trinityboringsolutions.com

Mountain City Texas Directional Boring: Comfort Soil, FM 2770 and Plum Creek

Quick Answer: The USDA soil survey maps Comfort soil and very stony clay near the surface, with bedrock mapped within 40 inches across 93 percent of Mountain City. We provide directional boring, also called horizontal directional drilling (HDD), for routes such as FM 2770 without opening the pavement. Mountain City is 420 road miles from our Yukon yard, and Maple Drive is one of its longer named streets. That shallow mapped bedrock can slow drilling and affect the bit choice.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Mountain City bores at a glance

  • Incorporated city in Hays County, Texas. Population 676 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 420 miles, about 8.1 hours of driving.
  • Ground: Comfort soil is mapped on 42 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 93 percent of the area.
  • Highways inside the boundary: FM 2770. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Mountain City, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Plum Creek in Mountain City?

Mountain City is in Hays County, where the Census Bureau Vintage 2024 estimate puts the population at 676. We install water, sewer, gas, electric conduit and fiber on routes along streets such as Maple Drive and Jack C Hays Trail, with the route set by the service address and existing lines. That makes the street plan and utility locates part of the bore scope.

Our main office is in Yukon, Oklahoma, and Mountain City work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business started in 1965 and have done directional boring since 1982; our record of no utility strike in over 25 years matters where a bore approaches the City of Mountain City water system or electric lines reported in Hays County.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Comfort soil like to bore in Mountain City?

The USDA soil survey maps Comfort soil across 42 percent of Mountain City, with very stony clay at the surface. Real gravelly loam covers 23 percent and Austin Castephen complex covers 21 percent. At about 40 inches below the surface, the survey maps bedrock in 93 percent of the area and clay in 7 percent; average clay content at that depth is 50 percent. For Mountain City’s Comfort and Real soil series, we use mapped patterns as references, not test borings. The clay can cling to the reamer and grip pipe, so the drilling fluid and reaming sequence need to suit the ground.

USDA soil survey, inside the Mountain City city limitsWhat is mapped
Soil series mappedComfort 42 percent, Real 23 percent, Austin 21 percent, Medlin 5 percent and Doss 3 percent
Texture at the surfacevery stony clay 42 percent, silty clay 24 percent and gravelly loam 23 percent
Texture about 40 inches downbedrock 93 percent and clay 7 percent
Engineering class about 40 inches downfat clay (CH) 7 percent
Average clay content about 40 inches down50 percent
Bedrock mapped within 60 inches93 percent of the area (46 percent hard rock, 48 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel76 percent of the area

Bedrock is mapped within 60 inches across 93 percent of Mountain City, including 46 percent mapped as hard and 48 percent as weathered; typical depth is 16 inches. That shallow rock can slow a bore, and the soil to rock change can push the head off line. Near Plum Creek, we do not treat seasonal water tables or flood prone soils as mapped conditions. High steel corrosion risk covers 76 percent, so the line owner should weigh casing and tracer wire materials. The mapped geology is Austin Chalk of Late Cretaceous age, which can call for slower rock drilling where encountered.

How do we bore through Mountain City bedrock?

The USDA soil survey puts Comfort soil and shallow bedrock in the path planning picture for Mountain City. We match the bit, drilling fluid and reaming passes to the ground shown along the specific route.

  1. At about 40 inches, clay is mapped in 7 percent of Mountain City and average clay content is 50 percent; we manage sticky returns and ream in stages.
  2. With bedrock mapped within 60 inches across 93 percent of the area, we check depth and pitch as the bore approaches the soil to rock contact.
  3. Where the Austin Chalk is encountered beneath Maple Drive, a rock bit may be needed and progress can be slower than through soil.
  4. The 76 percent mapped high steel corrosion risk is a material question for the line owner; we can plan around the specified casing and tracer wire.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

What is in the way of a new line in Mountain City near FM 2770?

FM 2770 is the state highway mapped for 0.9 roadway miles inside Mountain City, with no other highway listed within 1.5 miles outside the limits. Named streets include Jack C Hays Trail at 0.95 miles, Maple Drive at 0.74 miles and Live Oak Drive at 0.73 miles. These street lengths describe the mapped network, not a particular bore route. Pavement or driveway crossings on those streets may call for pits placed off the traveled surface and a bore path set around existing lines.

CrossingTypeMapped extentWho has a say
FM 2770State highway0.9 roadway miles insideState highway office
Plum CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Mustang BranchStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Mountain City or within 1 mile outside it, so no local track route is identified for a bore plan. No named stream is mapped inside the limits, and no street crossing of a named stream is mapped there. Plum Creek is 0.3 miles from the city limits and Mustang Branch is 0.4 miles away. If a project route reaches either channel, the crossing needs its own depth and access review; there are no lakes or ponds mapped within 1 mile.

Who has to sign off on a Mountain City bore in Hays County?

For work in FM 2770 right of way, the line owner, not the drilling contractor, submits the utility application through TxDOT’s RULIS system. The TxDOT Austin District reviews it, and we prepare the bore plan and profile for the owner’s filing. At FM 2770, we follow TxDOT rules calling for boring or tunneling beneath existing highway pavement. Electric and communication lines need 60 inches of cover at a crossing and 48 inches along the right of way; water needs 60 inches at crossings and 36 inches along it. Pressurized sewer needs 60 inches at a crossing. Mountain City’s incorporated streets belong to the city. No railroad is mapped nearby; a Plum Creek crossing would be checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near City of Mountain City lines?

The City of Mountain City public water system uses groundwater wells and lists 234 service connections serving 725 people. That gives a bore planner a named water system to check, but the line owner and exact route still need confirmation at the project address. Hays County electric service reporting lists City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. We confirm the line owner before planning an electric conduit bore along a street such as Maple Drive.

Line ownerWhat it isSourceSize
City of Mountain CityPublic water systemGroundwater wells234 connections, 725 people served
City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Hays CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Mountain City’s median housing year at 1987; 94 percent of homes date from 1960 to 1999, 1 percent from before 1960 and 5 percent from 2000 or later. That mix can mean either replacement work or a newer service route near Jack C Hays Trail. Paint shows a utility’s position, not its depth. We hydrovac pothole each marked utility on the bore path before drilling near it; for example, a marked line beneath Maple Drive is exposed before the drill approaches.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

Do you cover Mountain City, Kyle and nearby rural sites?

Mountain City is an incorporated city in Hays County, covering 0.53 square miles at an elevation of 847 feet. For underground work in Hays County, we use Mountain City’s ZIP codes 78610 and 78640 for location planning. Kyle is 3.2 miles south, and Buda is 3.6 miles northeast; Hays is 5.8 miles north. San Marcos, the county seat, is 11.8 miles south. Our Yukon yard is 420 road miles away, an 8.1 hour drive. We take work across Texas, including routes outside Mountain City’s limits, with the scope and access planned for each site.

Places near Mountain City

What boring work comes up around Mountain City’s Maple Drive?

  • Highway crossing: A bore at FM 2770 is planned around the state right of way, pavement and required utility cover.
  • Water service: A route near the City of Mountain City water system starts with confirming the groundwater line owner and its location.
  • Fiber conduit: A run along Jack C Hays Trail can be placed beneath the street surface, with the route set around marked utilities.
  • Street service: Maple Drive’s mapped 0.74 miles gives a named route for planning a service bore and its entry and exit pits.
  • Creek approach: Plum Creek sits 0.3 miles from Mountain City limits, so a route reaching it needs channel specific planning.
  • Electric conduit: Before a conduit route near Live Oak Drive is planned, the electric line owner is confirmed for that address.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Mountain City work near Jack C Hays Trail?

For a quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route near Jack C Hays Trail also needs enough detail to show pavement, access and nearby marked lines.

A short route with clear access and no pavement or utility conflicts is simpler to plan than a long, crowded crossing. Comfort soil and shallow bedrock can change bit choice and drilling time. Pavement, pipe size, bore length, utility crossings, pits and excavator time all affect the scope. Work in FM 2770 right of way adds a permit plan, while a route near Plum Creek needs channel planning. With 420 road miles from Yukon, we account for the distance when planning mobilization to Mountain City.

Questions people ask about boring in Mountain City

Does Trinity take directional boring work in Mountain City and Hays County?

Yes. We take directional boring work across Texas, including Mountain City in Hays County. Our own crews and vetted drilling partners support the work from the Yukon main office and satellite yards. You work with Trinity through the bore log, whether the route follows Maple Drive or approaches Jack C Hays Trail.

What ground should I expect for a Mountain City bore through Comfort soil?

The USDA soil survey maps Comfort soil across 42 percent of Mountain City, with very stony clay at the surface. At about 40 inches, it maps bedrock across 93 percent of the area and clay across 7 percent, with average clay content of 50 percent. That mix can mean sticky drilling and shallow rock.

How much bedrock is mapped in the top five feet of Mountain City?

Bedrock is mapped within 60 inches across 93 percent of Mountain City. The survey maps 46 percent as hard bedrock and 48 percent as weathered bedrock, with typical depth at 16 inches. A route may therefore need a rock bit or slower drilling where the rock is encountered.

Who approves a Mountain City bore under FM 2770?

The line owner applies for the TxDOT utility permit through RULIS, and the TxDOT Austin District reviews it. For FM 2770, we provide the owner with the bore plan and profile for its application. The permit sets the allowed route and cover, so those details are settled before work in the right of way.

Can a line be bored beneath Plum Creek near Mountain City?

Potentially, but Plum Creek is 0.3 miles from Mountain City limits, and no named stream is mapped inside the city. A route that reaches the creek needs channel planning, and its jurisdiction is checked during planning. Access, bore depth and the line route determine whether the crossing can be built as planned.

When we plan underground work near Mustang Branch in Mountain City, who runs the public water system, and where does its water come from?

The system is named City of Mountain City, is privately owned and draws water from groundwater wells. Public records for Mountain City list 234 service connections and 725 people served, figures we consider when planning underground utility work. For a bore near that system, the specific line owner and its location need confirmation before the route is set.

Does Trinity cover Kyle and rural sites outside Mountain City?

Yes. We take work across Texas, including Kyle, 3.2 miles south of Mountain City, and rural sites beyond the city limits. The Yukon yard is 420 road miles away, so distance is part of planning mobilization. The route, access and ground conditions still determine the equipment and crew plan.

How early should I request a locate for a Mountain City bore on Jack C Hays Trail?

Texas811 needs the request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Texas811 describes that as two working days. If the start moves more than 14 days beyond the original notice, request a new ticket; have worn or moved marks refreshed before work continues.

What affects the price of directional boring near FM 2770 in Mountain City?

The route, footage, pipe or conduit size, soil and rock, pavement, utility crossings, pits and equipment time all shape the price. Comfort soil and shallow bedrock can affect drilling time, while FM 2770 brings right of way planning. The 420 road miles from Yukon also make mobilization part of the job scope.

Where the Mountain City facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Mountain City

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Mountain City, Texas

Type the address of your job in Mountain City. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Mountain City

Same county: San Marcos · Dripping Springs · Wimberley · Woodcreek · Uhland · Austin · Bear Creek · Driftwood · Creedmoor · Belterra. All counties: Texas county list.