Combes Texas Directional Boring: Racombes Soil, Interstate 69E and No 1 Canal
Quick Answer: Combes is an incorporated town in Cameron County, so its city streets belong to the town; we do directional boring, also called horizontal directional drilling (HDD), for routes crossing Interstate 69E. The Yukon, Oklahoma main office is 701 road miles away, and Commerce Street is one local route to consider. Racombes soil is common here, and clay can cling to the reamer and grip pipe. No 1 Canal is another mapped crossing to assess.
Combes bores at a glance
- Incorporated city in Cameron County, Texas. Population 3,259 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 701 miles, about 13.7 hours of driving.
- Ground: Racombes soil is mapped on 44 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 69E, US 77, US 77 Business and Texas State Highway 107. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: Union Pacific, with 5 mapped street and rail crossings.
- Named streams inside the boundary: No 1 Canal and No 7 Canal.
- Public water: City of Combes, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near No 1 Canal in Combes?
Combes is an incorporated town in Cameron County, so its city streets belong to the town. We use the Combes Census Bureau Vintage 2024 estimate of 3,259 as context when planning underground work. We install water, sewer, gas, electric conduit and fiber lines, including service routes along Commerce Street or connections near No 1 Canal; the route and existing utilities shape the bore plan.
Our main office is in Yukon, Oklahoma, and Combes work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The family business began in 1965, and we have done directional boring since 1982. Our no utility strike record of over 25 years matters around the City of Combes water lines and electric infrastructure reported in Cameron County.

How does Racombes soil affect drilling in Combes?
The USDA soil survey maps Racombes across 44 percent of Combes, with Racombes sandy clay loam, 0 to 1 percent slopes, covering 38 percent. At about 40 inches, the mapped texture is sandy clay loam in 55 percent of the area and clay in 30 percent. Average clay content at that depth is 32 percent. In Combes, we treat mapped patterns as planning context, not test borings, and verify actual subsurface conditions before boring. For a bore near Hand Road, the clay content matters because sticky cuttings can collect on a reamer and the ground can grip the pipe.
| USDA soil survey, inside the Combes city limits | What is mapped |
|---|---|
| Soil series mapped | Racombes 44 percent, Raymondville 27 percent, Hidalgo 14 percent and Willacy 12 percent |
| Texture at the surface | sandy clay loam 58 percent, clay loam 27 percent and fine sandy loam 12 percent |
| Texture about 40 inches down | sandy clay loam 55 percent, clay 30 percent and clay loam 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 96 percent and fat clay (CH) 3 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 45 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 74 percent of the area |
We treat Combes bedrock mapping as a top five feet screening layer, not proof deeper rock is absent when planning bore depth. Seasonal water table is mapped within 60 inches across 45 percent of the area, so pits near No 1 Canal may need pumping. We do not see flood prone soils mapped in Combes, but still check the planned bore route against site conditions before setting the path. High steel corrosion risk covers 74 percent, a concern for steel casing and tracer wire that the line owner should address. The Pleistocene Beaumont Formation, flood plain deposits, has mud over meander belt sand, so ground conditions can shift along a route.
What does it take to bore Combes sandy clay loam?
Combes has sandy clay loam over clay in many mapped areas. We match fluid, reaming and pullback timing to those conditions, then track the head from the surface and record its depth and pitch along routes such as Hand Road.
- In Racombes sandy clay loam, we use a thinner drilling fluid with polymer and open the hole in stages so sticky cuttings do not build up on the reamer.
- Because clay can grip pipe, we plan the pullback for the same day the hole is opened, including on a route near Hand Road.
- Where seasonal water is mapped near No 1 Canal, we keep entry and exit pits small and pump them if groundwater fills them.
- Along Interstate 69E, we keep fluid pressure controlled beneath pavement and monitor the tracked head, logging depth and pitch as it advances.

Where might a line go under Interstate 69E in Combes?
Interstate 69E and US 77 each have 6.1 mapped roadway miles inside Combes; US 77 Business has 3.2, and Texas State Highway 107 has 1.1. Existing highway pavement is bored beneath rather than cut. Commerce Street is the longest named street at 3.16 miles, followed by Kilbourn Road at 1.6 miles and Hand Road at 1.38 miles. The route determines whether a bore approaches a highway, a driveway or a street crossing, and each marked utility on that path must be exposed before drilling near it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 69E | Interstate | 6.1 roadway miles inside | State highway office |
| US 77 | US highway | 6.1 roadway miles inside | State highway office |
| US 77 Business | US highway | 3.2 roadway miles inside | State highway office |
| Texas State Highway 107 | State highway | 1.1 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1.91 track miles inside | The railroad |
| Rio Valley Switching Company | Railroad nearby | 0.9 miles outside | The railroad |
| No 1 Canal | Stream | 0.44 channel miles inside | Checked for Corps of Engineers jurisdiction |
| No 7 Canal | Stream | 0.26 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Number Seven Canal | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Canal No 1 | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Number Two Canal | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| No 26 Canal | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.91 track miles inside Combes on the Brownsville Subdivision, and public records map 5 street and rail crossings in town. A track crossing needs an agreement from Union Pacific that sets the crossing conditions. No 1 Canal runs 0.44 channel miles inside Combes, and No 7 Canal runs 0.26; public records map 2 street crossings of named streams. The records list no lakes or ponds within one mile.
Who approves Combes bores near Union Pacific and its highways?
For work in Interstate 69E, US 77, US 77 Business or Texas State Highway 107 right of way, the utility owner, not the driller, applies through TxDOT’s online RULIS system. The TxDOT Pharr District reviews the application, and we give the owner the bore plan and profile for its filing. Electric and communication lines crossing highway grade need 60 inches of cover, while water lines need 60 inches and pressurized sewer lines need 60 inches at crossings. Union Pacific must agree to a track crossing. A No 1 Canal crossing is checked during planning for federal waterway jurisdiction when applicable.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Cameron County near Combes?
For Combes crossings, we account for the City of Combes system serving 3,500 people through 1,100 service connections with purchased surface water. In Cameron County, we account for reported electric service from AEP Texas Central, Brownsville Public Utilities Board and Magic Valley Electric Cooperative. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near Commerce Street or elsewhere in Combes.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Combes | Public water system | Surface water bought from another system | 1,100 connections, 3,500 people served |
| AEP Texas Central, Brownsville Public Utilities Board and Magic Valley Electric Cooperative | Electric utilities reporting service in Cameron County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median year built for Combes housing at 1996; 12 percent was built before 1960, 43 percent from 1960 to 1999 and 45 percent in 2000 or later. That mix can mean replacement work as well as new service routes. Across Combes, we hydrovac pothole each marked utility on the bore path before drilling near it to confirm clearance. For example, a proposed line under Commerce Street needs marked utilities exposed first because paint shows position, not depth.

Where is Combes in relation to Primera and Harlingen?
Combes is in Cameron County, covers 3.25 square miles and sits at an elevation of 45 feet. For Combes planning, we use ZIP codes 78550, 78552 and 78535 as address references, not as substitutes for field utility locating. Primera is 2.2 miles southwest, and Lasana is 2.3 miles northeast. Harlingen is 4.2 miles southeast, while Brownsville, the county seat, is 24.4 miles southeast. The Yukon, Oklahoma main office is 701 road miles away, a 13.7 hour drive, which is part of planning mobilization for work near Interstate 69E or Commerce Street.
Places near Combes
- Directional boring in Primera: 2.2 miles southwest
- Lasana: 2.3 miles northeast
- Juarez: 3.2 miles south
- Directional boring in Las Palmas II: 3.2 miles south
- Directional boring in Palm Valley: 3.4 miles southwest
- Directional boring in Harlingen: 4.2 miles southeast
What would we bore near Hand Road in Combes?
- Highway crossing: A bore beneath Interstate 69E keeps the line below existing pavement rather than cutting across the roadway.
- Water service: A connection near the City of Combes water system can be routed under Commerce Street with its existing utilities exposed first.
- Fiber conduit: A run along Hand Road can pass beneath pavement and driveways without open cutting them.
- Canal crossing: A route under No 1 Canal needs a planned bore path and a check for applicable waterway jurisdiction.
- Rail crossing: A line beneath the Union Pacific Brownsville Subdivision needs railroad agreement before the crossing plan is set.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Combes quote near Commerce Street?
For a route near Commerce Street, start with the address or a map pin. Tell us what will go in the ground, such as water pipe or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show whether the line approaches Interstate 69E, a Union Pacific track or No 1 Canal.
Length and pipe size set much of the work, while Combes clay content affects reaming and pullback. We also account for soil and rock, utilities to cross and expose, and pavement such as a route near Interstate 69E. A Union Pacific track or No 1 Canal adds crossing planning. Pits, excavator time and sand backfill affect the scope, as can emergency timing. The 701 road miles from Yukon shape our Combes mobilization planning and the schedule we set for underground work.
Questions people ask about boring in Combes
Does Trinity Boring Solutions take directional boring jobs in Combes and Cameron County?
Yes. We take directional boring work in Combes and across Texas, with our main office in Yukon, Oklahoma. Work is staffed by our own crews or partner drilling contractors we have vetted. We remain the customer contact from the first call through the bore log, including for a route near Commerce Street.
Will a Combes bore hit rock near No 1 Canal?
Bedrock is not mapped in the top five feet of Combes, but that does not rule out rock deeper down. The geologic map shows Pleistocene Beaumont Formation flood plain deposits, described as mud over meander belt sand. A route near No 1 Canal still needs planning for the ground actually encountered.
Who approves a Combes bore under Interstate 69E?
For a bore in Interstate 69E right of way, the utility owner applies for the TxDOT utility permit in RULIS. The TxDOT Pharr District reviews it, and we prepare the bore plan and profile for the owner’s filing. Existing highway pavement is bored beneath rather than opened by trenching.
What must we account for on a Combes bore beneath Union Pacific track before scheduling the crossing?
A crossing under Union Pacific track requires an agreement with the railroad. Its terms set crossing details such as casing, depth and flagging. The railroad has 1.91 track miles inside Combes, so the exact route and track location need to be part of the crossing plan.
Can a Combes line be bored under No 1 Canal?
A bore can be planned for a route beneath No 1 Canal, which runs 0.44 channel miles inside Combes. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction when applicable. Ground near the canal can also have seasonal water, affecting the pits.
For our Combes boring plans, who owns the Combes public water system, and is its water source purchased surface water?
Because the City of Combes owns its public water system and uses purchased surface water, we plan utility checks before nearby boring. Public records list 1,100 service connections serving 3,500 people. A proposed connection near Commerce Street still needs route planning around existing water and other marked lines.
Can I call Trinity after hours about a Combes bore near Hand Road?
Yes. We can reach a person at Trinity’s phone 24 hours a day at (405) 409-7423 for Combes field questions. For urgent work near Hand Road, tell us the location and what line or conduit is involved so we can understand the request and the site conditions.
How much notice does Texas811 need for a Combes bore near Commerce Street?
For excavation near Commerce Street, Texas law requires a locate request at least 48 hours before work begins, excluding Saturdays, Sundays and legal holidays; it cannot be made more than 14 days ahead. If the start slips more than 14 days past the notice, submit a new request. When Combes utility marks are worn or moved, we have them refreshed through Texas811 before we continue work.
What affects the cost of a Combes directional bore near Interstate 69E?
The route, length and pipe or conduit size matter, along with Combes soil conditions and utilities that must be crossed and exposed. Pavement work near Interstate 69E, a Union Pacific crossing, pits, excavator time and backfill can change the scope. Mobilization from the Yukon office is another factor.
Where the Combes facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Combes
- U.S. Census Bureau, TIGER/Line 2024: Combes boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Combes
- U.S. Census Bureau, American Community Survey 2019 to 2023: Combes housing units and year built
- Macrostrat geologic map compilation: map units under Combes
- U.S. EPA Safe Drinking Water Information System: public water systems serving Combes
- U.S. Department of Transportation, North American Rail Network: track owners in Cameron County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Cameron County
- U.S. Geological Survey, Elevation Point Query Service: Combes elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Combes
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Combes
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Combes, Texas
Type the address of your job in Combes. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Combes
Same county: Brownsville · San Benito · Los Fresnos · La Feria · Cameron Park · Port Isabel · Laguna Vista · Laureles · Laguna Heights · La Paloma · Rancho Viejo · Santa Rosa. All counties: Texas county list.
