trinityboringsolutions.com

Rancho Chico Texas Directional Boring: Banquete Clay, FM 2046 and Union Pacific

Quick Answer: Rancho Chico is an unincorporated community in San Patricio County, so the county or state is responsible for its streets; we bore utility lines beneath FM 2046 and local roads using directional boring, also called horizontal directional drilling (HDD). From our Yukon, Oklahoma main office, Rancho Chico is 570 road miles away, and Railroad Avenue is one local route a project may involve. Banquete clay covers 51 percent of the mapped area and can cling to the reamer, so we plan fluid and reaming carefully. Union Pacific runs along or touches the mapped community boundary, which makes a possible track crossing a separate planning item.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Rancho Chico bores at a glance

  • Unincorporated community in San Patricio County, Texas. Population 387 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 570 miles, about 11.1 hours of driving.
  • Ground: Banquete soil is mapped on 51 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 2046. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can handle directional boring near FM 2046 in Rancho Chico?

Rancho Chico is an unincorporated community in San Patricio County, so street responsibility rests with the county or state rather than a city government. The Census Bureau counted 387 people in 2020; it does not publish yearly estimates for unincorporated places. Along FM 2046 and streets such as Railroad Avenue, we install water, sewer, gas, electric conduit and fiber lines by boring beneath the route.

Our main office is in Yukon, Oklahoma, and Rancho Chico work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short Railroad Avenue service connection or a longer FM 2046 route, our range runs from 3/4 inch service lines to 48 inch casing and from 10 feet to 5,000 feet. Trinity is a family business started in 1965, with directional boring work dating to 1982.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What does Banquete soil mean for a bore in Rancho Chico?

Rancho Chico ground is mostly Banquete soil, so clay behavior is a major bore planning factor. The USDA soil survey maps Banquete clay, 0 to 1 percent slopes, across 51 percent of the mapped community; Calallen sandy clay loam covers 26 percent and Orelia fine sandy loam 23 percent. At about 40 inches, the mapped texture is clay across 51 percent and sandy clay loam across 49 percent, with average clay content of 37 percent. These are mapped soil patterns, not test borings, so the route still needs field checks.

USDA soil survey, inside the Rancho Chico mapped community boundaryWhat is mapped
Soil series mappedBanquete 51 percent, Calallen 26 percent and Orelia 23 percent
Texture at the surfaceclay 51 percent, sandy clay loam 26 percent and fine sandy loam 23 percent
Texture about 40 inches downclay 51 percent and sandy clay loam 49 percent
Engineering class about 40 inches downfat clay (CH) 51 percent, lean clay (CL) 26 percent and clayey sand (SC) 23 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

The USDA mapping places no bedrock within the top five feet of Rancho Chico, which does not rule out deeper rock. Seasonal water tables, flood prone soils and high steel corrosion risk are not mapped here, so those conditions are not indicated by the survey for this route. The geologic map shows the Lissie Formation of Pleistocene age, with sand, silt and clay, and Delta Sand and Silt of Late Pleistocene age. The clay can stick to a reamer, while the mapped sand and silt mean ground may vary along a bore.

What does it take to bore through clay in Rancho Chico?

For a bore through Rancho Chico’s Banquete clay, we control fluid and reaming so sticky cuttings do not bind the tooling or grip the pipe. FM 2046 pavement also makes fluid pressure management important.

  1. On a route through Banquete clay, we use a thinner drilling fluid and polymer, then ream in stages to limit sticky cuttings collecting on the tooling.
  2. Because heavy clay covers 51 percent of the mapped area, we watch fluid returns near FM 2046 and keep pressure controlled to avoid lifting pavement.
  3. Before drilling near a marked line on Railroad Avenue, we hydrovac pothole it; paint shows its position but cannot establish its depth.
  4. As a bore advances near Private Road 84E, a walkover locator tracks the drill head from the surface while we record depth and pitch.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Which roads, tracks or creeks could a Rancho Chico bore cross near Private Road 84E?

FM 2046 is the state highway mapped inside Rancho Chico, with 0.3 roadway miles in the community; US 181 and Texas State Highway 188 are each 0.4 miles from the boundary, and Texas State Highway 89 is 0.8 miles away. Private Road 84E and Villarreal Street are the longest named streets at 1.01 miles each, followed by Railroad Avenue at 0.75 miles. A route on these roads needs a site specific plan for pavement, driveway access and the position of existing lines.

CrossingTypeMapped extentWho has a say
FM 2046State highway0.3 roadway miles insideState highway office
US 181Highway nearby0.4 miles outsideState highway office
Texas State Highway 188Highway nearby0.4 miles outsideState highway office
Texas State Highway 89Highway nearby0.8 miles outsideState highway office
Union PacificRailroad nearby0 miles outsideThe railroad
Swipe the table sideways to see every column.

Union Pacific track runs along or touches the Rancho Chico boundary, but no railroad lies inside the mapped community and no street and rail crossing is mapped there. Any proposed track crossing needs coordination with Union Pacific for its crossing agreement. No streams are mapped inside or within one mile of Rancho Chico, and no lakes or ponds are mapped within one mile. The mapped community also has no drainage channel miles, so no local stream crossing is identified for planning.

Whose permission does a bore in Rancho Chico, San Patricio County need?

Rancho Chico has no city government, so work on a county road is handled at the county level, while FM 2046 and the nearby US and state highways fall under TxDOT. The TxDOT Corpus Christi District reviews a utility permit for work in FM 2046 right of way. The utility owner, not Trinity, files through TxDOT’s RULIS system; we prepare the bore plan and profile for that owner’s application. Existing highway pavement is crossed by boring or tunneling, and a proposed Union Pacific track crossing requires an agreement with the railroad. No stream crossing is mapped in Rancho Chico.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve addresses in San Patricio County near Rancho Chico?

EPA drinking water records do not tie a water system to Rancho Chico, so the provider for a specific address must be confirmed with San Patricio County or the local water district before planning a bore. AEP Texas Central and San Patricio Electric Cooperative report electric service in San Patricio County, but the line owner at the Rancho Chico address must be confirmed before an electric conduit bore.

Line ownerWhat it isSourceSize
AEP Texas Central and San Patricio Electric CooperativeElectric utilities reporting service in San Patricio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published for a place as small as Rancho Chico, so the age of buried lines along Private Road 84E or Railroad Avenue cannot be inferred from a local housing estimate. The county averages 31.8 inches of precipitation a year, with September averaging 5.1 inches and February 1.5 inches. For a crossing on either street, we expose each marked utility with hydrovac before drilling near it; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near Rancho Chico and La Paloma Addition?

Rancho Chico is in San Patricio County, covers 0.51 square miles and sits at an elevation of 50 feet. ZIP code 78387 serves the community. La Paloma Addition is 0.6 miles southwest, while Sinton, the county seat and nearest larger city, is 0.9 miles north. Loma Linda is 1.2 miles south, Del Sol is 1.6 miles southwest and Morgan Farm is 3.7 miles west. The Yukon yard is 570 road miles away, a drive of 11.1 hours, which affects mobilization for work near Sinton.

Places near Rancho Chico

What would we bore near Railroad Avenue in Rancho Chico?

  • Highway crossing: A bore beneath FM 2046 can keep the existing roadway uncut, with the utility owner arranging the TxDOT right of way permit.
  • Water service: A service bore along Private Road 84E needs the address specific water provider confirmed before the route is planned.
  • Fiber route: A fiber conduit under Railroad Avenue can avoid opening the street, with marked lines exposed before drilling near them.
  • Electric conduit: A conduit route near Villarreal Street starts with confirmation of whether AEP Texas Central or San Patricio Electric Cooperative owns the line.
  • Rail crossing: A proposed bore at the Union Pacific boundary needs railroad coordination for a crossing agreement before the track route is set.
  • Service connection: A bore beside 5th Street can carry a water, sewer or gas service while keeping the street surface intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Rancho Chico quote near Union Pacific?

A map pin matters near Rancho Chico because a route on FM 2046 differs from one near the Union Pacific boundary. For a Rancho Chico bore, send us the address or pin, what goes underground, pipe or conduit size, and footage. A sketch or plans showing the proposed path and nearby crossings help us review a Railroad Avenue or Private Road 84E job.

The 570 road miles from Yukon affect mobilization for a Rancho Chico job. Banquete clay can change fluid and reaming needs, while a crossing near FM 2046 may involve pavement and a TxDOT permit. We also consider bore length, pipe or conduit size, utilities that must be exposed, pits, excavator time, sand backfill and any Union Pacific coordination. A creek crossing is not mapped in Rancho Chico, but the exact route still determines the work involved.

Questions people ask about boring in Rancho Chico

Does Trinity take directional boring jobs in Rancho Chico, San Patricio County?

Yes, we take directional boring work in Rancho Chico, San Patricio County. Our Yukon office coordinates the work with our own crews and satellite yards operated by partner drilling contractors we have vetted. The customer deals with Trinity from the first call through the bore log, whether the work is near FM 2046 or Railroad Avenue.

Who owns electric lines in Rancho Chico, San Patricio County, and who confirms conduit specs?

AEP Texas Central and San Patricio Electric Cooperative report electric service in San Patricio County, but that does not identify the line owner at every Rancho Chico address. We confirm the owner for a proposed conduit route, such as one near Villarreal Street, before planning the bore and confirming the conduit requirements.

Who is responsible for Railroad Avenue in Rancho Chico, and does a bore cut the street?

Rancho Chico has no city government, so the county or state is responsible for its streets and highways. A bore below Railroad Avenue can avoid cutting the pavement; the route and any right of way work still need to be reviewed with the responsible authority. Before drilling near Texas811 marks in Rancho Chico, we expose the marked utilities.

What ground should I expect for a bore through Banquete soil in Rancho Chico?

The USDA soil survey maps Banquete clay over 51 percent of Rancho Chico, with clay also mapped across 51 percent at about 40 inches. Sticky clay can collect on a reamer and grip pipe, so staged reaming and controlled fluid help manage the ground. These mapped patterns are not test borings.

Will a bore in Rancho Chico hit rock below the mapped soil?

We plan Rancho Chico bores with the mapped bedrock limit in mind: none is mapped in the top five feet, though deeper rock may exist. The geologic map identifies the Lissie Formation and Delta Sand and Silt, both with sand, silt and clay materials. A route near FM 2046 still needs field conditions checked.

Who approves a bore under FM 2046 in Rancho Chico, and which TxDOT office reviews it?

Work in the FM 2046 right of way needs a TxDOT utility permit reviewed by the TxDOT Corpus Christi District. The utility owner submits the application through RULIS, and Trinity supplies the bore plan and profile for it. Existing highway pavement is crossed by boring or tunneling.

How far is Rancho Chico from the Yukon office, and does Sinton affect the job?

Rancho Chico is 570 road miles and a 11.1 hour drive from the Yukon main office; Sinton is only 0.9 miles north of the community. That distance can affect mobilization, while the exact route near Sinton determines the ground, utility exposure and crossings involved.

How much 811 notice is needed for a bore near Private Road 84E in Rancho Chico?

For a bore near Private Road 84E, Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the notice, make a new request. If marks wear or move, we refresh them through Texas811 before continuing work in Rancho Chico.

What affects the price of directional boring near FM 2046 in Rancho Chico?

The route and scope determine the price, including length, pipe or conduit size, Banquete clay, utility crossings, pavement and pits. A job in FM 2046 right of way also involves TxDOT permit planning, while a proposed Union Pacific crossing adds railroad coordination. Mobilization from the Yukon office is another consideration for Rancho Chico.

Where the Rancho Chico facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Rancho Chico

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Rancho Chico, Texas

Type the address of your job in Rancho Chico. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Rancho Chico

Same county: Portland · Ingleside · Aransas Pass · Mathis · Taft · Odem · Gregory · Taft Southwest · Ingleside on the Bay · St. Paul · Lakeshore Gardens-Hidden Acres · Lake City. All counties: Texas county list.