Jacksonville Texas Directional Boring: Nacogdoches Soil, US 69 And Ragsdale Creek
Quick Answer: Along US 69 and the Union Pacific Palestine Subdivision, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), in Jacksonville, Texas. Jacksonville has 180.76 public road centerline miles across its 347 named streets, including Jackson Street and Bolton Street. The Yukon main office is 331 road miles away, so a bore near Ragsdale Creek includes that distance in mobilization planning. Nacogdoches soil and clay mapped below the surface can make the hole sticky, so the drilling plan matters.
Jacksonville bores at a glance
- Incorporated city in Cherokee County, Texas. Population 14,639 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 331 miles, about 6.6 hours of driving.
- Ground: Nacogdoches soil is mapped on 20 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 19 percent of the area.
- Highways inside the boundary: US 69, US 79, US 175, FM 347 and Loop 456. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 14 mapped street and rail crossings.
- Named streams inside the boundary: Ragsdale Creek, Keys Creek, Barber Branch and Byrd Branch.
- Public water: City of Jacksonville, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Jackson Street in Jacksonville?
We take directional boring work in Jacksonville, in Cherokee County, where the Census Bureau Vintage 2024 estimate puts the population at 14,639. Along Jackson Street, Bolton Street or US 69, we can bore water, sewer, gas, electric conduit or fiber lines beneath pavement and other obstacles. The route and line size shape the equipment and bore plan.
Our main office is in Yukon, Oklahoma, and Jacksonville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have drilled directionally since 1982; the work ranges from 3/4 inch service lines to 48 inch casing, a span that can suit a small service route or a crossing near US 69.

What is Jacksonville ground like to bore through Nacogdoches soil?
The USDA soil survey maps Nacogdoches soil series across 20 percent of Jacksonville. Fine sandy loam is the most common surface texture, mapped across 53 percent of the area, while about 40 inches down the survey maps clay across 30 percent and sandy clay loam across 25 percent. Heavy clay is mapped at that depth in 33 percent of the area. Those are mapped patterns, not jobsite test results. Along Ragsdale Creek or Jackson Street, actual ground can vary, so the bore plan needs room to adjust as the drill advances.
| USDA soil survey, inside the Jacksonville city limits | What is mapped |
|---|---|
| Soil series mapped | Nacogdoches 20 percent, Trawick 18 percent, Bowie 10 percent, Elrose 8 percent and Darco 6 percent |
| Texture at the surface | fine sandy loam 53 percent, loamy fine sand 20 percent and paragravelly clay loam 9 percent |
| Texture about 40 inches down | clay 30 percent, sandy clay loam 25 percent and loamy fine sand 12 percent |
| Engineering class about 40 inches down | fat clay (CH) 27 percent, clayey sand (SC) 19 percent and lean clay (CL) 18 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | 19 percent of the area (0 percent hard rock, 19 percent weathered rock) |
| Seasonal water table within 60 inches | 22 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 58 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 19 percent of Jacksonville, with a typical mapped depth of 38 inches; the Queen City Sand unit includes claystone and sandstone and is Lutetian in age. The survey also maps a seasonal water table within 60 inches in 22 percent of the area and flood prone soils in 5 percent, worth checking near Ragsdale Creek. High steel corrosion risk is mapped in 58 percent, so the line owner should address casing and tracer wire materials; HDPE is not affected by that soil corrosion concern.
How do crews handle clay while boring in Jacksonville?
Nacogdoches soil and clay mapped below Jacksonville can make cuttings sticky and can grip a pipe. We adjust fluid and reaming to the ground, while watching returns near streets such as Jackson Street.
- With clay mapped in 33 percent of Jacksonville at about 40 inches, we use staged reaming and adjust drilling fluid to limit sticky cuttings and pipe grip.
- Fine sandy loam covers 53 percent of the mapped area at the surface, so we plan reaming and fluid to help keep loose ground supported.
- Near Ragsdale Creek, we plan the bore depth around the channel and assess the route for water or wet ground that could affect pits.
- Where a route crosses Jackson Street, we expose marked utilities with hydrovac potholing, then track the drill head and log its depth and pitch.

Where does a line have to go under US 69 in Jacksonville?
US 69 has 8.0 mapped roadway miles inside Jacksonville, alongside US 79, US 175, FM 347, Loop 456, FM 768, Texas State Highway 135 and Texas State Highway 204. A utility crossing on a state highway needs a bore plan that fits the road and its right of way. The city has 180.76 public road centerline miles, with Jackson Street extending 6.62 miles, Bolton Street 4.36 miles and Rusk Street 3.73 miles within the limits. A bore can pass beneath pavement instead of opening a cut across those routes.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 69 | US highway | 8 roadway miles inside | State highway office |
| US 79 | US highway | 4.8 roadway miles inside | State highway office |
| US 175 | US highway | 1.2 roadway miles inside | State highway office |
| FM 347 | State highway | 5.9 roadway miles inside | State highway office |
| Loop 456 | State highway | 3.2 roadway miles inside | State highway office |
| FM 768 | State highway | 2.1 roadway miles inside | State highway office |
| Texas State Highway 135 | State highway | 1.5 roadway miles inside | State highway office |
| Texas State Highway 204 | State highway | 1.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 4.2 track miles inside | The railroad |
| Ragsdale Creek | Stream | 3.47 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Keys Creek | Stream | 1.25 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Barber Branch | Stream | 0.41 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Byrd Branch | Stream | 0.17 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cat Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 4.2 track miles within Jacksonville on its Palestine Subdivision, and 14 mapped street and rail crossings make track coordination relevant to route planning. The city also has 3.47 channel miles of Ragsdale Creek and 19 mapped street crossings of named streams. Lake Jacksonville and Lake Acker are inside the limits. A creek or lake crossing needs a review for possible U.S. Army Corps of Engineers jurisdiction, while a rail crossing needs the railroad owner’s agreement.
Who approves a Jacksonville bore near Union Pacific track?
Under US 69 or another state highway in Jacksonville, the cover requirement helps set bore depth: electric and communication lines need 60 inches at a crossing, water lines need 60 inches, and pressurized sewer lines need 60 inches. TxDOT’s Tyler District reviews the utility permit for highway right of way, and the utility owner files through RULIS; we prepare the bore plan and profile for work under that permit. A crossing of Union Pacific track needs an agreement from the railroad, which sets its crossing conditions. A Ragsdale Creek route is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Jacksonville, Cherokee County?
The City of Jacksonville public water system uses surface water and reports 9,558 service connections serving 14,420 people. That network may be relevant when planning a water or sewer bore near Jackson Street. Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative report electric service in Cherokee County. We confirm the line owner for the particular location before planning a conduit bore, since the county service list does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Jacksonville | Public water system | Surface water | 9,558 connections, 14,420 people served |
| Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative | Electric utilities reporting service in Cherokee County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Jacksonville’s median housing year at 1980; 24 percent of housing was built before 1960 and 19 percent in 2000 or later. A replacement bore near Bolton Street may need to work around existing lines in older developed areas, while a new service has a different route and connection point. We use hydrovac potholing to expose marked utilities before drilling near them, because locate paint shows position, not depth.

How far is Jacksonville from Gallatin and nearby service areas?
Jacksonville is in Cherokee County, covers 15.15 square miles and sits at an elevation of 497 feet. Its ZIP code is 75766. Gallatin is 7.9 miles southeast, New Summerfield is 9.0 miles east, and Cuney is 10.3 miles northwest. Rusk, the county seat, is 13.1 miles southeast; Tyler is 24.8 miles north. From the Yukon main office, Jacksonville is 331 road miles and 6.6 drive hours away, a distance that can affect equipment mobilization for a bore near US 69.
Places near Jacksonville
- Directional boring in Gallatin: 7.9 miles southeast
- Directional boring in New Summerfield: 9 miles east
- Directional boring in Cuney: 10.3 miles northwest
- Directional boring in Bullard: 13.1 miles north
- Directional boring in Rusk: 13.1 miles southeast
- Directional boring in Tyler: 24.8 miles north
Which jobs call for a bore near Rusk Street in Jacksonville?
- Highway crossing: A bore beneath US 69 can carry water, sewer or conduit under the roadway without cutting across its pavement.
- Street service: A water or sewer line can pass beneath Jackson Street, with hydrovac potholes locating marked utilities along the proposed path.
- Creek crossing: A route beneath Ragsdale Creek needs depth planning around the channel and a check for Corps jurisdiction.
- Rail crossing: A line beneath Union Pacific track in Jacksonville needs a railroad agreement and a plan for the track crossing.
- Lake crossing: A route near Lake Jacksonville may call for a review of the water crossing and where the bore pits can sit.
- Fiber route: A fiber conduit bore along Bolton Street can avoid an open cut across the street pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Jacksonville bore near Pine Street?
Start with a map pin near Pine Street or Ragsdale Creek, because the exact route can change what the bore must cross. Tell us what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us review access, pits and nearby utilities before pricing the Jacksonville work.
The job scope sets the price, including length, pipe or conduit size, soil, crossings and access. Clay mapped below Jackson Street can change reaming needs, while a US 69 or Union Pacific crossing brings its own planning and coordination. Creek crossings, pavement, exposed utilities, pits, excavator time and sand backfill also affect the work. Mobilization matters because Jacksonville is 331 road miles from Yukon; high profile or emergency work can change the job requirements.
Questions people ask about boring in Jacksonville
Does Trinity take directional boring jobs in Jacksonville, Cherokee County, and how are crews assigned?
Yes. We take directional boring work in Jacksonville and Cherokee County, with our own crews and crews from partner drilling contractors we have vetted. The assigned crew may work from a satellite yard, while you deal with Trinity through the bore log. A route near Jackson Street can be reviewed with the same project contact.
Who runs Jacksonville’s public water system, and where does its water come from?
The City of Jacksonville runs the public water system, which uses surface water. It reports 9,558 service connections and serves 14,420 people. If a proposed water or sewer bore follows Jackson Street, the system’s location and the specific connection point matter to route planning.
Which electric providers report service in Jacksonville, Cherokee County, and who confirms conduit specifications?
Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative report service in Cherokee County. The line owner for a specific Jacksonville address should be confirmed before conduit planning, since the county list does not establish which provider serves a property near Bolton Street.
Who is responsible for Jacksonville streets like Rusk Street, and must a bore cut the pavement?
Jacksonville is incorporated, so its city streets belong to the city itself. A directional bore beneath Rusk Street can pass below pavement rather than opening a trench through it. The proposed route and any highway right of way still need their own permit review when applicable.
What do older homes near Bolton Street mean for replacement bores in Jacksonville?
Jacksonville’s median housing year is 1980, and the American Community Survey 2019 to 2023 estimates show 24 percent of homes were built before 1960. A replacement line near Bolton Street may run through an area with existing buried utilities. We expose marked lines with hydrovac potholes before drilling close to them.
Can groundwater or flood prone soil affect bore pits near Ragsdale Creek in Jacksonville?
It can affect planning. The USDA soil survey maps a seasonal water table within 60 inches in 22 percent of Jacksonville and flood prone soils in 5 percent. Near Ragsdale Creek, we consider pit water and channel depth, and check whether a water crossing falls under U.S. Army Corps of Engineers jurisdiction.
Does Trinity cover Gallatin and rural sites outside Jacksonville, Texas?
Yes. We take work in Texas, including Jacksonville, nearby Gallatin and rural locations outside the city limits. Gallatin is 7.9 miles southeast of Jacksonville, and a job beyond the limits still needs a site specific route, utility information and access plan.
How much notice does Texas811 need for a bore near Jackson Street in Jacksonville, and what if marks move?
For a bore near Jackson Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the notice, submit a new request; worn or moved marks need refreshing through Texas811 before work resumes.
What affects the cost of directional boring near US 69 in Jacksonville?
The price depends on the job scope, not just footage. Length, line size, clay or other ground, crossings, pavement, creek work, pits, exposed utilities and equipment time can all matter. A US 69 crossing adds roadway planning, while Jacksonville’s 331 road miles from Yukon affect mobilization.
Where the Jacksonville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Jacksonville
- U.S. Census Bureau, TIGER/Line 2024: Jacksonville boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Jacksonville
- U.S. Census Bureau, American Community Survey 2019 to 2023: Jacksonville housing units and year built
- Macrostrat geologic map compilation: map units under Jacksonville
- U.S. EPA Safe Drinking Water Information System: public water systems serving Jacksonville
- U.S. Department of Transportation, North American Rail Network: track owners in Cherokee County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Cherokee County
- U.S. Geological Survey, Elevation Point Query Service: Jacksonville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Jacksonville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Jacksonville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Jacksonville, Texas
Type the address of your job in Jacksonville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Jacksonville
Same county: Shadybrook · Alto · Wells · Reklaw. All counties: Texas county list.
