Shiro Texas Directional Boring: Arol Fine Sandy Loam, Lake Creek and BNSF Railway

Quick Answer: How does the top five feet around Shiro read? USDA soil maps show Arol and Falba fine sandy loams above bedrock mapped at about 40 inches. At Lake Creek, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Shiro, Texas, to carry lines below the creek. Our Yukon yard is 396 road miles away, affecting mobilization near Texas State Highway 30. With bedrock mapped within five feet across much of Shiro, we plan for weathered rock rather than assume open soil.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Shiro bores at a glance

  • Unincorporated community in Grimes County, Texas. Population 201 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 396 miles, about 7.8 hours of driving.
  • Ground: Arol soil is mapped on 34 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 89 percent of the area.
  • Highways inside the boundary: Texas State Highway 30 and FM 1486. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Lake Creek and Big Lake Creek.
  • Public water: Shiro Water System, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone handle directional boring in Shiro near Lake Creek?

Shiro is an unincorporated census designated place in Grimes County, not a city with its own government. The 2020 Census counted 201 people; the Census Bureau does not publish yearly estimates for unincorporated places. Along Carrell, Wingard or Edwards Avenue, we can install water, sewer, gas, electric conduit or fiber by boring where the route and existing lines allow.

Our main office is in Yukon, Oklahoma, and Shiro work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. Against that scale, a Shiro service run along Carrell or Wingard may be much shorter; we have been a family business since 1965 and have done directional boring since 1982.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

How does Shiro’s Arol soil affect a bore?

The USDA soil survey maps Arol across 34 percent of Shiro and Falba across 32 percent, with Greenvine at 10 percent, Gowker at 9 percent and Shiro soil at 8 percent. Arol fine sandy loam is the largest named map unit at 33 percent; Falba fine sandy loam accounts for 32 percent. Fine sandy loam covers 66 percent at the surface, while clay loam is 15 percent and clay is 10 percent. At about 40 inches, bedrock is the mapped texture across 83 percent; the survey gives average clay content there as 26 percent.

USDA soil survey, inside the Shiro mapped community boundaryWhat is mapped
Soil series mappedArol 34 percent, Falba 32 percent, Greenvine 10 percent, Gowker 9 percent and Shiro 8 percent
Texture at the surfacefine sandy loam 66 percent, clay loam 15 percent and clay 10 percent
Texture about 40 inches downbedrock 83 percent, clay loam 9 percent and clay 5 percent
Engineering class about 40 inches downlean clay (CL) 10 percent and fat clay (CH) 5 percent
Average clay content about 40 inches down26 percent
Bedrock mapped within 60 inches89 percent of the area (0 percent hard rock, 89 percent weathered rock)
Seasonal water table within 60 inches42 percent of the area
Flood prone soils10 percent of the area
High corrosion risk for uncoated steel92 percent of the area

The USDA soil survey maps bedrock within 60 inches across 89 percent of Shiro, mostly weathered bedrock; the typical depth is 33 inches. Hard bedrock is not mapped within 60 inches, but weathered rock can slow the cut. Seasonal water table areas cover 42 percent, and flood prone soils cover 10 percent, so pits and creek routes need water planning. High steel corrosion risk is mapped across 92 percent, a concern for steel casing and tracer wire that the line owner should address. The Catahoula Formation, a Cenozoic unit, includes mudstone, sand and conglomerate, among other materials.

How do crews drill Shiro ground with bedrock near the surface?

Shiro’s Arol and Falba loams sit over shallow mapped bedrock, with seasonal water table areas in the survey. We choose the profile and fluid for the actual crossing, not the soil name alone.

  1. At Lake Creek and Big Lake Creek, we set a profile to pass beneath the channel; mapped flood prone soils cover 10 percent of Shiro, so depth and jurisdiction need review.
  2. Where Arol soil meets weathered bedrock near the mapped typical depth of 33 inches, we slow the cut and check depth and pitch as the bore advances.
  3. Seasonal water table areas cover 42 percent of Shiro, so pits near Carrell may need pumping and careful sizing when the ground is wet.
  4. With high steel corrosion risk mapped across 92 percent of Shiro, the line owner considers casing and tracer wire materials; HDPE avoids that steel concern.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

Where might a Shiro line pass beneath Carrell?

Texas State Highway 30 runs 1.4 mapped roadway miles inside the community, and FM 1486 adds 1.1 miles. A bore under either route must follow the state highway process. Carrell is the longest named street at 0.36 miles; Wingard and Wingard Avenue each measure 0.26 miles, while Edwards Avenue measures 0.24 miles. Those streets give a route designer specific places to check for pavement, driveways and existing utilities before setting pits.

CrossingTypeMapped extentWho has a say
Texas State Highway 30State highway1.4 roadway miles insideState highway office
FM 1486State highway1.1 roadway miles insideState highway office
BNSF RailwayRailroad1.96 track miles insideThe railroad
Lake CreekStream1.74 channel miles insideChecked for Corps of Engineers jurisdiction
Big Lake CreekStream1.74 channel miles insideChecked for Corps of Engineers jurisdiction
Flagtail CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 1.96 track miles inside Shiro, and public records map 3 street and rail crossings in the community. A bore beneath the track needs an agreement with BNSF Railway, which sets casing, depth and flagging. Lake Creek and Big Lake Creek each have 1.74 channel miles mapped here; 3 street crossings of named streams are mapped. A route under either creek can avoid cutting the bank, with the channel crossing checked during planning.

Who approves Shiro work in Grimes County?

Shiro is an unincorporated census designated place, so there is no city government to issue street permits; responsibility follows the county or state road owner. Texas State Highway 30 and FM 1486 are state routes, so the utility owner applies for a TxDOT utility permit through RULIS, reviewed by the TxDOT Bryan District. We prepare the bore plan and profile for that owner. For a Texas State Highway 30 crossing, TxDOT requires 60 inches of cover for water, electric and communication lines, subject to a different depth in the permit, and requires boring or tunneling beneath existing pavement. BNSF Railway sets its own crossing conditions, while Lake Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the Shiro Water System and nearby lines?

The privately owned Shiro Water System uses groundwater wells and reports 118 service connections serving 103 people. That system does not identify every line along Wingard or Carrell, so the owner of a proposed electric conduit must be confirmed for the address. Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Grimes County; we do not assume one provider serves every Shiro address.

Line ownerWhat it isSourceSize
Shiro Water SystemPublic water systemGroundwater wells118 connections, 103 people served
Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric CooperativeElectric utilities reporting service in Grimes CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Shiro’s median housing year at 1972: 28 percent of units were built before 1960, 61 percent from 1960 to 1999 and 11 percent in 2000 or later. Older lines along Edwards Avenue may need replacement, while newer services may need a fresh route. Before the drill approaches a marked utility, we use hydrovac potholing to expose it; paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

How far is Shiro from Anderson and our Yukon yard?

Shiro is an unincorporated community in Grimes County, at an elevation of 357 feet and covering 2.54 square miles. For service planning in Shiro, we cover its ZIP codes 77873, 77876 and 77831. Richards is 5.3 miles southeast, Anderson is 10.1 miles southwest, Bedias is 12.7 miles north and Iola is 16.2 miles northwest. The county seat, Anderson, is 10.1 miles southwest; Navasota is the nearest larger city, 19.3 miles southwest. From our Yukon yard, the route is 396 road miles and a 7.8 hour drive, which matters when planning mobilization for a Shiro bore.

Places near Shiro

What bore projects fit Shiro streets such as Wingard?

  • Highway crossing: A water or communication line beneath Texas State Highway 30 needs a bore plan that meets TxDOT cover and pavement requirements.
  • Water service: A service near Wingard can connect a property route to the privately owned Shiro Water System after the line owner is confirmed.
  • Creek crossing: A route beneath Lake Creek can keep the channel bank uncut, with the crossing checked for federal jurisdiction during planning.
  • Rail crossing: A bore beneath the BNSF Railway track needs an agreement defining casing, depth and flagging before work proceeds.
  • Fiber conduit: A conduit route along Edwards Avenue can pass beneath pavement, with marked utilities exposed before drilling approaches them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Shiro bore near Texas State Highway 30?

For a route beside Carrell or Texas State Highway 30, send the address or map pin first. Tell us whether the line is water, sewer, gas, electric conduit or fiber, then give its pipe or conduit size and footage. A sketch or plans showing Lake Creek or nearby crossings helps us lay out the route.

The job details shape the price. Arol soil and bedrock mapped near 33 inches affect the ground plan; a crossing under Texas State Highway 30 or BNSF Railway adds permit or agreement work. Length, pipe size, exposed utilities, pavement, creek crossings, pits, excavator time and sand backfill all matter. Shiro is 396 road miles from Yukon, so mobilization is part of the scope, especially for high profile or emergency work.

Questions people ask about boring in Shiro

Does Trinity take directional boring jobs in Shiro and Grimes County?

Yes. We take directional boring work in Shiro and across Texas, with the crew arrangement set through our vetted drilling contractor partners and our own crews. You work with Trinity from the first call through the bore log, even when a partner yard supports a route near Carrell or Lake Creek.

What ground should I expect in Shiro’s Arol soil?

Arol fine sandy loam is common in Shiro, and the USDA soil survey maps bedrock as the texture at about 40 inches across 83 percent of the area. The same survey gives average clay content at that depth as 26 percent. Those are mapped patterns, not a test of a specific route near Wingard.

Is there rock near the surface for a bore in Shiro?

The USDA soil survey maps bedrock within 60 inches across 89 percent of Shiro, and weathered bedrock accounts for that mapped area. In Shiro, we account for the fact that hard bedrock is not mapped within that depth. A route near Edwards Avenue still needs field planning because the survey describes broad ground patterns rather than the exact conditions at a bore.

For a proposed bore under Texas State Highway 30 in Shiro, who approves the crossing?

TxDOT reviews the utility permit through its Bryan District for Texas State Highway 30. The utility owner, not the drilling contractor, submits the application in RULIS, and we prepare the bore plan and profile for the owner. Existing highway pavement is bored or tunneled beneath rather than crossed by open trench.

What does a Shiro bore under BNSF Railway need?

A crossing agreement from BNSF Railway is needed for a bore beneath its 1.96 track miles in Shiro. The railroad sets crossing conditions such as casing, depth and flagging. The mapped street and rail crossings make it important to identify the exact track route before laying out a bore near Carrell.

Can a line be bored beneath Lake Creek in Shiro?

A line can be planned to pass beneath Lake Creek without cutting its bank. Lake Creek has 1.74 channel miles mapped inside Shiro, and a creek crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. Big Lake Creek also has 1.74 channel miles mapped in the community.

What bore sizes and lengths can Trinity handle near Edwards Avenue in Shiro?

For Shiro crossings, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a route near Edwards Avenue, the proposed size and distance help determine the equipment and plan. A sketch showing pavement or marked utilities helps define the route.

How early should I call 811 for a bore near Carrell in Shiro?

For a bore near Carrell, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. For Shiro scheduling, if the start moves more than 14 days past the original notice, we submit a new request. Around Shiro, we refresh worn or moved marks through Texas811 before work continues.

What affects the cost of a Shiro bore near Texas State Highway 30?

The route and scope matter: length, pipe size, Arol soil and weathered bedrock, pavement, exposed utilities and creek crossings can all affect the work. A Texas State Highway 30 or BNSF Railway crossing adds its own planning needs. Shiro’s 396 road miles from Yukon also affects mobilization, as can pits, excavator time and emergency timing.

Where the Shiro facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Shiro

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Shiro, Texas

Type the address of your job in Shiro. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Shiro

Same county: Plantersville · Todd Mission · Pinebrook. All counties: Texas county list.