Taylor Texas Directional Boring: Branyon Clay, Union Pacific, Mustang Creek
Quick Answer: Taylor is an incorporated city, so city streets such as 2nd Street belong to the city; we do directional boring, also called horizontal directional drilling (HDD), in Texas for crossings like Mustang Creek. Taylor is 375 road miles from our Yukon, Oklahoma main office, and Union Pacific tracks are among the local route constraints. The USDA soil survey maps clay across 92 percent of Taylor, where sticky ground can grip pipe. Around Taylor, staged reaming and a same day pull help manage that clay.
Taylor bores at a glance
- Incorporated city in Williamson County, Texas. Population 17,872 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 375 miles, about 7.4 hours of driving.
- Ground: Branyon soil is mapped on 38 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 7 percent of the area.
- Highways inside the boundary: US 79, US 79 Business, Texas State Highway 95, FM 397 and FM 619. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: Union Pacific, with 26 mapped street and rail crossings.
- Named streams inside the boundary: Mustang Creek, Bull Branch, North Fork Mustang Creek and Turkey Creek.
- Public water: City of Taylor, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Union Pacific in Taylor?
As an incorporated city, Taylor controls its local streets, including 2nd Street. Trinity Boring Solutions takes directional boring work in Williamson County, where the Census Bureau Vintage 2024 estimate puts the population at 17,872. We install water, sewer, gas, electric conduit and fiber for routes along streets such as 4th Street or beneath roads and tracks where the route requires it.
Our main office is in Yukon, Oklahoma, and Taylor work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982, so four decades of practice inform how we approach Taylor’s mapped Branyon and Burleson clay, which can cling to tooling and grip pipe.

What is Branyon soil like to bore through in Taylor?
Taylor’s mapped Branyon soil and Burleson clay make the ground a sticky bore rather than a sandy one. The USDA soil survey lists Branyon series across 38 percent of the city and Burleson across 26 percent. At about 40 inches below the surface, clay is mapped across 92 percent and silty clay across 5 percent; the survey also maps the soil as CH across 97 percent at that depth. These are mapped soil patterns, not test borings, so the route still needs site specific planning.
| USDA soil survey, inside the Taylor city limits | What is mapped |
|---|---|
| Soil series mapped | Branyon 38 percent, Burleson 26 percent, Heiden 11 percent, Ferris 7 percent and Tinn 7 percent |
| Texture at the surface | clay 92 percent and silty clay 5 percent |
| Texture about 40 inches down | clay 92 percent and silty clay 5 percent |
| Engineering class about 40 inches down | fat clay (CH) 97 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 7 percent of the area (0 percent hard rock, 7 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 98 percent of the area |
The survey maps weathered bedrock within 60 inches in 7 percent of Taylor, with no hard bedrock mapped within that depth; bedrock is not mapped within 40 inches. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 7 percent. High steel corrosion risk is mapped across 98 percent, so the line owner should consider steel casing and tracer wire materials; HDPE is not subject to that soil corrosion concern. The Navarro Group and Marlbrook Marl, undivided, is mapped here as Maastrichtian age clay and marl, which supports planning for sticky ground rather than assuming open, sandy cuts.
How do we drill Taylor’s clay ground?
For Taylor’s clay, we adjust the fluid and reaming sequence to control sticky cuttings and avoid loading pavement with excess pressure. Along 4th Street or near Mustang Creek, the route and surface conditions shape each pass.
- Taylor’s heavy clay can ball on the reamer, so we use a thinner fluid with polymer and widen the bore in stages.
- Where Taylor clay could swell around the line, we plan the pull for the same day the hole is opened.
- Near US 79 pavement, we watch fluid returns and keep pressure controlled so the ground does not lift the roadway.
- Along Mustang Creek, we plan depth beneath the channel and check jurisdiction during crossing planning.

What could a new line cross in Taylor near Mustang Creek?
Taylor routes may meet US 79, US 79 Business, Texas State Highway 95, FM 397, FM 619, FM 112, FM 427, FM 973 or FM 3349; Texas State Highway 29 lies 1.3 miles outside the limits. The longest named streets include Carlos G Parker Boulevard at 10.0 miles, 4th Street at 9.13 miles and 2nd Street at 5.85 miles inside the city. Those road and street choices affect access, pavement exposure and where a bore can place its entry and exit pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 79 | US highway | 11.3 roadway miles inside | State highway office |
| US 79 Business | US highway | 4.8 roadway miles inside | State highway office |
| Texas State Highway 95 | State highway | 9 roadway miles inside | State highway office |
| FM 397 | State highway | 3.9 roadway miles inside | State highway office |
| FM 619 | State highway | 2.7 roadway miles inside | State highway office |
| FM 112 | State highway | 2.4 roadway miles inside | State highway office |
| FM 427 | State highway | 2.1 roadway miles inside | State highway office |
| FM 973 | State highway | 1.8 roadway miles inside | State highway office |
| FM 3349 | State highway | 1.1 roadway miles inside | State highway office |
| Texas State Highway 29 | Highway nearby | 1.3 miles outside | State highway office |
| Union Pacific | Railroad | 18.34 track miles inside | The railroad |
| Mustang Creek | Stream | 6.54 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Bull Branch | Stream | 4.32 channel miles inside | Checked for Corps of Engineers jurisdiction |
| North Fork Mustang Creek | Stream | 1.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 18.34 track miles in Taylor on its Austin and Waco Subdivisions, and public records map 26 street and rail crossings in the city. A route beneath its track needs an agreement with the railroad owner that sets crossing conditions. Mustang Creek runs 6.54 channel miles here; 28 street crossings of named streams are mapped across Taylor. Railroad Lake and City Lake are each mapped at 9 acres, so a water route needs review during planning.
Who approves a Taylor bore near Williamson County roads?
For work in a TxDOT right of way along US 79, Texas State Highway 95 or a farm to market road in Taylor, TxDOT’s Austin District reviews the utility permit. The utility that owns the line submits the application through RULIS; we prepare the bore plan and profile for that filing and work under the owner’s permit. Taylor’s local streets are controlled by the city. A Union Pacific track crossing needs an agreement from the railroad owner, and a crossing at Mustang Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near City of Taylor lines?
The City of Taylor public water system uses purchased surface water and reports 7,475 service connections serving 20,622 people. For an electric conduit bore along Carlos G Parker Boulevard, we confirm the line owner before planning the route. Utilities reporting electric service in Williamson County include Oncor Electric Delivery Company, Austin Energy, City of Georgetown, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative; that list does not identify the provider at every Taylor address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Taylor | Public water system | Surface water bought from another system | 7,475 connections, 20,622 people served |
| Oncor Electric Delivery Company, Austin Energy, City of Georgetown, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Williamson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Taylor’s median housing year at 1978; 29 percent of housing was built before 1960, 49 percent from 1960 to 1999 and 22 percent in 2000 or later. A replacement bore near 2nd Street may need to work around older buried lines, while newer sections may call for service extensions. We hydrovac pothole marked utilities on the bore path before drilling near them; on these streets, paint shows position, not depth.

Do you cover Taylor and nearby Thrall?
Taylor is in Williamson County at an elevation of 581 feet and covers 22.64 square miles. Its ZIP code is 76574. Hutto is 7.1 miles west, Thrall is 8.0 miles east, Coupland is 8.3 miles south, Granger is 10.1 miles north and Weir is 12.0 miles northwest. Georgetown, the county seat, is 17.3 miles northwest; Hutto is the nearest larger city listed. Taylor is 375 road miles and a 7.4 hour drive from our Yukon, Oklahoma main office, which affects mobilization for work near Thrall or within Taylor.
Places near Taylor
- Directional boring in Hutto: 7.1 miles west
- Directional boring in Thrall: 8 miles east
- Directional boring in Coupland: 8.3 miles south
- Directional boring in Granger: 10.1 miles north
- Directional boring in Weir: 12 miles northwest
Which jobs call for a bore along Carlos G Parker Boulevard in Taylor?
- Highway crossing: A bore beneath US 79 or Texas State Highway 95 can keep the roadway surface uncut, with the route planned for its right of way.
- Water service: A connection near the City of Taylor system may need a route that works around existing service lines along 2nd Street.
- Fiber conduit: Carlos G Parker Boulevard gives a long street corridor where potholing can locate buried lines before the drill approaches.
- Creek crossing: A route under Mustang Creek needs depth planning beneath the channel and a jurisdiction check during planning.
- Rail crossing: A bore beneath Union Pacific track needs the railroad owner’s agreement and its crossing conditions.
- Drainage crossing: Taylor’s mapped unnamed drainage and Bull Branch can affect where pits fit and how a route avoids open cuts.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Taylor bore near US 79?
For a Taylor quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help us see the route near US 79 or 4th Street. Mark any creek, track or pavement crossings on the plan. That lets us assess the entry and exit pits and the route before setting the work scope.
A short, direct route through Branyon clay with few exposed utilities is simpler to plan than a bore crossing US 79, Union Pacific track or Mustang Creek. Length, pipe or conduit size, soil and rock, utility crossings, pavement, pits, excavator time and sand backfill all affect the work. Creek crossings and drainage can change the route plan, while mobilization reflects Taylor’s 375 road miles from Yukon. The route and its conditions, not one local feature alone, determine the price.
Questions people ask about boring in Taylor
Does Trinity take directional boring jobs in Taylor and Williamson County, and who staffs them?
Yes, we take directional boring jobs in Taylor and across Williamson County. Our crews handle the work, with partner contractor satellite yards supporting jobs when needed. You work with Trinity from the first call through the bore log, whether the crew is working near Mustang Creek or elsewhere in Taylor.
Who controls 2nd Street in Taylor, and can a bore avoid cutting it?
Taylor’s city streets, including 2nd Street, are controlled by the city. Directional boring can pass below pavement without an open cut when the route and access allow it. The entry and exit pits still need suitable locations, and existing lines along 2nd Street must be located and exposed before drilling near them.
What do older homes near 4th Street in Taylor mean for replacement bores?
Older housing near 4th Street can mean a replacement route must account for existing buried services. The American Community Survey 2019 to 2023 five year estimates put Taylor’s median housing year at 1978, with 29 percent of homes built before 1960. We pothole marked lines on the route before drilling near them.
Does Branyon soil in Taylor corrode steel, and what pipe can be used?
Taylor’s mapped soils show high steel corrosion risk across 98 percent of the area. The line owner should consider casing and tracer wire materials for a route through Branyon soil. HDPE is not subject to that soil corrosion concern; the appropriate line and material depend on the job.
What ground does a bore pass through in Branyon soil around Taylor?
The USDA soil survey maps Branyon series across 38 percent of Taylor, and clay across 92 percent at about 40 inches below the surface. That depth is mapped as CH across 97 percent of the city. These are soil survey patterns, not test borings, so the route still needs site specific planning.
Is rock mapped within five feet of a bore route in Taylor?
Weathered bedrock is mapped within 60 inches in 7 percent of Taylor, and no hard bedrock is mapped within that depth. Bedrock is not mapped within 40 inches. The mapped Navarro Group and Marlbrook Marl, undivided, is Maastrichtian age clay and marl, so site conditions still need consideration along the route.
Can I reach Trinity after hours about an urgent bore near 2nd Street in Taylor?
Yes, a person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent job near 2nd Street, we can discuss the line, access and crossing conditions before planning the response. Trinity also provides 24 hour emergency response for work in Texas.
How far ahead should I request utility marks for Carlos G Parker Boulevard in Taylor?
For a bore near Carlos G Parker Boulevard, Texas law requires the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring near US 79 in Taylor?
The job scope determines the price near US 79: length, pipe or conduit size, Taylor’s clay, utility crossings, pavement, creek crossings, pits and excavator time all matter. A route under Union Pacific track adds railroad coordination, and mobilization reflects the 375 road miles from Yukon. High profile or emergency work can also change the scope.
Where the Taylor facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Taylor
- U.S. Census Bureau, TIGER/Line 2024: Taylor boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Taylor
- U.S. Census Bureau, American Community Survey 2019 to 2023: Taylor housing units and year built
- Macrostrat geologic map compilation: map units under Taylor
- U.S. EPA Safe Drinking Water Information System: public water systems serving Taylor
- U.S. Department of Transportation, North American Rail Network: track owners in Williamson County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Williamson County
- U.S. Geological Survey, Elevation Point Query Service: Taylor elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Taylor
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Taylor
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Taylor, Texas
Type the address of your job in Taylor. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Taylor
Same county: Round Rock · Georgetown · Leander · Cedar Park · Austin · Brushy Creek · Liberty Hill · Jarrell · Serenada · Florence · Bartlett · Santa Rita Ranch. All counties: Texas county list.
