Windom Texas Directional Boring: Fairlie Clay, FM 1743 and Texas Northeastern Railroad
Quick Answer: Along FM 1743 and Texas State Highway 56, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Windom, Texas. At 217 road miles from our Yukon, Oklahoma main office, Windom work is handled by our own crews or vetted partner crews, with Maple Street access part of route planning. Fairlie soil and clay dominate the mapped ground, so sticky cuttings can load the reamer and slow pullback.
Windom bores at a glance
- Incorporated city in Fannin County, Texas. Population 201 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 217 miles, about 4.4 hours of driving.
- Ground: Fairlie soil is mapped on 75 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 100 percent of the area.
- Highways inside the boundary: FM 1743, Texas State Highway 56 and Loop 391. State permit office: TxDOT Paris District.
- Railroad track inside the boundary: Texas Northeastern Railroad (line shown as out of service), with 2 mapped street and rail crossings.
- Public water: City of Windom, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Main Street in Windom?
At 217 road miles from our Yukon, Oklahoma main office, our own crews and crews from vetted partner contractors handle Windom jobs. The Census Bureau Vintage 2024 estimate puts the town’s population at 201 in Fannin County. Along Main Street or FM 1743, we can bore water, sewer, gas, electric conduit or fiber routes, with the line type and path guiding the equipment plan.
Our main office is in Yukon, Oklahoma, and Windom work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record has no utility strike in over 25 years, important around the City of Windom groundwater system and Oncor reported electric service in Fannin County. The family business dates to 1965, with directional boring since 1982; along Main Street, we expose marked lines before drilling nearby.

How does Fairlie soil affect a bore in Windom?
The USDA soil survey maps Fairlie as 75 percent of Windom’s soil series. Fairlie-Dalco complex, 1 to 3 percent slopes, covers 66 percent of the mapped area, and Fairlie clay covers 9 percent. Clay makes up 75 percent of the mapped surface texture and is also mapped at 40 inches below the surface; bedrock is mapped there across the remaining 25 percent. These are survey patterns, not test borings. Sticky clay can build on a reamer and grip pipe, so staged reaming and a same day pullback help manage the hole.
| USDA soil survey, inside the Windom city limits | What is mapped |
|---|---|
| Soil series mapped | Fairlie 75 percent, Austin 10 percent, Whitewright 9 percent and Howe 6 percent |
| Texture at the surface | clay 75 percent, silty clay loam 19 percent and clay loam 6 percent |
| Texture about 40 inches down | clay 75 percent and bedrock 25 percent |
| Engineering class about 40 inches down | fat clay (CH) 75 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 100 percent of the area (0 percent hard rock, 100 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across Windom, with typical bedrock depth at 46 inches; hard bedrock is not mapped within that depth. For Windom boring plans, we cannot use mapped seasonal water table or flood prone soil layers because none are mapped. High steel corrosion risk covers 100 percent of the mapped area, so the line owner should consider casing and tracer wire materials. The geologic map names Gober Chalk and Roxton Limestone, Late Cretaceous units; chalk and softer weathered rock may slow the bit compared with soil.
How do we bore Windom clay?
Fairlie clay can stick to the reamer and tighten around pipe. On a Main Street route, we plan the fluid and reaming sequence for that ground, then track the head and log its depth and pitch.
- Because Fairlie clay can cling to the reamer, we use a thinner fluid mix with polymer and open the hole in stages before pulling pipe.
- With heavy clay mapped across Windom, we watch fluid returns along the bore so pressure does not lift pavement near Main Street.
- The soil survey maps bedrock within 60 inches, so when a route meets chalk or limestone we allow for slower drilling and track the head closely.
- For a route near the City of Windom water system or county electric lines, we hydrovac pothole each marked utility before the drill approaches it.

Where does a Windom line go under FM 1743?
FM 1743 has 0.9 mapped roadway miles inside Windom, while Texas State Highway 56 has 0.8 and Loop 391 has 0.3. A line crossing one of these routes needs a bore plan that accounts for the highway pavement and the right of way. Main Street is the town’s longest named street at 0.53 miles, followed by Maple Street at 0.5 and Wall Street at 0.47. Wall Street and Hackberry Street may also shape a route through town.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1743 | State highway | 0.9 roadway miles inside | State highway office |
| Texas State Highway 56 | State highway | 0.8 roadway miles inside | State highway office |
| Loop 391 | State highway | 0.3 roadway miles inside | State highway office |
| Texas Northeastern Railroad (line shown as out of service) | Railroad | 0.75 track miles inside | The railroad |
| Bralley Pool Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Spring Branch | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Cottonwood Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| Burnett Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
The Texas Northeastern Railroad line is shown as out of service, with 0.75 track miles in Windom and 2 mapped street and rail crossings. A bore beneath the track still needs an agreement from the railroad owner. No named streams are mapped inside town limits, and none of the mapped streets crosses a named stream there. Bralley Pool Creek is 0.1 mile from the limits; Spring Branch is 0.5 mile away. Around Windom, we have no mapped lakes or ponds within one mile to plan around during a bore.
Who approves Windom work near Fannin County roads?
FM 1743, Texas State Highway 56 and Loop 391 are state highways, so TxDOT Utility Accommodation Rules set the cover starting point. Electric and communication lines need 60 inches below the lowest crossed grade, and water lines need 60 inches at highway crossings; pressurized sewer also needs 60 inches. TxDOT’s Paris District reviews the utility owner’s application in RULIS. The owner files, while we prepare the bore plan and profile for work under its permit. In incorporated Windom, we treat city streets as city owned when planning a bore crossing. A Texas Northeastern Railroad crossing needs the railroad owner’s agreement, and a creek crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Windom near City of Windom?
The City of Windom public water system draws from groundwater wells and reports 179 service connections serving 199 people. For a bore near that system, we hydrovac pothole marked water lines before drilling close to them. County electric service is reported by Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association. Before we plan an electric conduit bore in Windom, we confirm the line owner for that specific address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Windom | Public water system | Groundwater wells | 179 connections, 199 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative, Grayson-Collin Electric Cooperative and Lamar County Electric Cooperative Association | Electric utilities reporting service in Fannin County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Windom’s median housing year at 1980. The estimates place 27 percent of homes before 1960, 46 percent from 1960 to 1999 and 27 percent in 2000 or later. That mix can mean either replacement work or a new service along Maple Street. Before drilling near a marked water or electric line, we expose it with hydrovac potholing because locate paint shows position, not depth.

Where is Windom near Honey Grove?
Windom is an incorporated town in Fannin County, at an elevation of 696 feet, with 0.55 square miles of land and ZIP code 75492. Dodd City is 4.5 miles west, and Honey Grove is 5.4 miles east. Bonham, the county seat and nearest larger city, is 11.1 miles west. From our Yukon, Oklahoma main office, the drive to Windom is 217 road miles and 4.4 hours. That distance is part of planning the crew and equipment mobilization for a job on FM 1743 or a town street.
Places near Windom
- Directional boring in Dodd City: 4.5 miles west
- Directional boring in Honey Grove: 5.4 miles east
- Directional boring in Ladonia: 9.9 miles south
- Directional boring in Bonham: 11.1 miles west
- Directional boring in Petty: 11.6 miles east
What kinds of bores come up on Maple Street in Windom?
- Highway crossing: A water or conduit bore beneath FM 1743 follows TxDOT cover and pavement requirements instead of cutting across the road.
- Water service: A connection near the City of Windom system can be routed beneath Main Street, with marked lines exposed before drilling.
- Fiber route: A conduit run along Maple Street can pass beneath pavement and driveways without opening a trench through them.
- Rail crossing: A line beneath the Texas Northeastern Railroad track needs the railroad owner’s agreement before the crossing is planned.
- Creek crossing: A route aimed toward Bralley Pool Creek needs a channel plan and a jurisdiction check during planning.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Windom bore near Hackberry Street?
For a bore near Hackberry Street, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route and crossings. That lets us compare the proposed path with nearby streets, FM 1743 and any marked utilities before we shape the work plan.
The Fairlie clay matters first because sticky cuttings can affect reaming and pipe pullback. Next, the route’s length, pipe size and the utilities that need exposure shape the equipment and time. A crossing under FM 1743 or the Texas Northeastern Railroad adds crossing planning, while pavement, pits and excavator time can change the scope. Creek or drainage crossings also affect planning, and 217 road miles from Yukon makes mobilization part of the estimate.
Questions people ask about boring in Windom
Does Trinity take directional boring jobs in Windom and Fannin County?
Yes. We take directional boring work in Windom, and the job is handled by our own crews or crews from partner drilling contractors we have vetted. Our main office is in Yukon, Oklahoma, 217 road miles away. You work with Trinity from the first call through the bore log, including a job on Main Street.
What ground should I expect for a Windom bore in Fairlie soil?
The USDA soil survey maps Fairlie across 75 percent of Windom’s soil series, and clay makes up 75 percent of the surface texture. At about 40 inches below the surface, clay is mapped across 75 percent of the area. That sticky ground can load a reamer, so we plan staged reaming and a timely pipe pullback.
Will a bore in Windom hit rock near Main Street?
The soil survey maps weathered bedrock within five feet across Windom, with typical depth at 46 inches. Hard bedrock is not mapped within 60 inches. Gober Chalk and Roxton Limestone are the named local units, so a route that meets weathered rock may drill more slowly than one staying in soil.
Who approves a Windom bore under FM 1743?
The utility owner applies for the TxDOT permit through RULIS, and the TxDOT Paris District reviews it. For an FM 1743 crossing, electric, communication and water lines have a 60 inch cover starting point; pressurized sewer also needs 60 inches at a crossing. We prepare the bore plan and profile for the owner’s permit.
What does a Windom bore under Texas Northeastern Railroad (line shown as out of service) require?
A crossing under the Texas Northeastern Railroad track needs an agreement from the railroad that owns it, even though the line is shown as out of service. The agreement sets crossing conditions such as casing, depth and flagging. Windom has 0.75 track miles mapped inside town limits and 2 mapped street and rail crossings.
Can a Windom line be bored under Bralley Pool Creek?
A crossing can be considered if the route and channel conditions support it. Bralley Pool Creek is mapped 0.1 mile from Windom’s limits, not inside them. During planning, we check whether the proposed creek crossing falls under U.S. Army Corps of Engineers jurisdiction and plan the bore depth around the channel.
How much notice does Texas811 need for a Windom bore along Main Street?
For a Main Street bore, Texas811 needs the locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If a Windom start slips more than 14 days past the original notice, we submit a new request. Worn or moved marks need refreshing through Texas811 before work continues.
Does Windom’s distance from Bonham change the job from Yukon?
From our Yukon, Oklahoma main office, Windom is 217 road miles away and takes a 4.4 hour drive, shaping our trip planning. Bonham is 11.1 miles west and is the nearest larger city, but the Yukon distance still factors into mobilizing crews and equipment. The route and work scope, such as a crossing beneath FM 1743, also shape planning.
What affects the cost of a directional bore in Windom under FM 1743?
The Fairlie clay, bore length and pipe size shape the work first, followed by utility exposure, pavement, pits and equipment time. An FM 1743 crossing brings highway cover and permit planning into the scope. A railroad or creek crossing may add planning needs, and the 217 road miles from Yukon affect mobilization.
Where the Windom facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Windom
- U.S. Census Bureau, TIGER/Line 2024: Windom boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Windom
- U.S. Census Bureau, American Community Survey 2019 to 2023: Windom housing units and year built
- Macrostrat geologic map compilation: map units under Windom
- U.S. EPA Safe Drinking Water Information System: public water systems serving Windom
- U.S. Department of Transportation, North American Rail Network: track owners in Fannin County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Fannin County
- U.S. Geological Survey, Elevation Point Query Service: Windom elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Windom
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Windom
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Windom, Texas
Type the address of your job in Windom. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.