Wake Village Texas Directional Boring: Eylau Soil, Howard Creek And US 67
Quick Answer: City of Wake Village owns the water system, while electric providers reporting in Bowie County vary by address, so a US 67 conduit bore starts by identifying the line owners. We take directional boring, also called horizontal directional drilling (HDD), for lines crossing US 67 in Wake Village, Texas. The 324 road miles from our Yukon, Oklahoma main office matter for work along Greenfield Drive. Eylau soil and sandy clay loam below the surface can grip a reamer, so we plan the fluid and pull timing around that ground.
Wake Village bores at a glance
- Incorporated city in Bowie County, Texas. Population 5,813 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 324 miles, about 6.3 hours of driving.
- Ground: Eylau soil is mapped on 52 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 67, FM 2148 and FM 989. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: Texas Northeastern Railroad, with 1 mapped street and rail crossings.
- Named streams inside the boundary: Howard Creek.
- Public water: City of Wake Village, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Howard Creek in Wake Village?
City of Wake Village owns the public water system, and electric service providers reporting in Bowie County include Southwestern Electric Power, Bowie Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. We confirm the owner before planning a conduit bore near Howard Creek or along Greenfield Drive. The Census Bureau Vintage 2024 estimate puts Wake Village at 5,813 residents, with water, sewer, gas, electric conduit and fiber work possible on local routes.
Our main office is in Yukon, Oklahoma, and Wake Village work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started directional boring in 1982, so four decades of work informs how we approach Eylau soil and the wet ground around Howard Creek. Trinity Boring Solutions is a family business that began in 1965, and you work with us from the first call to the bore log on Greenfield Drive.

How does Eylau soil affect a bore in Wake Village?
The USDA soil survey maps Eylau series soils across 52 percent of Wake Village, including Eylau very fine sandy loam on 36 percent and Eylau Urban land complex on 16 percent. At about 40 inches below the surface, sandy clay loam is mapped under 55 percent of the city and clay under 33 percent. We account for average clay content of 32 percent at that depth when planning boring work in Wake Village. Those mapped textures mean a bore near Greenfield Drive may meet sticky ground that holds its shape but can build up on a reamer and grip pipe.
| USDA soil survey, inside the Wake Village city limits | What is mapped |
|---|---|
| Soil series mapped | Eylau 52 percent, Sawyer 14 percent, Sacul 13 percent, Annona 6 percent and Amy 5 percent |
| Texture at the surface | very fine sandy loam 52 percent, silt loam 23 percent and fine sandy loam 17 percent |
| Texture about 40 inches down | sandy clay loam 55 percent, clay 33 percent and loam 5 percent |
| Engineering class about 40 inches down | lean clay (CL) 57 percent, fat clay (CH) 33 percent and silt (ML) 8 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 90 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 94 percent of the area |
Bedrock is not mapped in the top five feet of Wake Village, but the Wilcox Group, undivided, is mapped below, with a Thanetian age and mudstone, sandstone, conglomerate and lignite. Seasonal water table conditions are mapped within 40 inches across 90 percent of the area, so pits near Howard Creek may need pumping. Flood prone soils cover 7 percent, while high steel corrosion risk covers 94 percent. The line owner should address steel casing or tracer wire protection; a bore plan also needs to account for wet pits and fluid returns.
What does it take to bore sandy clay loam in Wake Village?
The USDA soil survey maps sandy clay loam under much of Wake Village at about 40 inches. Along Greenfield Drive, we adjust the reaming sequence and fluid to keep sticky soil from loading the tool or gripping the pipe.
- With sandy clay loam mapped under 55 percent of Wake Village at about 40 inches, we use staged reaming and manage fluid so sticky soil does not load the tool.
- Because clay is mapped under 33 percent of the city at that depth, we plan the pull soon after opening the bore to limit the chance of soil gripping pipe.
- Seasonal water table conditions reach within 40 inches across 90 percent of Wake Village, so pits near Howard Creek may need to be kept small and pumped.
- Before drilling near a marked utility on Arizona Avenue, we expose it with hydrovac potholing; a walkover locator tracks the head while we log depth and pitch.

Which roads, tracks or creeks can we bore across near US 67 in Wake Village?
US 67, FM 2148 and FM 989 run inside Wake Village, and US 59 touches or follows the city limits. US 82 is 0.6 miles away, while Interstate 30 and Loop 151 are each 1.2 miles outside the limits. Greenfield Drive runs 1.7 miles in the city, Redwater Road 1.44 miles and Arizona Avenue 1.37 miles. A bore near these routes needs a path that fits the road and utility layout; the highway right of way has separate state review.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 1.3 roadway miles inside | State highway office |
| FM 2148 | State highway | 1 roadway miles inside | State highway office |
| FM 989 | State highway | 0.9 roadway miles inside | State highway office |
| US 59 | Highway nearby | Runs along or touches the city limits | State highway office |
| US 82 | Highway nearby | 0.6 miles outside | State highway office |
| Interstate 30 | Highway nearby | 1.2 miles outside | State highway office |
| Loop 151 | Highway nearby | 1.2 miles outside | State highway office |
| Texas Northeastern Railroad | Railroad | 0.71 track miles inside | The railroad |
| Union Pacific (line shown as out of service) | Railroad nearby | 0.2 miles outside | The railroad |
| Dallas, Garland and Northeastern Railroad | Railroad nearby | 0.5 miles outside | The railroad |
| Howard Creek | Stream | 0.51 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Waggoner Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Wagoner Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Aiken Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
The Texas Northeastern Railroad has 0.71 track miles in Wake Village, including the Texarkana Subdivision, and one mapped street and rail crossing. Howard Creek has 0.51 channel miles inside the city, with three mapped street crossings of named streams. Waggoner Creek and Wagoner Creek are each 0.1 miles outside the limits. The railroad owner must agree to a track crossing, and a creek route near Howard Creek needs a jurisdiction check during planning.
Who signs off on a bore in Wake Village and Bowie County?
US 67, FM 2148 and FM 989 are state routes, so work in their right of way goes through TxDOT’s Atlanta District. The utility that owns the line submits the utility permit application in TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the permit issued to that owner. Since Wake Village is incorporated, we treat its city streets as belonging to the city itself. A Texas Northeastern Railroad crossing needs an agreement with the railroad, and a proposed crossing of Howard Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are already in the ground in Wake Village, and how does City of Wake Village affect boring?
The City of Wake Village public water system uses purchased surface water and reports 2,705 service connections serving 5,945 people. That network matters when a new service or a crossing near Greenfield Drive is laid out. Electric providers reporting service in Bowie County are Southwestern Electric Power, Bowie Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. Their service can vary by address, so the line owner is confirmed before a conduit bore near US 67.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Wake Village | Public water system | Surface water bought from another system | 2,705 connections, 5,945 people served |
| Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative | Electric utilities reporting service in Bowie County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Wake Village’s median housing year at 1985; 78 percent of homes date from 1960 to 1999, 9 percent from before 1960 and 13 percent from 2000 or later. That mix can mean replacement work as well as new services along Arizona Avenue. We expose every marked utility with hydrovac potholing before drilling near it, since surface marks do not show burial depth.

What is near Wake Village and how far is Texarkana?
Wake Village is an incorporated city in Bowie County, at an elevation of 352 feet and covering 2.99 square miles. Its ZIP code is 75501. Nash is 1.7 miles north, Texarkana is 3.0 miles northeast, Red Lick is 4.7 miles northwest, Leary is 5.7 miles northwest and Redwater is 8.7 miles southwest. Texarkana is the nearest larger city, while New Boston, the Bowie County seat, is 17.0 miles west. From our Yukon yard, the road trip is 324 miles and 6.3 hours.
Places near Wake Village
- Directional boring in Nash: 1.7 miles north
- Directional boring in Texarkana: 3 miles northeast
- Directional boring in Red Lick: 4.7 miles northwest
- Directional boring in Leary: 5.7 miles northwest
- Directional boring in Redwater: 8.7 miles southwest
Which jobs call for a bore near Arizona Avenue in Wake Village?
- Highway crossing: A line under US 67 needs a planned route through the right of way and review by TxDOT’s Atlanta District.
- Water service: A service near Greenfield Drive can connect to the City of Wake Village system after the existing water line is exposed and verified.
- Fiber conduit: A conduit bore along Arizona Avenue can avoid cutting the street while marked utilities are exposed before drilling.
- Creek crossing: A route beneath Howard Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: A bore at the Texas Northeastern Railroad track needs an agreement with the railroad owner before the crossing is planned.
- Street crossing: A bore beneath Redwater Road can leave the pavement uncut, with pits placed in the dirt on either side.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a bore near Greenfield Drive in Wake Village?
For a Greenfield Drive quote, send the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. We use those details to trace the proposed route against the street, mapped utilities and any nearby creek or highway crossing in Wake Village. That gives us a useful scope to review before discussing the work.
The 324 road miles from Yukon affect mobilization for a Greenfield Drive job. Eylau soil and the mapped seasonal water table can change the drilling approach, while a crossing of US 67 or the Texas Northeastern Railroad adds coordination. Price also reflects bore length, line size, utilities to expose, pavement, pits, excavator time and sand backfill. A Howard Creek crossing or emergency schedule can change the scope as well.
Questions people ask about boring in Wake Village
Does Trinity Boring Solutions take directional boring jobs in Wake Village, Bowie County?
Yes. We take directional boring work in Wake Village, with our own crews and partner drilling contractors from satellite yards we have vetted. Our Yukon, Oklahoma main office remains your point of contact from the first call to the bore log. We can review a proposed route near Greenfield Drive or US 67.
Will groundwater or flood prone ground near Howard Creek cause trouble for a Wake Village bore pit?
It can affect the pit plan. The USDA soil survey maps seasonal water table conditions within 40 inches across 90 percent of Wake Village, and flood prone soils across 7 percent. Near Howard Creek, we plan pit placement and pumping around wet ground and check creek crossing jurisdiction during planning.
Does Eylau soil in Wake Village corrode steel, and what pipe can I use?
The USDA soil survey maps high steel corrosion risk across 94 percent of Wake Village, including areas with Eylau soil. For boring work in Wake Village, we recognize the line owner selects any coating for steel casing or tracer wire. HDPE is not subject to that soil corrosion concern, and the right choice depends on the line and project requirements along routes such as Arizona Avenue.
What ground does a bore pass through in Eylau soil areas of Wake Village?
Eylau series soils cover 52 percent of Wake Village. At about 40 inches below the surface, sandy clay loam is mapped under 55 percent and clay under 33 percent. That ground can hold an open hole but stick to a reamer, so a bore near Greenfield Drive may need staged reaming and a controlled pull.
Will a Wake Village bore hit rock near Howard Creek?
Bedrock is not mapped in the top five feet of Wake Village, which does not rule out rock at greater depth. The geologic map shows the Wilcox Group, undivided, with mudstone, sandstone, conglomerate and lignite. We use site conditions along Howard Creek to guide the bore plan rather than treating the map as a test boring.
Who approves a Wake Village bore under US 67, and which state office reviews it?
TxDOT’s Atlanta District reviews utility work in the US 67 right of way. The utility owner files the application through TxDOT’s online RULIS system, while we provide the bore plan and profile for the owner’s filing. A bore beneath existing highway pavement is installed by boring or tunneling, with cover and casing addressed in the permit.
Can I reach someone after hours for an urgent bore near Arizona Avenue in Wake Village?
Yes. A person answers Trinity Boring Solutions’ phone at (405) 409-7423 24 hours a day. Tell us where the issue is near Arizona Avenue and what line is involved so we can understand the urgent scope. We also provide 24 hour emergency response for work in Wake Village.
How early should I call Texas811 for a Wake Village bore on Greenfield Drive, and what if marks move?
The Texas811 locate request for a Greenfield Drive bore must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Wake Village start moves more than 14 days past the original notice, we submit a new request. Before continuing work in Wake Village, we refresh worn or moved marks through Texas811.
What affects the cost of our directional bore under US 67 in Wake Village?
The price depends on the job scope, including bore length and line size, Eylau soil conditions, utilities to expose, pavement, pits and any creek or railroad crossing. A US 67 route can require additional permit coordination, and the 324 road miles from Yukon affect mobilization. Emergency timing can also change the work plan.
Where the Wake Village facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Wake Village
- U.S. Census Bureau, TIGER/Line 2024: Wake Village boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Wake Village
- U.S. Census Bureau, American Community Survey 2019 to 2023: Wake Village housing units and year built
- Macrostrat geologic map compilation: map units under Wake Village
- U.S. EPA Safe Drinking Water Information System: public water systems serving Wake Village
- U.S. Department of Transportation, North American Rail Network: track owners in Bowie County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bowie County
- U.S. Geological Survey, Elevation Point Query Service: Wake Village elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Wake Village
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Wake Village
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Wake Village, Texas
Type the address of your job in Wake Village. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Wake Village
Same county: New Boston · Hooks · De Kalb · Maud. All counties: Texas county list.
