trinityboringsolutions.com

Wickett Texas Directional Boring: Soil, Interstate 20, Union Pacific Track

Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines beneath Interstate 20 and Wickett streets. Our Yukon, Oklahoma main office is 493 road miles from Wickett, where FM 1219 and Spur 57 shape local route planning. USDA mapping shows Wickett soil and gravelly loam at about 40 inches across 57 percent of the area, so loose ground calls for staged reaming and a supported hole.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Wickett bores at a glance

  • Incorporated city in Ward County, Texas. Population 427 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 493 miles, about 9.5 hours of driving.
  • Ground: Wickett soil is mapped on 57 percent of the area, with gravelly loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 20, FM 1219 and Spur 57. State permit office: TxDOT Odessa District.
  • Railroad track inside the boundary: Union Pacific, with 1 mapped street and rail crossings.
  • Public water: City of Wickett, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Wickett, Ward County?

We take directional boring work in Wickett, Ward County, where the Census Bureau Vintage 2024 estimate puts the population at 427. Along 1st Street, 4th Street or 6th Street, our crews can install water, sewer, gas, electric conduit or fiber by boring beneath pavement rather than opening a trench across the route.

Our main office is in Yukon, Oklahoma, and Wickett work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, a record we bring to planning near the City of Wickett water system and electric lines reported in Ward County. Our family business began in 1965, and our directional boring experience dates to 1982, supporting work planned for Wickett.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Wickett soil like to bore through in Wickett?

The USDA soil survey maps Wickett soil across 57 percent of Wickett and Pyote soil across 43 percent. At about 40 inches below the surface, gravelly loam is mapped under 57 percent of the area, while fine sandy loam is mapped under 43 percent. The survey also maps loamy fine sand as the surface texture across 84 percent and fine sandy loam across 16 percent. In Wickett, these mapped patterns guide our planning, but they are not test borings. Sand and gravelly ground can cut easily but may cave behind the drill head, so the hole needs support and staged reaming.

USDA soil survey, inside the Wickett city limitsWhat is mapped
Soil series mappedWickett 57 percent and Pyote 43 percent
Texture at the surfaceloamy fine sand 84 percent and fine sandy loam 16 percent
Texture about 40 inches downgravelly loam 57 percent and fine sandy loam 43 percent
Engineering class about 40 inches downsilty clay (CL ML) 57 percent and silty sand (SM) 43 percent
Average clay content about 40 inches down12 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet of Wickett, but that does not rule out rock deeper down. Seasonal water table, flood prone soils and high steel corrosion risk are not mapped in the surveyed area. That points to fewer mapped concerns from wet pits, channel flooding or corrosive soil, though the actual route still needs review. The geologic map shows Holocene sand sheet deposits and Paleocene Cenozoic sedimentary rocks. Windblown sand can be loose, so the drilling plan needs to account for keeping the hole open.

What does it take to bore Wickett’s gravelly loam?

Wickett’s mapped gravelly loam and loamy fine sand favor a supported bore rather than an open hole left waiting. We set up the route and pipe before the final ream so the ground has less time to cave.

  1. Wickett’s mapped loamy fine sand can fall in behind the bit, so we support the hole with drilling fluid and stage the reaming rather than opening it all at once.
  2. With gravelly loam mapped at about 40 inches across 57 percent of Wickett, we keep the pipe ready before the final ream to limit the time an open hole can cave.
  3. Near 1st Street or FM 1219, we track the drill head from the surface and log depth and pitch as the bore advances.
  4. For a route near older services on 4th Street, we hydrovac pothole marked utilities on the bore path before drilling close to them.
6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing at NE 24th Street, Oklahoma City
A 6 inch Schedule 40 PVC sleeve in a bore pit in sandy soil on a water main crossing in Oklahoma City.

Where does a Wickett line have to go under Interstate 20?

Interstate 20, FM 1219 and Spur 57 are the main mapped highway routes within Wickett, so a bore may need to pass beneath a highway or connect service across town. Interstate 20 has 0.4 mapped roadway miles inside town limits; FM 1219 has 1.1 and Spur 57 has 0.6. The longest named streets are 1st Street at 1.2 miles, 4th Street at 1.14 miles and 6th Street at 1.0 mile. A bore can leave those paved routes uncut, with entry and exit pits placed off the travel surface where the site allows.

CrossingTypeMapped extentWho has a say
Interstate 20Interstate0.4 roadway miles insideState highway office
FM 1219State highway1.1 roadway miles insideState highway office
Spur 57State highway0.6 roadway miles insideState highway office
Union PacificRailroad0.6 track miles insideThe railroad
Swipe the table sideways to see every column.

Union Pacific has 0.6 track miles within Wickett on the Union Pacific Toyah Subdivision, and public mapping shows one street and rail crossing in town. A route near that track needs coordination for a railroad crossing agreement. No streams are mapped in town or within one mile, and none of the mapped street crossings is over a named stream. No lakes or ponds are mapped within one mile, so no nearby water crossing is identified from these records.

Who signs off on a Wickett bore near Union Pacific track?

For a Wickett bore in Interstate 20, FM 1219 or Spur 57 right of way, the line owner applies for the TxDOT utility permit through RULIS, and the TxDOT Odessa District reviews it. Electric and communication crossings need at least 60 inches of cover below the lowest crossed grade; water crossings need 60 inches, and pressurized sewer crossings need 60 inches. TxDOT rules call for boring or tunneling beneath existing highway pavement, encasement at crossings and a bore extending beneath all travel lanes on rural highways. Union Pacific track work needs an agreement with the railroad that sets crossing conditions. No stream or lake crossing is mapped in Wickett.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Wickett water system?

The City of Wickett public water system uses groundwater wells and has 294 service connections serving 567 people. For electric work in Ward County, Oncor Electric Delivery Company and Texas-New Mexico Power report service, but the line owner must be confirmed for the address before a conduit bore is planned. Those records help frame work near 1st Street or FM 1219, but they do not identify the electric provider at every Wickett property.

Line ownerWhat it isSourceSize
City of WickettPublic water systemGroundwater wells294 connections, 567 people served
Oncor Electric Delivery Company and Texas-New Mexico PowerElectric utilities reporting service in Ward CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Wickett’s median housing year at 1970; 29 percent of units were built before 1960, 60 percent from 1960 to 1999 and 11 percent in 2000 or later. A replacement route near 4th Street may encounter older buried services, while a new connection still needs a clear path. Before drilling near marked lines, we use hydrovac potholing to expose them; paint shows location, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Wickett and nearby Southwest Sandhill?

Wickett is an incorporated town in Ward County, at an elevation of 2,657 feet and covering 0.7 square miles. The town’s ZIP code is 79788. Thorntonville is 5.0 miles east, Southwest Sandhill is 5.9 miles east, Pyote is 7.2 miles west and Monahans is 7.6 miles northwest. Monahans is both the nearest larger city and the Ward County seat. Wickett is 493 road miles and a 9.5 hour drive from our Yukon, Oklahoma main office, which affects how we plan crew travel and mobilization for a job near Interstate 20.

Places near Wickett

What would we bore near Wickett’s 1st Street?

  • Highway crossing: A bore under Interstate 20 can carry water or conduit beneath the paved route without cutting across its travel lanes.
  • Street service: A water or sewer connection near 1st Street can pass beneath pavement, with entry and exit pits set in accessible ground.
  • Rail crossing: Work near the Union Pacific Toyah Subdivision needs a crossing plan coordinated with the railroad before the bore proceeds.
  • Water connection: A service route near the City of Wickett system can be planned around the groundwater well network and existing connections.
  • Utility conduit: A fiber or electric conduit route near FM 1219 starts with confirming the line owner and locating marked services.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Wickett’s 2nd Street?

For a Wickett quote, we need the job address or map pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help show whether the route is near 2nd Street, FM 1219 or the Union Pacific track. With those details, we can review the route, crossings and access before setting the work scope.

A short, direct service route near the City of Wickett water system may be simpler to plan than a long bore near Interstate 20 or Union Pacific track. Price depends on footage, pipe size, soil, exposed utilities, pavement, crossing conditions, pits, excavator time and backfill. Wickett’s gravelly loam can affect reaming and hole support. The 493 road miles from Yukon also affect mobilization, while highway or rail coordination can add planning steps.

Questions people ask about boring in Wickett

Does Trinity Boring Solutions take directional boring jobs in Wickett, Ward County?

Yes. We take directional boring work in Wickett, Ward County, and staff it with our own crews or from vetted partner contractor satellite yards. Our Yukon main office coordinates the job, and you work with Trinity from the first call through the bore log, whether our crew or a partner crew is on site.

Who controls Wickett’s 6th Street, and does a bore need to cut it?

Wickett is incorporated, so its city streets belong to the town itself. A bore near 6th Street can pass beneath the pavement rather than requiring an open cut across the street. The route and entry pit locations still need to fit the property and the specific work plan.

What do Wickett’s older homes near 4th Street mean for replacement bores?

Wickett’s median housing year is 1970, and the American Community Survey 2019 to 2023 estimates say 29 percent of units were built before 1960. Older homes can mean a replacement route must account for existing buried services near streets such as 4th Street. In Wickett, we expose marked utilities before drilling near them to protect the planned bore path.

What ground does a bore pass through in Wickett soil?

The USDA soil survey maps Wickett soil across 57 percent of town, with gravelly loam mapped under 57 percent at about 40 inches. Sand and gravelly ground can drill readily but may cave behind the bit. We support the hole and use staged reaming to manage that mapped ground.

Will a Wickett bore hit rock below the sand sheet deposits?

Although bedrock is not mapped in Wickett’s top five feet, we plan for the possibility of deeper rock. The geologic map shows Holocene sand sheet deposits and Paleocene Cenozoic sedimentary rocks. The mapped information helps with planning, but it is not a test boring at a particular address.

Who approves a Wickett bore under Interstate 20?

For Interstate 20 right of way, the utility owner submits the TxDOT permit application through RULIS, and the TxDOT Odessa District reviews it. We prepare the bore plan and profile for the utility owner’s application and work under the permit issued to that owner. The permit sets the project conditions, including the required cover.

Can I call Trinity after hours about an urgent bore near Wickett’s 6th Street?

Yes. Trinity answers the phone 24 hours a day at (405) 409-7423. If the urgent work is near 6th Street, share the location and what line needs attention so we can understand the route and response needs.

How much notice does Texas811 need before a bore near Wickett’s 1st Street?

Texas law requires a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For a route near 1st Street, paint shows position, not depth. If the start slips more than 14 days past the original notice, request a new ticket; worn or moved marks must be refreshed through Texas811 before work continues.

What affects the price of a directional bore under Interstate 20 in Wickett?

Price depends on the route length, pipe or conduit size, soil, utilities to expose, pavement, pits and backfill, along with any highway coordination. Wickett’s mapped gravelly loam can affect drilling and hole support, and Interstate 20 work needs a permit plan. The 493 road miles from Yukon shape our mobilization planning for directional boring in Wickett.

Where the Wickett facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Wickett

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Wickett, Texas

Type the address of your job in Wickett. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Wickett

Same county: Grandfalls · Barstow. All counties: Texas county list.