Directional Boring Contractors in Cherokee County, TX
Trinity Boring Solutions is a directional boring contractor serving Cherokee County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Jacksonville, Rusk, Alto, New Summerfield, Wells and Gallatin. From the Trinity main office in Yukon, Oklahoma it is about 352 road miles southeast to Rusk, the county seat. The usual crossings in Cherokee County are US 69 and US 79, the Neches River and Union Pacific track. Call (405) 409-7423 any time.
Free Bore Planner
Plan Your Bore in Cherokee County, Texas
Type the address of your job in Cherokee County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
What Should You Know Before Boring in Cherokee County?
Cherokee County covers 1,053 square miles, has about 53,223 residents and sits in the TxDOT Tyler District.
| County seat | Rusk |
|---|---|
| Population | 53,223 (2024 Census estimate), up 5.3% since 2020 |
| Land area | 1,053 square miles |
| Largest cities and towns | Jacksonville (14,639), Rusk (5,553), Alto (1,064), New Summerfield (906) and Wells (903) |
| TxDOT district | TxDOT Tyler District |
| 811 center | Texas811 (call 811), two working days of notice |
| Electric utilities | Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative |
| Interstate and US highways | US 69, US 79, US 84 and US 175 |
| State Highways | 21, 110, 135, 204 and 294 |
| State loops and spurs | Loop 456 and Loop 62 |
| Rivers | Neches River and Angelina River |
| Creeks and other streams | Mud Creek, Larrison Creek, Bowles Creek, Box Creek, Tails Creek, Beans Creek, Caney Creek and Sandy Creek |
| Lakes | Lake Palestine, Lake Striker, Lake Jacksonville and Duren Lake |
| Railroads | Union Pacific and short line railroads, about 43 main line miles |
| Average precipitation | 47.7 inches a year (1991 to 2020) |
| New housing units permitted | 43 in 2025 |
| Road distance from Trinity main office | About 352 miles from Yukon, Oklahoma to Rusk |
| Trinity insurance | General liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability |
Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.
What Does a Bore Have to Cross in Cherokee County?
A bore in Cherokee County most often has to cross a highway such as US 69, US 79 or US 84, a stream such as the Neches River, the Angelina River or Mud Creek and Union Pacific track. State Highways 21, 110, 135, 204 and 294 also run through the county, along with Loop 456 and Loop 62. The Census map names 25 larger streams in Cherokee County, led by the Neches River, the Angelina River, Mud Creek, Larrison Creek, Bowles Creek and Box Creek. The rest are Tails Creek, Beans Creek, Caney Creek, Sandy Creek, Turkey Creek, Cooke Creek, Sulphur Creek, Bridge Creek, White Oak Creek, One Arm Creek, Beaver Creek, Flat Creek, Keys Creek, Bull Creek, Horse Creek, Cedar Creek, Bear Creek, Devils Bayou and Turnpike Creek. Lake Palestine, Lake Striker, Lake Jacksonville and Duren Lake are the main mapped lakes. The federal rail map shows about 43 miles of main line track in Cherokee County: Union Pacific about 29 miles and short line and other operators about 14.

What Is the Ground Like for Directional Boring in Cherokee County?
Sand is the main thing to plan for in Cherokee County: the federal soil survey records sandy layers in the top five feet on about 44 percent of the county, with fine sandy loam the most common surface soil. A bore through sand in Cherokee County is kept full of drilling fluid so the hole stands until pullback. May is the wettest month in Cherokee County at 4.6 inches on average and July the driest at 2.9. Cherokee County averages 47.7 inches of precipitation a year, so wet weather and water in the pits are planned for.
- Most common soils: Sacul (14%), Bowie (9%) and Nacogdoches (8%).
- Surface texture: most often fine sandy loam (52%) or loamy fine sand (23%).
- Bedrock within 5 feet: about 15% of the county. Most of it is soft, weathered rock.
- Clay rich layer (35% clay or more) in the top 5 feet: about 46% of the county.
- Sandy layer (70% sand or more) in the top 5 feet: about 44% of the county.
- Seasonal water table within 5 feet: about 40% of the county.
Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Cherokee County, Texas (survey area TX073, version 25, September 3, 2026), through Web Soil Survey. Percentages are shares of mapped county area.
Who Permits a Bore in Cherokee County?
The TxDOT Tyler District permits bores under state highways in Cherokee County, the Cherokee County Commissioners Court handles county roads, and Jacksonville, Rusk and Alto each handle their own streets.
- State highways. US 69, US 79, US 84, the other numbered state routes and the farm to market roads in Cherokee County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
- Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
- Railroads. A bore under Union Pacific or short line track in Cherokee County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
- Water crossings. A bore under the Neches River, the Angelina River, Mud Creek or Lake Palestine is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.
Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.
Which Electric Utilities Serve Cherokee County?
Oncor Electric Delivery Company, Cherokee County Electric Cooperative Association and Houston County Electric Cooperative serve Cherokee County, according to 2025 filings with the U.S. Energy Information Administration. Oncor Electric Delivery Company is an investor owned utility; Cherokee County Electric Cooperative Association and Houston County Electric Cooperative are member owned cooperatives. Conduit bored in Cherokee County is built to the standard of whichever of them owns the line. More on electric line boring for electric cooperatives.
How Much New Construction Is There in Cherokee County?
Cherokee County permitted 43 new housing units in 2025, 37 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Cherokee County went from 50,529 in 2020 to 53,223 in 2024, a gain of 5.3 percent. Bore work in Cherokee County is a mix of new services and replacement of older lines.
Which Cities and Towns in Cherokee County Does Trinity Serve?
Trinity takes directional boring work in all 10 incorporated places in Cherokee County and at sites outside city limits, and Jacksonville is the largest with about 14,639 residents.
| City or town | 2024 population |
|---|---|
| Jacksonville | 14,639 |
| Rusk | 5,553 |
| Alto | 1,064 |
| New Summerfield | 906 |
| Wells | 903 |
| Gallatin | 342 |
| Bullard | 340 |
| Reklaw | 188 |
| Cuney | 117 |
| Troup | 55 |
Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Cherokee County.
Cherokee County borders Anderson County, Angelina County, Henderson County, Houston County, Nacogdoches County, Rusk County and Smith County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Palestine (Anderson), Lufkin (Angelina), Athens (Henderson), Crockett (Houston), Nacogdoches (Nacogdoches), Henderson (Rusk) and Tyler (Smith).
Which Directional Boring Services Are Available in Cherokee County?
Every Trinity service is available in Cherokee County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.
- Road, highway, railroad, creek and river bore crossings, including US 69, US 79 and the Neches River
- Bores under Union Pacific track, built to the railroad boring requirements of the owner
- Drinkable water line boring and sewer force mains in Jacksonville or Rusk and on rural water systems
- Underground conduit in Oncor Electric Delivery Company and Cherokee County Electric Cooperative Association territory, see electric line boring
- Fiber optic boring for ISPs and broadband builders along US 69
- Municipal boring services for cities such as Jacksonville, Rusk and Alto
The free Bore Planner sizes a Cherokee County job before you call.
Cherokee County Directional Boring FAQs: What Do Customers Ask?
Does Trinity Boring Solutions work in Rusk, Texas?
Yes. Trinity Boring Solutions takes work in Jacksonville, Rusk, Alto, New Summerfield, Wells and Gallatin and the rural parts of Cherokee County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.
Who approves a bore under US 69 in Cherokee County?
The TxDOT Tyler District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Cherokee County Commissioners Court and city streets through the city.
Is there rock in Cherokee County?
Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 15 percent of Cherokee County, most of it soft, weathered rock. Potholing confirms it on the actual bore path.
Can a line be bored under the Neches River in Cherokee County?
Yes. A drill is steered below the bed of the Neches River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.
Which railroads have track in Cherokee County?
Union Pacific and short line operators, with about 43 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.
Is Trinity insured for work in Cherokee County?
Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.
How much does directional boring cost in Cherokee County?
A general range comes from the footage and the pipe size. Depth, the crossings and the ground set the number, and loose sand is a factor on many Cherokee County jobs.
How Do You Get a Bore Quote in Cherokee County?
Call (405) 409-7423 any time or send the address in Cherokee County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.