trinityboringsolutions.com

Primera Texas Directional Boring: Racombes Soil, No 26 Canal, Interstate 69E

Quick Answer: From Yukon, the job is 704 road miles out, and Wilson Road work is handled by our own crews or vetted partner drilling contractors. We take directional boring, also called horizontal directional drilling (HDD), in Primera, including routes near Interstate 69E. Racombes sandy clay loam covers much of town, and its clay can cling to tooling and grip pipe. That calls for controlled fluid and staged reaming before a pull along Stuart Place Road.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Primera bores at a glance

  • Incorporated city in Cameron County, Texas. Population 5,449 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 704 miles, about 13.8 hours of driving.
  • Ground: Racombes soil is mapped on 46 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 69E, US 77 and Texas State Highway 107. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: Rio Valley Switching Company, with 6 mapped street and rail crossings.
  • Public water: City of Primera, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Primera near No 26 Canal?

Primera is 704 road miles from our Yukon yard, so our own crews and vetted partner drilling contractors cover work in this part of Cameron County. The Census Bureau Vintage 2024 estimate puts the town population at 5,449. Along Wilson Road or Primera Road, we install water, sewer, gas, electric conduit and fiber, with the route and existing lines shaping the bore plan.

Our main office is in Yukon, Oklahoma, and Primera work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have provided directional boring since 1982 for work planned in Primera. We have had no utility strike in over 25 years, a record we bring to planning around the City of Primera water system and buried lines along Stuart Place Road.

Aerial view of Trinity Boring Solutions crew and service van at a multifamily apartment underground utility jobsite in Oklahoma City
Our crew and service van at a multifamily underground utility job in Oklahoma City, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show in Primera around Racombes?

The USDA soil survey maps Racombes as the largest soil series in Primera, at 46 percent of the town. Racombes sandy clay loam accounts for 41 percent of mapped area, and Raymondville clay loam for 18 percent. At about 40 inches below the surface, sandy clay loam is mapped across 60 percent of the area, while clay accounts for 21 percent. Average clay content at that depth is 30 percent. These are mapped soil patterns, not test borings, so a route on Hand Road still needs planning for the ground actually encountered.

USDA soil survey, inside the Primera city limitsWhat is mapped
Soil series mappedRacombes 46 percent, Raymondville 21 percent, Hidalgo 18 percent and Willacy 13 percent
Texture at the surfacesandy clay loam 65 percent, clay loam 22 percent and fine sandy loam 13 percent
Texture about 40 inches downsandy clay loam 60 percent, clay 21 percent and clay loam 19 percent
Engineering class about 40 inches downlean clay (CL) 100 percent
Average clay content about 40 inches down30 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches48 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel68 percent of the area

Bedrock is not mapped in the top five feet in Primera, though that does not rule out rock deeper down. The USDA survey maps a seasonal water table within 60 inches across 48 percent of the town, so pits along No 26 Canal may need pumping if they take on water. For Primera planning, we account for the fact that flood prone soils are not mapped. High steel corrosion risk covers 68 percent of the area, which makes casing and tracer wire material a line owner decision. The geologic map shows Pleistocene Beaumont Formation, flood plain deposits, described as mud over meander belt sand; expect soil changes rather than a uniform profile.

How do we bore through Primera’s sandy clay loam for an underground crossing?

Racombes sandy clay loam can hold an open hole, then stick to the reamer or grip pipe. On a route near Stuart Place Road, we match the fluid and reaming sequence to the ground as it changes.

  1. We use a thinner fluid mix and ream in stages where Racombes clay starts to cling, then pull pipe while the hole is fresh.
  2. The drill can move from Racombes sandy clay loam into Raymondville clay loam, so we track the head and log depth and pitch as the ground changes.
  3. With a seasonal water table mapped within 60 inches across 48 percent of Primera, we keep pits small and pump them if water collects.
  4. Before drilling near any marked line, we expose it with hydrovac; on a Wilson Road route, that means checking each marked crossing before steering beneath it.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Which roads and tracks does a Primera bore cross near Rio Valley Switching Company?

Interstate 69E, US 77 and Texas State Highway 107 have mapped roadway inside Primera, while US 77 Business runs along or touches the limits. A bore under existing highway pavement is planned as a bore or tunnel, not an open cut. Wilson Road is the longest named street at 3.84 miles in town. Primera Road runs 3.52 miles, and Stuart Place Road runs 2.83 miles. Those routes can put a proposed line near pavement, driveways or other buried utilities, so the alignment and crossing points matter.

CrossingTypeMapped extentWho has a say
Interstate 69EInterstate0.1 roadway miles insideState highway office
US 77US highway0.1 roadway miles insideState highway office
Texas State Highway 107State highway0.3 roadway miles insideState highway office
US 77 BusinessHighway nearbyRuns along or touches the city limitsState highway office
Spur 54Highway nearby1.4 miles outsideState highway office
Rio Valley Switching CompanyRailroad1.79 track miles insideThe railroad
Union PacificRailroad nearby0 miles outsideThe railroad
No 26 CanalStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Canal No 1Stream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
No 1 CanalStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Rio Valley Switching Company has 1.79 track miles inside Primera, and the map shows 6 street and rail crossings. A crossing of its track needs an agreement with the railroad owner; Union Pacific also runs along or touches the town boundary. No named streams are mapped inside town, but No 26 Canal touches the boundary, and unnamed drainage totals 3.88 miles. One street crossing of a named stream is mapped. No lakes or ponds are mapped within one mile, so a water crossing plan here centers on drainage and the canal rather than a local lake.

Whose permission does a Primera bore need in Cameron County?

Primera is incorporated, so work on its city streets is handled by the city; no city department, fee or form is assumed here. For work in the right of way of Interstate 69E, US 77 or Texas State Highway 107, the utility owner, not our drilling crew, applies for a TxDOT utility permit through RULIS. The TxDOT Pharr District reviews the filing. We prepare the bore plan and profile for the owner, then work under its permit. TxDOT cover rules set 60 inches for electric and communication lines crossing a highway, 60 inches for water crossings and 60 inches for pressurized sewer crossings. A different depth may be set in the permit. A Rio Valley Switching Company crossing also requires its agreement, and No 26 Canal is checked for Corps jurisdiction if the work is a water crossing.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are near the City of Primera water system?

The City of Primera public water system uses purchased surface water and reports 1,650 service connections serving 5,811 people. That makes the water line owner and route important details for a service bore along Primera Road. AEP Texas Central, Brownsville Public Utilities Board and Magic Valley Electric Cooperative report electric service in Cameron County; we confirm the line owner for the specific address before planning an electric conduit bore near Wilson Road.

Line ownerWhat it isSourceSize
City of PrimeraPublic water systemSurface water bought from another system1,650 connections, 5,811 people served
AEP Texas Central, Brownsville Public Utilities Board and Magic Valley Electric CooperativeElectric utilities reporting service in Cameron CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

For underground planning in Primera, ACS 2019 to 2023 five year estimates place the median housing year at 2001. Ten percent of homes were built before 1960, 38 percent from 1960 to 1999, and 52 percent in 2000 or later. That mix can mean replacement work on older services as well as new connections near Stuart Place Road. Before the drill gets near any marked line, we hydrovac pothole it; for example, a proposed crossing under Hand Road needs each marked utility exposed first.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Primera and nearby Las Palmas II?

Primera is an incorporated town in Cameron County, with an elevation of 41 feet and an area of 2.78 square miles. Its ZIP code is 78552. Palm Valley is 1.3 miles south, Las Palmas II is 1.7 miles southeast, Juarez is 2.1 miles southeast, and Combes is 2.2 miles northeast. Harlingen, the nearest larger city, is 4.0 miles southeast; Brownsville, the county seat, is 24.4 miles southeast. Our Yukon yard is 704 road miles away, a 13.8 hour drive, so distance is part of planning a Primera mobilization.

Places near Primera

What kinds of bores come up along Stuart Place Road in Primera?

  • Highway crossing: A bore under Interstate 69E or US 77 keeps the existing pavement intact, with the utility owner securing the TxDOT permit.
  • Water service: A new or replacement connection near Primera Road can be planned around the City of Primera water system and existing service lines.
  • Fiber route: Fiber along Wilson Road can pass beneath driveways and pavement without cutting the street surface.
  • Rail crossing: A route crossing Rio Valley Switching Company track needs the railroad owner’s agreement and crossing conditions built into the plan.
  • Drainage crossing: A bore near No 26 Canal needs an alignment that accounts for the canal and any water crossing jurisdiction review.
  • Sewer line: A pressurized sewer crossing at Texas State Highway 107 needs the state required cover and the utility owner’s permit.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Primera bore near Hand Road?

For a Hand Road quote, send the address or map pin, what is going underground, the pipe or conduit size and the footage. A sketch or plans help us see the route and where it meets pavement or existing lines. If the route approaches Interstate 69E or Rio Valley Switching Company track, mark that crossing so we can account for it in the plan.

A short route through Racombes sandy clay loam with clear access is simpler to plan than a long bore through crowded crossings. Length, pipe size, soil conditions and the number of utilities to expose all matter. Pavement on Wilson Road, a track crossing at Rio Valley Switching Company, drainage near No 26 Canal, and pits or sand backfill can add work. The 704 road miles from Yukon also affect mobilization, while emergency timing or a high profile route changes the planning needs.

Questions people ask about boring in Primera

Does Trinity Boring Solutions take directional boring jobs in Primera and Cameron County?

Yes. We take directional boring work in Primera and across Texas, with Cameron County jobs handled by our own crews or by crews from satellite yards run by drilling partners we have vetted. You work with Trinity from the first call through the bore log, whether the crew is ours or a partner’s.

Can groundwater or flooding near No 26 Canal affect bore pits in Primera?

It can. The USDA soil survey maps a seasonal water table within 60 inches across 48 percent of Primera, so pits near No 26 Canal may need pumping if water collects. Flood prone soils are not mapped, but the canal touches the boundary and its crossing conditions still need to be considered in the route plan.

Could Racombes soil corrode steel on a Primera bore, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk across 68 percent of Primera, including areas with Racombes soil. For Primera crossings, we leave coating selection to the line owner for steel casing or tracer wire. HDPE does not share that steel corrosion concern, but the right material depends on the line and the owner’s specifications for the route.

What ground is under a Primera bore in Racombes soil?

Racombes is mapped across 46 percent of Primera, and sandy clay loam is the leading surface texture. At about 40 inches down, sandy clay loam covers 60 percent of mapped area and clay 21 percent. That mix can make the reamer sticky, so we plan the fluid and reaming sequence for the route rather than treating Hand Road as one uniform soil profile.

Will a bore in Primera hit rock along the planned underground route?

Bedrock is not mapped in the top five feet in Primera, but that does not rule out deeper rock. The geologic map shows Pleistocene Beaumont Formation, flood plain deposits, with mud over meander belt sand. A bore near No 26 Canal still needs to account for possible changes in the material along its path.

Who approves a bore under Interstate 69E in Primera?

The utility owner applies for the TxDOT permit through RULIS when work uses Interstate 69E right of way; the contractor does not file it. The TxDOT Pharr District reviews the application. We provide the bore plan and profile for the owner, and the permit sets the approved conditions for that crossing.

What bore sizes and lengths can you handle for a job near Hand Road in Primera?

For Primera work, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a Hand Road job, the pipe size and proposed footage help determine the equipment and plan. Our longest bore was roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa, Oklahoma.

How much notice does Texas811 need for a bore along Wilson Road in Primera?

The person arranging a bore along Wilson Road needs to give Texas811 at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a Primera start slips more than 14 days past the original notice, we make a new request. Before work continues in Primera, we ensure worn or moved marks are refreshed through Texas811.

What affects the cost of directional boring near Interstate 69E in Primera?

The route length and pipe size matter, along with the Racombes soil, pavement, utilities to expose and any drainage or railroad crossing. A bore near Interstate 69E may need highway permitting, while a route at Rio Valley Switching Company track adds crossing coordination. Pit work, excavator time, backfill, urgency and mobilization from Yukon also shape the job price.

Where the Primera facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Primera

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Primera, Texas

Type the address of your job in Primera. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Primera

Same county: Brownsville · San Benito · Los Fresnos · La Feria · Cameron Park · Port Isabel · Laguna Vista · Laureles · Laguna Heights · La Paloma · Rancho Viejo · Santa Rosa. All counties: Texas county list.