trinityboringsolutions.com

Redford Texas Directional Boring: Corazones Soil, FM 170 and Río Grande

Quick Answer: Redford is 696 road miles from our Yukon yard, and FM 170 work is staffed by our crews or vetted partner contractors. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for routes that cross the Río Grande in Redford, Texas. Corazones soil covers 43 percent of the mapped area, and gravelly ground can cave behind the drill head. Staged reaming and having the pipe ready help keep a bore moving through that ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Redford bores at a glance

  • Unincorporated community in Presidio County, Texas. Population 43 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 696 miles, about 13.8 hours of driving.
  • Ground: Corazones soil is mapped on 43 percent of the area, with extremely gravelly loamy coarse sand about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 7 percent of the area.
  • Highways inside the boundary: FM 170. State permit office: TxDOT El Paso District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Río Grande.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near the Río Grande in Redford?

Trinity Boring Solutions takes directional boring work in Redford, Presidio County, 696 road miles from Yukon, with our own crews and vetted partner drilling contractors handling the work. The 2020 Census counted 43 people in this unincorporated community. We can route water, sewer, gas, electric conduit or fiber along streets such as El Polvo Road or toward a Río Grande crossing.

Our main office is in Yukon, Oklahoma, and Redford work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have provided directional boring since 1982, and our family business dates to 1965; FM 170 helps frame local crossing plans. For routes near FM 170 or the Río Grande, we handle lines from 3/4 inch service lines through 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does Corazones soil mean for a bore in Redford?

Corazones is the leading mapped soil series in Redford, covering 43 percent of the community. The USDA soil survey maps extremely gravelly loamy coarse sand at about 40 inches in 26 percent of the area, while 43 percent is mapped as sandy at that depth. We treat mapped Corazones soil patterns as survey guidance, not test borings, and verify subsurface conditions before setting a boring plan. Gravelly ground can cut easily but may fall in behind the bit, so the bore plan needs staged reaming and drilling fluid to support the hole.

USDA soil survey, inside the Redford mapped community boundaryWhat is mapped
Soil series mappedCorazones 43 percent, Riverwash (miscellaneous area) 23 percent, Vicente 16 percent, Castolon 8 percent and Redford 4 percent
Texture at the surfacegravelly sandy loam 26 percent, very gravelly fine sandy loam 16 percent and loam 16 percent
Texture about 40 inches downextremely gravelly loamy coarse sand 26 percent, very gravelly fine sandy loam 16 percent and stratified loam to silt loam to clay loam 16 percent
Engineering class about 40 inches downgraded gravel with silt (GW GM) 26 percent, lean clay (CL) 24 percent and clayey gravel (GC) 16 percent
Average clay content about 40 inches down13 percent
Bedrock mapped within 60 inches7 percent of the area (7 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils49 percent of the area
High corrosion risk for uncoated steel18 percent of the area

Bedrock is mapped within 60 inches in 7 percent of Redford, with a typical mapped depth of 13 inches, so the route may need to account for shallow rock. A seasonal water table is not mapped, while flood prone soils cover 49 percent of the area near the Río Grande. High steel corrosion risk is mapped in 18 percent. The Pleistocene Quaternary Tertiary bolson deposits include clay, silt, sandstone and conglomerate, so conditions can change along a bore.

What does it take to bore Redford’s extremely gravelly loamy coarse sand?

The USDA soil survey maps extremely gravelly loamy coarse sand at about 40 inches in parts of Redford. Gravel can let the hole cave, so we plan the reaming sequence and pipe setup around that ground.

  1. Corazones soil is common in Redford, and gravelly layers can cave behind the bit, so we use staged reaming and have the pipe ready before the final pass.
  2. The USDA survey maps extremely gravelly loamy coarse sand at about 40 inches in parts of Redford, so we track depth and pitch as gravel shifts the drill head.
  3. Before drilling near a marked line, we hydrovac pothole it; paint on El Polvo Road shows a line’s position, not how deep it sits.
  4. Flood prone soils cover 49 percent of Redford, so a bore planned near the Río Grande needs channel depth and pit placement considered.
6 inch PVC sleeve coming out of the bore pit wall in red sandy soil with the Trinity water trailer behind, northeast Oklahoma City
A 6 inch PVC sleeve coming out of the bore pit wall in red sandy soil in northeast Oklahoma City.

What is in the way of a new line near FM 170 in Redford?

FM 170 runs 7.7 roadway miles inside Redford’s mapped community boundary, so a route in its right of way needs TxDOT review. El Polvo Road is the longest named street at 0.93 miles, followed by Water Tower Road at 0.66 miles and Cemetary Road at 0.61 miles. Cemetery Road and River Crossing A Road are also mapped streets. A bore can pass beneath pavement without cutting it, but the route and work area still need to fit the road and utility locations.

CrossingTypeMapped extentWho has a say
FM 170State highway7.7 roadway miles insideState highway office
Río GrandeStream10.81 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Redford or within one mile outside the community boundary, so there is no mapped track route to plan around. The Río Grande runs for 10.81 channel miles inside the boundary, but no mapped street crossing of a named stream is recorded. We see no mapped lakes or ponds within one mile of Redford, while the Río Grande is a distinct crossing consideration for boring plans. A planned river crossing still needs ground and jurisdiction review before the bore path is set.

Who approves a bore on Redford roads in Presidio County?

Redford is an unincorporated community, so it has no city government; county roads fall to the county, while FM 170 is handled by the state. For work in the FM 170 right of way, the utility owner, not the driller, files through TxDOT’s RULIS system, and the TxDOT El Paso District reviews it. We prepare the bore plan and profile for the owner’s application and work under its permit. A river route at the Río Grande is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the utility lines in Presidio County near Redford?

The water provider for a specific Redford address has to be confirmed with the county or local water district before a bore is planned; EPA drinking water records do not identify a system tied to the community. AEP Texas North and Rio Grande Electric Cooperative report electric service in Presidio County, but that does not establish which company owns a line at a particular address. We confirm the line owner before laying out an electric conduit bore near FM 170.

Line ownerWhat it isSourceSize
AEP Texas North and Rio Grande Electric CooperativeElectric utilities reporting service in Presidio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Redford’s median housing year at 1972, with all housing units built from 1960 to 1999. That does not date the buried lines on Water Tower Road, but it makes checking an existing route worthwhile when planning replacement service. We hydrovac pothole each marked utility on the bore path before drilling near it; a line beneath El Polvo Road is one example of a location to expose first.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Redford from Terlingua and our Yukon yard?

Redford is in Presidio County in far West Texas, at an elevation of 2,644 feet and across 7.43 square miles of mapped community area. The ZIP code is 79846. Presidio is 14.3 miles northwest, Terlingua is 37.2 miles east, and Study Butte is 38.8 miles east. Marfa, the county seat, is 61.3 miles north. The Yukon yard is 696 road miles away, a 13.8 hour drive, so that distance can affect mobilization for work near FM 170.

Places near Redford

Which jobs call for a bore near El Polvo Road in Redford?

  • Highway crossing: A new line beneath FM 170 needs a bore plan for the highway right of way and a route beneath the travel lanes.
  • Water service: A service near Water Tower Road can use a bore to avoid opening the street pavement.
  • Fiber route: Fiber near El Polvo Road can run in conduit, with marked utilities exposed before the drill approaches.
  • River crossing: A route beneath the Río Grande needs channel conditions and federal jurisdiction checked during planning.
  • Drainage crossing: With 49 percent of Redford mapped as flood prone soils, a route near River Crossing A Road needs careful pit placement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Redford bore quote near Cemetery Road?

For a Cemetery Road quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us lay out the route. Tell us if the line needs to cross FM 170 or reach a Río Grande bank, since those details can change the bore plan.

The price follows the work at the specific Redford address. Corazones gravelly ground can affect drilling and reaming, while a crossing of FM 170 adds a highway permit and cover requirements. The Río Grande or a drainage crossing can change access and pit planning. Pipe size, total length, utilities to expose, pavement, pit and excavator needs, backfill, emergency timing and mobilization from Yukon all factor into the estimate.

Questions people ask about boring in Redford

Does Trinity Boring Solutions take Redford jobs in Presidio County, and who staffs them?

Yes, we take directional boring work in Redford, Presidio County. Our own crews and partner contractors Trinity has vetted handle the field work, while you deal with Trinity through the bore log. The 2020 Census counted 43 people in Redford, and routes can include service lines near FM 170.

Can a line be bored beneath the Río Grande at Redford?

A bore beneath the Río Grande can be considered, but the channel and route need to be reviewed before setting the plan. The river runs 10.81 channel miles inside Redford’s mapped boundary. We check US Army Corps of Engineers jurisdiction during planning for any proposed Río Grande crossing in Redford before setting the boring approach.

Who owns electric lines in Redford, Presidio County, and who confirms conduit specs?

AEP Texas North and Rio Grande Electric Cooperative report electric service in Presidio County, but neither should be assumed to own the line at every Redford address. Confirm the owner for the specific route before settling conduit specifications. That check matters for a bore near El Polvo Road as well as for a longer route.

Does the county control Cemetary Road in Redford, and does a bore cut it?

Redford has no city government, so its local streets are not controlled by a city; county responsibility applies to county roads. Cemetary Road is mapped for 0.61 miles inside the community. A directional bore can pass under the street without cutting its surface, with pits placed off the paved route.

How old are Redford homes and buried lines near Water Tower Road?

The American Community Survey 2019 to 2023 estimates give Redford a median housing year of 1972, and place all housing units in the 1960 to 1999 period. That does not show the age of buried lines near Water Tower Road. For a replacement bore, we expose marked utilities before the drill approaches.

Could groundwater or flood prone soil affect Redford bore pits near the Río Grande?

A seasonal water table is not mapped in Redford, but flood prone soils cover 49 percent of the area, and the Río Grande crosses the community. Those mapped conditions call for checking the actual route and keeping pits out of areas that could be affected by the channel.

How far is Redford from Trinity’s Yukon, Oklahoma main office, and does it affect the job?

Redford is 696 road miles and a 13.8 hour drive from our Yukon yard. That distance can affect mobilization, particularly for a job that needs equipment and crew time near FM 170. The route, pipe size and ground still determine the work plan.

How much notice does Texas811 need for a Redford bore along El Polvo Road?

For a bore along El Polvo Road, request locates at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. When a Redford start slips more than 14 days past the original notice, we submit a new request through the TxDOT El Paso District. Worn or moved marks must be refreshed through Texas811.

What affects the cost of a directional bore in Redford near FM 170?

The job details set the estimate, not just the length. Corazones gravelly ground, pipe size, utility exposures, pavement and pit work all matter. A crossing in the FM 170 right of way adds permit planning, while distance from Yukon affects mobilization. A Río Grande or drainage crossing can also change access and the bore setup.

Where the Redford facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Redford

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Redford, Texas

Type the address of your job in Redford. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Redford

Same county: Marfa. All counties: Texas county list.