections and gets its water from groundwater wells. For electric work, Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service report service in Bosque County. Those county records do not identify the owner at every address, so we confirm the specific line owner before a conduit bore near Farm Road 927 or another street.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Walnut Springs | Public water system | Groundwater wells | 360 connections, 795 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Bosque County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median year built for Walnut Springs housing at 1988. The estimates show 28% of homes built before 1960 and 37% built in 2000 or later. That mix can mean older lines to replace as well as newer service connections along Norway Street. Before drilling near a marked utility, we use hydrovac potholing to expose it; paint shows its position, not its depth.

Do you cover Walnut Springs and nearby Iredell?
Walnut Springs is an incorporated city in Bosque County, at an elevation of 911 feet, covering 1.33 square miles and using ZIP code 76690. Iredell is 8.6 miles southwest, Morgan is 8.9 miles east, and Meridian, the county seat, is 10.8 miles southeast. Glen Rose is 13.1 miles north, and Pecan Plantation is the nearest larger city listed, 21.9 miles north. Our Yukon, Oklahoma main office is 280 road miles away, about a 5.6 hour drive, so distance is part of planning work on Farm Road 927 and nearby rural routes.
Places near Walnut Springs
- Directional boring in Iredell: 8.6 miles southwest
- Directional boring in Morgan: 8.9 miles east
- Directional boring in Meridian: 10.8 miles southeast
- Directional boring in Glen Rose: 13.1 miles north
- Directional boring in Kopperl: 14.8 miles east
- Directional boring in Pecan Plantation: 21.9 miles north
Which Walnut Springs jobs call for a bore near Norway Street?
- Highway crossing: A bore beneath Texas State Highway 144 keeps the pavement uncut, with the utility owner handling the TxDOT permit.
- Water service: A new connection near the City of Walnut Springs groundwater system needs a route checked against existing water lines.
- Fiber conduit: A run along Norway Street can pass beneath pavement and driveways without opening a trench across the street.
- Creek crossing: A route under Steele Creek needs a channel plan and a check for U.S. Army Corps of Engineers jurisdiction.
- Electric conduit: A bore near Farm Road 927 starts with confirming which Bosque County reporting utility owns the line at that address.
- Acreage service: A longer route outside Walnut Springs toward Iredell may need extra footage and mobilization planning from Yukon.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Walnut Springs job near Sweden Street?
Start with a map pin or address; an exact spot on Sweden Street or near Steele Creek shows us what the bore may cross. Tell us what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see the route, entry and exit pits, pavement and marked utilities before we shape the work.
A short, accessible run through Krum clay with few exposed utilities is simpler to plan than a long crossing under Texas State Highway 144 or Steele Creek. Length, pipe or conduit size, soil and rock, utility crossings, pavement, creek or drainage crossings, pits, excavator time and sand backfill all affect the scope. Mobilization also matters because Walnut Springs is 280 road miles from Yukon. High profile or emergency work can add planning demands.
Questions people ask about boring in Walnut Springs
Does Trinity Boring Solutions take directional boring work in Walnut Springs and Bosque County?
Yes. We take directional boring work in Walnut Springs and staff it with our own crews or crews from satellite yards run by drilling partners we have vetted. You work with Trinity from the first call through the bore log, regardless of which crew is on site. Farm Road 927 and the Krum clay mapped in town help define the route and ground conditions.
Is there rock under Walnut Springs, and how much is mapped in the top five feet?
The USDA soil survey maps bedrock within five feet on 9% of Walnut Springs, with hard bedrock mapped on 9% and weathered bedrock on 1%. Typical mapped bedrock depth is 21 inches. Those are soil survey patterns rather than a finding for a specific bore, so a route near Norway Street still needs site level planning.
Who approves a bore under Texas State Highway 144 in Walnut Springs?
TxDOT reviews the utility permit through its Waco District for work in the right of way of Texas State Highway 144. The utility owner files through TxDOT’s RULIS system, and we prepare the bore plan and profile for that permit. The required cover depth depends on line type, and TxDOT may set a different depth in the permit.
Can a line be bored under Steele Creek in Walnut Springs?
A line can be planned beneath Steele Creek without cutting the channel, subject to the site route and ground conditions. The creek runs 1.38 channel miles within Walnut Springs, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Entry and exit pits also need a workable location on each side.
Who runs Walnut Springs water service, and where does the water come from?
The City of Walnut Springs runs the public water system, which uses groundwater wells. Public system records list 795 people served through 360 service connections. For a new bore near the city water lines, we need the proposed route and the marked utility locations before selecting a path.
Which electric company owns the lines in Walnut Springs and Bosque County?
County records list Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service as reporting service in Bosque County. The records do not establish which provider owns a particular line near Farm Road 927. Confirm the line owner before setting conduit specifications or planning the bore.
Does Trinity cover Iredell and rural sites outside Walnut Springs?
We take work in Walnut Springs, nearby Iredell and rural locations outside the city limits. Iredell is 8.6 miles southwest of Walnut Springs, and route length and access help shape the mobilization plan. Share a map pin or address near Iredell or another local road so we can review the proposed path.
How much Texas811 notice do I need before a bore near Farm Road 927 in Walnut Springs?
Texas law requires a locate request at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before the start. Texas811 describes that as at least two working days. If a Farm Road 927 start slips more than 14 days past the original notice, request a new ticket; have worn or moved marks refreshed before work continues.
What affects the cost of a Walnut Springs bore under Texas State Highway 144?
The job scope sets the price: length, pipe or conduit size, soil and rock, exposed utility crossings, pavement, pits and equipment time all matter. Krum clay can affect the reaming plan, while a Texas State Highway 144 crossing adds permit and cover planning. Steele Creek or drainage work and the 280 road miles from Yukon can also affect the job.
Where the Walnut Springs facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Walnut Springs
- U.S. Census Bureau, TIGER/Line 2024: Walnut Springs boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Walnut Springs
- U.S. Census Bureau, American Community Survey 2019 to 2023: Walnut Springs housing units and year built
- Macrostrat geologic map compilation: map units under Walnut Springs
- U.S. EPA Safe Drinking Water Information System: public water systems serving Walnut Springs
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bosque County
- U.S. Geological Survey, Elevation Point Query Service: Walnut Springs elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Walnut Springs
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Walnut Springs
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Walnut Springs, Texas
Type the address of your job in Walnut Springs. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Walnut Springs
Same county: Clifton · Laguna Park · Valley Mills · Cranfills Gap · Mosheim. All counties: Texas county list.