trinityboringsolutions.com

Cuney Texas Directional Boring: Trawick Soil, Neches River, US 175

Quick Answer: Along the Neches River, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for water, sewer or conduit routes without opening the bank. Cuney is 321 road miles from our Yukon, Oklahoma main office, and we staff US 175 area work with our own crews and vetted partner crews. The USDA soil survey maps Trawick soil here, and clay accounts for 37% of mapped material at about 40 inches. Sticky clay can grip pipe, so staged reaming and a prompt pullback matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Cuney bores at a glance

  • Incorporated city in Cherokee County, Texas. Population 117 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 321 miles, about 6.4 hours of driving.
  • Ground: Trawick soil is mapped on 23 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 24 percent of the area.
  • Highways inside the boundary: US 175 and FM 855. State permit office: TxDOT Tyler District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Neches River and Flat Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near the Neches River in Cuney?

From our Yukon yard, Cuney is 321 road miles away; we schedule our crews and vetted partner crews for work around US 175 and the Neches River. The Census Bureau Vintage 2024 estimate puts this incorporated Cherokee County town at 117 people. We can bore water, sewer, gas, electric conduit or fiber beneath Creek 3501 or local drives where the route needs to stay uncut.

Our main office is in Yukon, Oklahoma, and Cuney work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have drilled directionally since 1982. That experience covers 3/4 inch service lines through 48 inch casing, with the line size and route near US 175 guiding the setup.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

How does Trawick soil affect a bore in Cuney?

The USDA soil survey maps Trawick as 23% of Cuney’s soil series, with Nacogdoches also at 23%. Fine sandy loam covers 58% of the mapped surface, while loamy fine sand covers 21%. At about 40 inches below the surface, the survey maps clay under 37% of the area, clay loam under 24%, and sandy clay loam under 18%. Around Cuney, Trawick, Nacogdoches, Elrose, and Briley are mapped soil series, not test borings, so we verify conditions before boring. Clay can stick to a reamer and swell around pipe, so the actual route needs to guide fluid and reaming choices.

USDA soil survey, inside the Cuney city limitsWhat is mapped
Soil series mappedTrawick 23 percent, Nacogdoches 23 percent, Elrose 20 percent, Briley 11 percent and Betis 5 percent
Texture at the surfacefine sandy loam 58 percent, loamy fine sand 21 percent and paragravelly clay loam 12 percent
Texture about 40 inches downclay 37 percent, clay loam 24 percent and sandy clay loam 18 percent
Engineering class about 40 inches downfat clay (CH) 36 percent, lean clay (CL) 26 percent and clayey sand (SC) 16 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inches24 percent of the area (0 percent hard rock, 24 percent weathered rock)
Seasonal water table within 60 inches11 percent of the area
Flood prone soils8 percent of the area
High corrosion risk for uncoated steel55 percent of the area

The USDA soil survey maps bedrock within 60 inches under 24% of Cuney, including weathered bedrock under 24%; hard bedrock is not mapped in that depth range. A typical mapped bedrock depth is 40 inches, so a route may meet weathered rock and slow down. Seasonal water tables are mapped within 60 inches under 11% of the area, and flood prone soils under 8%, which matters near the Neches River. High steel corrosion risk covers 55%, so the line owner should choose any casing or tracer wire coating; HDPE avoids that soil corrosion concern. The geologic map unit is Queen City Sand, an Eocene unit described as quartz sand and clay.

How do we bore through Cuney clay?

Cuney’s mapped clay at about 40 inches can cling to a reamer, while fine sandy loam is common at the surface. We adjust the fluid and reaming plan to the route along streets such as Creek 3502.

  1. Because clay is mapped under 37% of Cuney at about 40 inches, we use a fluid plan suited to sticky ground and ream in stages.
  2. Where a route follows Creek 3502, we watch returns and keep fluid pressure controlled so ground does not lift pavement or a slab.
  3. The survey maps seasonal water tables within 60 inches under 11% of Cuney, so we plan manageable pits and pumping where a site is wet.
  4. Near the Neches River, we plan depth beneath the channel and check the proposed crossing during environmental review before setting the bore path.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What might a new line cross near Creek 3502 in Cuney?

US 175 runs 1.3 roadway miles inside Cuney, and FM 855 runs 0.1 mile. A utility route in either highway right of way needs TxDOT review, and a bore below existing pavement avoids cutting across the highway. Among the longer named streets, Creek 3502 runs 0.73 mile in town, Creek 3501 runs 0.64 mile, and County Road 3502 runs 0.27 mile. County Road 3522 adds another possible route to check on the plan. Street length alone does not establish where existing utilities sit.

CrossingTypeMapped extentWho has a say
US 175US highway1.3 roadway miles insideState highway office
FM 855State highway0.1 roadway miles insideState highway office
Neches RiverStream2.06 channel miles insideChecked for Corps of Engineers jurisdiction
Flat CreekStream0.57 channel miles insideChecked for Corps of Engineers jurisdiction
Jordan CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Coopers CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Caddo CreekStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Lake PalestineLake or pond1,834 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Cuney or within one mile outside its limits, and no mapped street and rail crossings are present. The Neches River runs 2.06 channel miles inside town, while Flat Creek runs 0.57 mile; no mapped street crossings of named streams are recorded. Lake Palestine, with 1,834 acres, is within one mile but outside town limits. A proposed crossing near the Neches River or Flat Creek needs site specific planning for the channel and access.

Who approves a bore in Cherokee County near Cuney?

Cuney is an incorporated town, so we treat Creek 3502 as a town street when planning a bore. For work in the right of way of US 175 or FM 855, the utility owner applies for the TxDOT utility permit through RULIS, and the TxDOT Tyler District reviews it. We prepare the bore plan and profile for the utility owner’s filing and work under the issued permit. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, and water crossings need 60 inches; pressurized sewer crossings also need 60 inches. A Neches River or Flat Creek crossing is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines may already be buried in Cherokee County near Cuney?

The water provider for a specific Cuney address has to be confirmed with the city, Cherokee County or the local water district before a bore is planned. EPA drinking water records do not connect a named system to this town, so the provider needs to be checked for the actual route near US 175 or Creek 3502. Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative report electric service in the county. Before planning an electric conduit bore near US 175, we confirm the line owner for that crossing.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric CooperativeElectric utilities reporting service in Cherokee CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Cuney’s median housing year at 1999, so we plan underground work around each site’s verified utility layout. The survey estimates that 33% of homes were built before 1960, 18% from 1960 to 1999, and 49% in 2000 or later. A route along County Road 3522 might serve a replacement line or a newer connection, but the age of a house does not show what is buried. We hydrovac pothole every marked utility on the bore path before the drill gets near it; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What is near Cuney and Frankston for a bore project?

Cuney is in Cherokee County, covers 1.64 square miles and sits at 442 feet elevation. Its ZIP code is 75759. Berryville is 4.8 miles northwest, Frankston is 5.4 miles west, Shadybrook is 5.5 miles north, Coffee City is 7.1 miles northwest, and Emerald Bay is 8.7 miles north. Bullard, the nearest larger city, is 9.3 miles northeast; Rusk, the county seat, is 22.7 miles southeast. From the Yukon, Oklahoma yard, the drive is 321 road miles and 6.4 hours, which is part of planning a route near US 175.

Places near Cuney

What kinds of bores come up near Creek 3501 in Cuney?

  • Highway crossing: A line under US 175 may need a bored route beneath the pavement, with the utility owner’s TxDOT permit guiding the work.
  • Water service: A new or replacement service along County Road 3522 needs the address specific water provider confirmed before the bore is planned.
  • Fiber conduit: A route near Creek 3501 can keep a fiber line below the street surface, with marked utilities exposed before drilling near them.
  • Creek crossing: A proposed route near Flat Creek needs channel depth and access considered, with jurisdiction checked during planning.
  • Hydrovac potholing: For a line planned beneath County Road 3502, we expose each marked utility on the path because paint does not show its depth.
  • River crossing: A proposed line beneath the Neches River needs a planned path that stays below the channel and accounts for the crossing review.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Cuney bore near County Road 3522?

We start a bore near County Road 3522 with the site address or a map pin. The exact spot matters near County Road 3522 because the route may approach US 175 or a drainage crossing. For crossings near Flat Creek, we plan around the material going underground, pipe or conduit size, and total footage. A sketch or plans help us check the proposed path and access.

The 321 road miles from Yukon affect mobilization for a Cuney job, and Trawick clay or weathered bedrock can change the drilling plan. Price also reflects bore length, pipe or conduit size, utility crossings that need exposure, and pavement or concrete near US 175. Creek or drainage crossings, pits, excavator time and sand backfill can add work. High profile or emergency timing also changes the job scope.

Questions people ask about boring in Cuney

Does Trinity Boring Solutions take directional boring work in Cuney, Cherokee County, and who staffs it?

Yes. We take directional boring work in Cuney, and it is handled by our own crews or crews from partner drilling contractors we have vetted. For work in Cherokee County, we stay your contact from the first call through the bore log, whichever crew is on site. That applies to routes near US 175 and the Neches River.

Does Trawick soil in Cuney create a steel corrosion concern, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk under 55% of Cuney, including mapped Trawick soil. At a crossing involving FM 855, the line owner chooses any coating for steel casing or tracer wire; we confirm that requirement before work. For mapped Elrose soils, we recognize HDPE does not have that soil corrosion concern. The material choice should match the planned line and route near Creek 3502.

What ground does a bore pass through in Cuney’s Trawick soil?

The USDA soil survey maps Trawick under 23% of Cuney’s area. At about 40 inches, clay is mapped under 37%, clay loam under 24%, and sandy clay loam under 18%. Sticky clay can cling to the reamer, so a bore near County Road 3522 may need staged reaming and fluid selected for the actual ground.

How much rock is mapped within five feet in Cuney, and is it hard or weathered?

The USDA soil survey maps bedrock within 60 inches under 24% of Cuney, and weathered bedrock is mapped under 24%. Hard bedrock is not mapped within that depth range. A bore near the Neches River may still encounter weathered rock, which can slow drilling compared with soil.

Who approves a directional bore under US 175 in Cuney, and which state office reviews it?

The utility owner applies for the TxDOT utility permit through RULIS when work is in the US 175 right of way. The TxDOT Tyler District reviews the application. We supply the bore plan and profile for the owner’s filing and work under the permit issued for the crossing.

Can a line be bored under the Neches River in Cuney?

A bore under the Neches River can be planned, subject to the route and site conditions. The river has 2.06 channel miles inside Cuney, so the bore plan needs to stay below the channel. The proposed crossing is also checked for federal waterway jurisdiction during planning.

Can I reach Trinity after hours for an urgent bore near County Road 3502 in Cuney?

Yes. For a project near Lake Palestine, we answer Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent job near County Road 3502, be ready to describe what line is involved, the location and any immediate access issue so we can understand the work needed.

How much notice does Texas811 need before a bore near Creek 3502 in Cuney?

Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For Cuney work under the TxDOT Tyler District, if the start slips more than 14 days past the original notice, we submit a new request. Have worn or moved marks refreshed through Texas811 before work continues near Creek 3502.

What affects the cost of a directional bore under US 175 near Cuney?

At 321 road miles from the Yukon main office, we set each Cuney job’s price according to its scope. For a US 175 route, factors include length, pipe or conduit size, the mapped Trawick clay and any bedrock, utilities to expose, and pavement or concrete. A Neches River or drainage crossing, pits, excavator time, backfill, urgency and mobilization from Yukon also affect the work.

Where the Cuney facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Cuney

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Cuney, Texas

Type the address of your job in Cuney. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Cuney

Same county: Jacksonville · Rusk · Alto · New Summerfield · Wells · Gallatin · Reklaw. All counties: Texas county list.