Cleburne Texas Directional Boring: Ponder Clay, US 67, East Buffalo Creek
Quick Answer: The City of Cleburne water system and electric providers reporting in Johnson County are line owners to identify before a bore near US 67 or BNSF Railway. Trinity takes directional boring, also called horizontal directional drilling (HDD), work in Texas for routes crossing Main Street and local tracks. Cleburne sits 244 road miles from our Yukon, Oklahoma main office, a factor for East Buffalo Creek work. Ponder clay loam and heavy clay can cling to tooling and grip pipe, so we manage fluid returns and ream in stages.
Cleburne bores at a glance
- County seat of Johnson County, Texas. Population 38,131 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 244 miles, about 4.8 hours of driving.
- Ground: Ponder soil is mapped on 24 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 21 percent of the area.
- Highways inside the boundary: US 67, US 67 Business, FM 4, Texas State Highway 174 and Texas State Highway 171. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: BNSF Railway and Fort Worth and Western Railroad, with 51 mapped street and rail crossings.
- Named streams inside the boundary: East Buffalo Creek, Mc Anear Creek, Nolan River and Buffalo Creek.
- Public water: City of Cleburne, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Cleburne near BNSF Railway?
The City of Cleburne water system and electric providers reporting in Johnson County are line owners to identify before planning a bore. The Census Bureau Vintage 2024 estimate puts Cleburne at 38,131 people. We install water, sewer, gas, electric conduit and fiber lines, including routes along Henderson Street or beneath streets near BNSF Railway, after the existing utilities are located and exposed.
Our main office is in Yukon, Oklahoma, and Cleburne work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a small service near Main Street or a larger casing crossing, our range runs from 3/4 inch service lines to 48 inch casing, with directional boring work dating to 1982 and our family business starting in 1965.

What ground should a Cleburne bore through near Ponder soil?
The USDA soil survey maps Ponder soil across 24 percent of Cleburne, including Ponder clay loam and Ponder Urban land complex. Clay loam makes up 39 percent of the mapped surface texture, while clay accounts for 24 percent. At about 40 inches, the survey maps clay in 39 percent of the area and silty clay in 21 percent; average clay content at that depth is 43 percent. For Cleburne projects, we use mapped soil patterns as planning context, not as substitutes for test borings. Clay can hold an open hole, but sticky cuttings may collect on the reamer and wet clay can grip pipe.
| USDA soil survey, inside the Cleburne city limits | What is mapped |
|---|---|
| Soil series mapped | Ponder 24 percent, Sanger 16 percent, Aledo 11 percent, Lindale 7 percent and Slidell 6 percent |
| Texture at the surface | clay loam 39 percent, clay 24 percent and gravelly clay loam 11 percent |
| Texture about 40 inches down | clay 39 percent, silty clay 21 percent and bedrock 14 percent |
| Engineering class about 40 inches down | fat clay (CH) 67 percent and lean clay (CL) 10 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 21 percent of the area (14 percent hard rock, 7 percent weathered rock) |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 6 percent of the area |
| High corrosion risk for uncoated steel | 76 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 21 percent of Cleburne, including hard bedrock in 14 percent and weathered bedrock in 7 percent; typical mapped depth is 26 inches. Seasonal water tables within 60 inches cover 3 percent, and flood prone soils cover 6 percent, so creek routes need depth planning. High steel corrosion risk is mapped in 76 percent, which matters for casing and tracer wire; the line owner selects coatings, while HDPE is unaffected by soil corrosion. The geologic map lists Cenozoic silty clay decomposition residuum, with strongly smectitic clay, and Cretaceous Grayson Marl and Main Street Limestone, undivided. Rock contacts can affect steering.
How do we bore through Cleburne clay near Main Street?
Ponder clay loam and the mapped heavy clay call for controlled fluid and staged reaming. We track the drill head from the surface, expose marked utilities and keep the pullback ready for the ground conditions along the route.
- On Ponder clay loam, we use fluid suited to sticky cuttings and ream in stages so clay does not build up on the tooling.
- Where Cleburne’s heavy clay is mapped, we watch fluid returns closely; pressure can lift pavement if it is not controlled.
- For a route near East Buffalo Creek, we plan the bore depth under the channel and check whether the crossing falls under federal jurisdiction.
- Before a bore near Henderson Street, we hydrovac expose each marked utility on the path because locate paint does not show depth.

Which Cleburne roads, tracks or creeks include East Buffalo Creek?
US 67, US 67 Business, FM 4, Texas State Highway 174 and Texas State Highway 171 are among the routes inside Cleburne. TxDOT maps 19.1 roadway miles of US 67 and 20.1 miles of FM 4 within the city. Main Street is the longest named street at 14.12 miles, followed by Henderson Street at 8.54 miles and Nolan River Road at 7.63 miles. A bore route under these streets can avoid cutting the pavement, but the plan has to account for the road right of way and marked utilities.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 19.1 roadway miles inside | State highway office |
| US 67 Business | US highway | 6.6 roadway miles inside | State highway office |
| FM 4 | State highway | 20.1 roadway miles inside | State highway office |
| Texas State Highway 174 | State highway | 14.7 roadway miles inside | State highway office |
| Texas State Highway 171 | State highway | 12.8 roadway miles inside | State highway office |
| FM 1718 | State highway | 3.4 roadway miles inside | State highway office |
| FM 2135 | State highway | 1 roadway miles inside | State highway office |
| FM 1434 | State highway | 0.4 roadway miles inside | State highway office |
| FM 2331 | State highway | 0.4 roadway miles inside | State highway office |
| FM 1192 | State highway | 0.1 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 19.72 track miles inside | The railroad |
| Fort Worth and Western Railroad | Railroad | 10.73 track miles inside | The railroad |
| East Buffalo Creek | Stream | 6.6 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mc Anear Creek | Stream | 5.5 channel miles inside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 19.72 track miles in Cleburne, and Fort Worth and Western Railroad has 10.73. Public mapping shows 51 street and rail crossings, so a route near either railroad needs its own crossing coordination. East Buffalo Creek has 6.6 channel miles in the city; Mc Anear Creek has 5.5 and Nolan River has 5.33. Mapping also shows 60 street crossings of named streams. Lake Pat Cleburne is within city limits, so a proposed water crossing needs planning for the specific channel or shoreline.
Who approves a Cleburne bore under US 67?
For a bore in the US 67 right of way, the utility owner files the application through TxDOT’s online RULIS system, not the drilling contractor. We prepare the bore plan and profile, and the TxDOT Fort Worth District reviews the application. Electric and communication lines crossing a highway need 60 inches of cover below the lowest crossed grade and 48 inches along the right of way; water lines need 60 inches at crossings and 36 inches along the right of way. Pressurized sewer crossings need 60 inches. TxDOT can set another depth in the permit. A crossing under BNSF Railway or Fort Worth and Western Railroad needs an agreement from the track owner. City streets belong to Cleburne, and creek crossings such as East Buffalo Creek are checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Cleburne near the City of Cleburne system?
The City of Cleburne public water system uses surface water and reports 13,578 service connections serving 34,075 people. Electric service reported in Johnson County includes Oncor Electric Delivery Company, Texas New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near Henderson Street or another route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Cleburne | Public water system | Surface water | 13,578 connections, 34,075 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Johnson County | EIA Form 861 | Confirm the line owner by address |
We use Cleburne’s median housing year of 1981 from the American Community Survey 2019 to 2023 five year estimates as background, not a substitute for site checks. It estimates 20 percent of homes were built before 1960, 54 percent from 1960 to 1999 and 26 percent in 2000 or later. A replacement bore along Henderson Street may pass older water or electric lines as well as newer services. We hydrovac pothole marked utilities on the path before drilling near them; paint shows position, not depth.

Where is Cleburne in relation to Mansfield and nearby towns?
Cleburne is the Johnson County seat, at an elevation of 807 feet, and covers 33.2 square miles. Its ZIP codes are 76033, 76031, 76058 and 76044. Keene is 5.9 miles northeast, Coyote Flats is 7.0 miles east, Joshua is 7.4 miles north, Rio Vista is 8.6 miles south and Godley is 10.1 miles northwest. Mansfield, the nearest larger city listed, is 22.5 miles northeast. From our Yukon, Oklahoma main office, Cleburne is 244 road miles and a 4.8 hour drive, which can affect mobilization for work near Nolan River Road.
Places near Cleburne
- Directional boring in Keene: 5.9 miles northeast
- Directional boring in Coyote Flats: 7 miles east
- Directional boring in Joshua: 7.4 miles north
- Directional boring in Rio Vista: 8.6 miles south
- Directional boring in Godley: 10.1 miles northwest
- Directional boring in Mansfield: 22.5 miles northeast
What would we bore in Cleburne near Nolan River Road?
- Highway crossing: A route beneath US 67 is bored or tunneled under existing pavement, with the TxDOT Fort Worth District reviewing the utility owner’s permit application.
- Water service: A service near the City of Cleburne system may need a route beneath Main Street, with existing lines exposed before drilling.
- Fiber conduit: A fiber route along Henderson Street needs its path checked for older buried services and marked utilities before the drill approaches.
- Creek crossing: A proposed bore beneath East Buffalo Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: A bore under BNSF Railway or Fort Worth and Western Railroad requires an agreement with the railroad that owns the track.
- Drainage crossing: A route near Nolan River Road may encounter mapped drainage, so the bore plan has to account for local ground and crossing conditions.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for directional boring in Cleburne near Main Street?
For a route near Main Street, start with the address or map pin, then tell us what will go underground, such as a water line or fiber conduit. Give us the pipe or conduit size and footage. A sketch or plans showing the route and nearby crossings help us scope the bore.
The price depends on the route and ground, not only its length. Cleburne’s clay and possible shallow bedrock affect drilling time and reaming; US 67 or railroad crossings add planning and permit work. Creek crossings, exposed utilities, pavement, pits, excavator time and sand backfill also change the scope. Mobilization matters because Cleburne is 244 road miles from Yukon. High profile or emergency work can add requirements.
Questions people ask about boring in Cleburne
Does Trinity Boring Solutions take jobs in Cleburne and Johnson County?
Yes. We take directional boring work across Texas, including Cleburne in Johnson County. Our own crews and vetted partner contractor yards support the work, while customers deal with Trinity from the first call through the bore log. That keeps planning connected when a route runs near US 67 or BNSF Railway.
How old are buried lines near Henderson Street in Cleburne?
Cleburne’s median housing year is 1981, according to the American Community Survey 2019 to 2023 five year estimates. The mix of older homes and later construction means a replacement route near Henderson Street may meet utilities from different periods. We use Texas811 marks and potholing to verify marked line locations before drilling near them.
Does Ponder soil in Cleburne corrode steel, and what pipe can be used?
The USDA soil survey maps high steel corrosion risk across 76 percent of Cleburne. That is relevant to steel casing and tracer wire near Ponder soil; the line owner chooses any coating. On Cleburne alignments, we know HDPE is not affected by soil corrosion, and we plan the bore around that material fact. The material and protection plan should match the line owner’s requirements for the route.
What ground does a bore go through in Cleburne around Ponder soil?
The USDA soil survey maps Ponder soil across 24 percent of Cleburne. At about 40 inches, clay is mapped across 39 percent of the area and silty clay across 21 percent, with average clay content of 43 percent. Sticky clay can collect on a reamer, so fluid control and staged reaming matter.
How much bedrock is mapped within five feet in Cleburne?
The USDA soil survey maps bedrock within 60 inches in 21 percent of Cleburne. Hard bedrock is mapped in 14 percent and weathered bedrock in 7 percent, with a typical depth of 26 inches. These mapped patterns can guide planning, but the ground along a specific Nolan River Road bore still needs site review.
Which authority approves a bore under US 67 in Cleburne for this crossing?
The utility owner files for a TxDOT utility permit through RULIS, and the TxDOT Fort Worth District reviews it. For the owner’s Cleburne application, we provide the bore plan and profile needed to describe the proposed crossing. For US 67, the required cover depends on the line type, and the permit can specify a different depth.
Does being near Mansfield change the cost of a Cleburne bore?
Mobilization is one factor because Cleburne is 244 road miles from our Yukon, Oklahoma main office, even though Mansfield is 22.5 miles northeast of Cleburne. The route, soil, pipe size, crossings, access and any pavement or creek work also shape the scope. A map pin near East Buffalo Creek helps us review those details.
How much notice does Texas811 need for a bore near Main Street in Cleburne?
For a bore near Main Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. If a Cleburne start moves more than 14 days past the original notice, we submit a new request before scheduling the bore. Before work continues in Cleburne, we arrange for worn or moved marks to be refreshed through Texas811.
What affects the price of a directional bore under US 67 in Cleburne?
The route length and pipe size matter, along with Cleburne’s clay or bedrock, exposed utilities, pavement, pits and creek crossings. A US 67 crossing adds permit and cover planning, while a railroad or East Buffalo Creek crossing changes the work plan. Mobilization from Yukon also factors into the job. We price the actual scope, not a single standard route.
Where the Cleburne facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Cleburne
- U.S. Census Bureau, TIGER/Line 2024: Cleburne boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Cleburne
- U.S. Census Bureau, American Community Survey 2019 to 2023: Cleburne housing units and year built
- Macrostrat geologic map compilation: map units under Cleburne
- U.S. EPA Safe Drinking Water Information System: public water systems serving Cleburne
- U.S. Department of Transportation, North American Rail Network: track owners in Johnson County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Johnson County
- U.S. Geological Survey, Elevation Point Query Service: Cleburne elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Cleburne
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Cleburne
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Cleburne, Texas
Type the address of your job in Cleburne. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Cleburne
Same county: Burleson · Venus · Alvarado · Pecan Plantation · Grandview · Briaroaks · Cross Timber · Cresson · The Homesteads. All counties: Texas county list.
