La Paloma Addition Texas Directional Boring: Calallen Soil, FM 2046 and Union Pacific
Quick Answer: Calallen sandy clay loam covers much of La Paloma Addition and can cling to a reamer; Trinity Boring Solutions uses directional boring, also called horizontal directional drilling (HDD), for routes beneath FM 2046. La Paloma Addition is 570 road miles from our Yukon, Oklahoma main office, and Union Pacific track lies 0.3 miles beyond its mapped community boundary. Calallen soil can hold an open hole, but sticky cuttings need careful fluid control. Private Road 84E is one local route where a bore can keep the surface intact.
La Paloma Addition bores at a glance
- Unincorporated community in San Patricio County, Texas. Population 314 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 570 miles, about 11.1 hours of driving.
- Ground: Calallen soil is mapped on 71 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 2046. State permit office: TxDOT Corpus Christi District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone handle directional boring in La Paloma Addition near FM 2046?
Calallen sandy clay loam can cling to tooling, but Trinity Boring Solutions takes directional boring jobs in La Paloma Addition, San Patricio County, beneath FM 2046 and local streets. The Census Bureau counted 314 residents in the 2020 Census. Our crews install water, sewer, gas, electric conduit and fiber along routes such as Private Road 84E, with the route planned for the specific line and site.
Our main office is in Yukon, Oklahoma, and La Paloma Addition work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record has no utility strike in over 25 years, a standard we carry to routes near FM 2046, where AEP Texas Central and San Patricio Electric Cooperative report electric service in the county. For La Paloma Addition planning, our family business began in 1965, and we have done directional boring since 1982.

What ground should we expect in La Paloma Addition near Calallen?
The USDA soil survey maps Calallen soil across 71 percent of La Paloma Addition, mainly as Calallen sandy clay loam with 0 to 1 percent slopes. Banquete clay covers 20 percent, while Orelia fine sandy loam covers 9 percent. At about 40 inches below the surface, the survey maps sandy clay loam across 80 percent of the area and clay across 20 percent. Average clay content at that depth is 33 percent. These broad map units help set expectations, but they are not a substitute for checking the actual bore route.
| USDA soil survey, inside the La Paloma Addition mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Calallen 71 percent, Banquete 20 percent and Orelia 9 percent |
| Texture at the surface | sandy clay loam 71 percent, clay 20 percent and fine sandy loam 9 percent |
| Texture about 40 inches down | sandy clay loam 80 percent and clay 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 71 percent, fat clay (CH) 20 percent and clayey sand (SC) 9 percent |
| Average clay content about 40 inches down | 33 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 1 percent of the area |
The USDA survey does not map bedrock within the top five feet of La Paloma Addition, though deeper rock is not ruled out. Seasonal water within 40 inches is mapped across 1 percent, so pits may need pumping at a wet spot. We cannot rely on mapped flood prone soils for La Paloma Addition because none are mapped. High steel corrosion risk covers 1 percent, a reason to review casing and tracer wire materials; HDPE avoids that steel concern. The geologic map shows Beaumont Formation, areas predominantly sand, of Pleistocene age, and Delta Sand and Silt of Late Pleistocene age. Sand can cave behind the bit.
How do we bore La Paloma Addition through sandy clay loam?
Calallen sandy clay loam can hold a bore open while sticky clay builds on the reamer. We adjust the drilling plan for the soil along each La Paloma Addition route, including FM 2046 crossings.
- In Calallen sandy clay loam, we use a thinner drilling fluid with polymer and ream in stages to manage sticky cuttings.
- With clay mapped at about 40 inches in part of La Paloma Addition, we plan the pull so pipe is ready when the final ream opens the hole.
- Where the geologic map shows sand in the Beaumont Formation, staged reaming and a supporting fluid help keep the bore from caving behind the bit.
- At a La Paloma Addition spot with a shallow seasonal water table, we keep pits small and pump water as needed.

Which roads, tracks or drainage routes matter in La Paloma Addition near Private Road 84E?
A La Paloma Addition bore may pass beneath FM 2046, the state highway mapped inside the community, or nearby US 181, US 77 Business, US 77, Texas State Highway 188 and Texas State Highway 89. Private Road 84E is the longest named street, with 1.01 miles mapped inside the community; County Road 1272 has 0.63 miles and Sodville Road has 0.48 miles. Boring can leave pavement and driveways uncut, with entry and exit pits set in dirt beside the route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 2046 | State highway | 0.5 roadway miles inside | State highway office |
| US 181 | Highway nearby | 0.8 miles outside | State highway office |
| US 77 Business | Highway nearby | 1 miles outside | State highway office |
| US 77 | Highway nearby | 1 miles outside | State highway office |
| Texas State Highway 188 | Highway nearby | 1.1 miles outside | State highway office |
| Texas State Highway 89 | Highway nearby | 1.1 miles outside | State highway office |
| Union Pacific | Railroad nearby | 0.3 miles outside | The railroad |
Union Pacific track is 0.3 miles outside the mapped community boundary, and no railroad is mapped inside La Paloma Addition. No street and rail crossings are mapped inside the community, but a proposed track crossing would need the railroad owner’s agreement. No streams or lakes are mapped inside or within 1 mile; the community does have 1.0 mile of unnamed drainage. If a route reaches a water feature, its jurisdiction is checked during planning.
Whose permission does a La Paloma Addition bore need in San Patricio County?
La Paloma Addition has no city government, so street approval rests with the county or the state, depending on the route. For work in FM 2046 right of way, the line owner, not the driller, files through TxDOT’s RULIS system with the TxDOT Corpus Christi District; we prepare the bore plan and profile for that application. We follow TxDOT rules for La Paloma Addition highway work, which call for boring or tunneling beneath existing highway pavement. Electric and communication crossings need 60 inches of cover below the lowest crossed grade, and 48 inches along the right of way. A Union Pacific track crossing needs the railroad owner’s agreement. For a route on Private Road 84E, a Texas811 request is due at least 48 hours before digging, excluding weekends and legal holidays, and no earlier than 14 days before work; a later start or changed marks requires a new or refreshed request.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve La Paloma Addition in San Patricio County?
The water provider for a specific La Paloma Addition address must be confirmed with San Patricio County or the local water district before planning a bore. AEP Texas Central and San Patricio Electric Cooperative report electric service in the county, but the line owner at the job address must be identified before we plan an electric conduit route. That check matters on a Private Road 84E bore, where conduit specifications depend on the owner of the line being installed.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central and San Patricio Electric Cooperative | Electric utilities reporting service in San Patricio County | EIA Form 861 | Confirm the line owner by address |
Housing data is not published reliably for a place as small as La Paloma Addition, so we plan from the address and route rather than assumed building age. The county averages 31.8 inches of precipitation a year, with September averaging 5.1 inches and February 1.5 inches; rain can affect pit conditions. Before the drill approaches a marked line, we expose it with hydrovac because paint shows location, not depth. On a route beneath Sodville Road, that means potholing each marked utility along the bore path.

What is near La Paloma Addition, including Sinton?
La Paloma Addition is an unincorporated community in San Patricio County, at an elevation of 51 feet and with 0.7 square miles of land. Its ZIP code is 78387. Rancho Chico is 0.6 miles northeast, Loma Linda is 0.7 miles south, and Del Sol is 1.2 miles west. Sinton, the county seat and nearest larger city, is 1.4 miles north. From our Yukon, Oklahoma main office, the road distance is 570 miles and the drive is 11.1 hours, which affects crew mobilization for a La Paloma Addition job.
Places near La Paloma Addition
- Directional boring in Rancho Chico: 0.6 miles northeast
- Directional boring in Loma Linda: 0.7 miles south
- Directional boring in Del Sol: 1.2 miles west
- Directional boring in Sinton: 1.4 miles north
- Directional boring in Morgan Farm: 3.3 miles west
What boring work comes up in La Paloma Addition near County Road 1272?
- Highway crossing: A bore beneath FM 2046 can keep the existing pavement uncut, with the route and cover planned for TxDOT review.
- Street service: Water or sewer beneath Private Road 84E can use entry and exit pits beside the road instead of cutting its surface.
- Fiber conduit: A route along County Road 1272 needs marked utilities exposed before drilling near them.
- Electric conduit: On Sodville Road, we confirm the line owner before setting conduit specifications for the bore.
- Rail crossing: If a proposed La Paloma Addition route reaches Union Pacific track outside the mapped boundary, the railroad owner must agree to the crossing.
- Drainage route: A bore near the 1.0 mile of unnamed drainage in the community needs a route planned around the channel.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a La Paloma Addition job near Union Pacific?
For a La Paloma Addition quote, give us the street address or map pin, what line will go in the ground, its pipe or conduit size and the footage; a sketch or plans help us assess a route by FM 2046, Private Road 84E or another local street.
The 570 road mile trip from Yukon makes mobilization part of a La Paloma Addition estimate. Calallen sandy clay loam and the mapped clay share affect drilling and reaming choices. A route beneath FM 2046 brings highway permit and cover requirements into the plan, while nearby Union Pacific track can matter if the alignment reaches it. We also consider bore length, pipe size, marked utilities to expose, pavement, drainage crossings, pits, excavator time and sand backfill. High profile or emergency work changes the scope as well.
Questions people ask about boring in La Paloma Addition
Does Trinity take directional boring jobs in La Paloma Addition, San Patricio County?
Yes. Trinity Boring Solutions takes work in La Paloma Addition, and crews may come from our own team or a satellite yard run by a drilling partner we have vetted. Our Yukon office stays involved through the bore log, whether the route follows FM 2046 or a local street.
What does a La Paloma Addition bore beneath Union Pacific track require?
A proposed bore beneath Union Pacific track needs an agreement from the railroad that owns it. The track is mapped 0.3 miles outside La Paloma Addition’s community boundary, and no railroad is mapped inside it. The railroad agreement sets the crossing conditions for the proposed route.
Who owns electric lines in La Paloma Addition, San Patricio County, and who sets conduit specs?
AEP Texas Central and San Patricio Electric Cooperative report electric service in San Patricio County, but that does not identify the owner at every La Paloma Addition address. We confirm the specific line owner before planning conduit, including on a proposed route near FM 2046.
Does La Paloma Addition or San Patricio County control a cut on Sodville Road?
La Paloma Addition is unincorporated and has no city government, so a street approval is handled by the county or state authority responsible for that road. A bore beneath Sodville Road can avoid an open cut, with pits placed off the traveled surface where the site allows.
What is the Calallen soil like for boring in La Paloma Addition?
Calallen sandy clay loam is mapped across 71 percent of La Paloma Addition. At about 40 inches down, the USDA survey maps sandy clay loam across 80 percent and clay across 20 percent. Sticky clay can build on a reamer, so we plan staged reaming and fluid use for the actual route.
Will a bore in La Paloma Addition hit rock?
Bedrock is not mapped within the top five feet of La Paloma Addition, but that does not rule out deeper rock. The geologic map shows Pleistocene Beaumont Formation with areas predominantly sand, as well as Late Pleistocene Delta Sand and Silt. The map describes regional material, not the exact bore path.
How much notice does a La Paloma Addition bore near Private Road 84E need, and what if marks change?
For excavation near Private Road 84E, Texas811 needs the locate request at least 48 hours ahead, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If the start slips beyond that window, request again. Marks that move or wear off must be refreshed before work continues.
How far is La Paloma Addition from Yukon, and does nearby Sinton change mobilization?
La Paloma Addition is 570 road miles and an 11.1 hour drive from our Yukon, Oklahoma main office. Sinton is 1.4 miles north, but the longer trip from Yukon still affects crew mobilization. We account for the route and work scope near FM 2046 when planning the job.
What affects the price of a directional bore in La Paloma Addition near FM 2046?
The job details determine the estimate, not a single standard rate. At FM 2046, highway requirements may affect planning; Calallen soil affects drilling conditions, and the route’s length, pipe size, utility crossings, pavement, drainage, pits and equipment time also matter. Mobilization from Yukon is another part of a La Paloma Addition job.
Where the La Paloma Addition facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside La Paloma Addition
- U.S. Census Bureau, TIGER/Line 2024: La Paloma Addition boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: La Paloma Addition population count
- Macrostrat geologic map compilation: map units under La Paloma Addition
- U.S. Department of Transportation, North American Rail Network: track owners in San Patricio County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving San Patricio County
- U.S. Geological Survey, Elevation Point Query Service: La Paloma Addition elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to La Paloma Addition
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in La Paloma Addition
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in La Paloma Addition, Texas
Type the address of your job in La Paloma Addition. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for La Paloma Addition
Same county: Portland · Ingleside · Aransas Pass · Mathis · Taft · Odem · Gregory · Taft Southwest · Ingleside on the Bay · St. Paul · Lakeshore Gardens-Hidden Acres · Lake City. All counties: Texas county list.
