Aledo Texas Directional Boring: Denton Clay, FM 1187 And Union Pacific
Quick Answer: For a line routed near the Clear Fork Trinity River, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Aledo, Texas. The Union Pacific Baird Subdivision is one local crossing to plan around. Aledo is 230 road miles from our Yukon, Oklahoma main office, so a route along Underwood Road factors into mobilization. Denton soil is common here, and its clay can hold the hole open but cling to a reamer and pipe.
Aledo bores at a glance
- Incorporated city in Parker County, Texas. Population 6,655 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 230 miles, about 4.6 hours of driving.
- Ground: Denton soil is mapped on 28 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 84 percent of the area.
- Highways inside the boundary: FM 1187, FM 5 and FM 2376. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Clear Fork Trinity River.
- Public water: City of Aledo, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near the Clear Fork Trinity River in Aledo?
Trinity Boring Solutions handles directional boring in Aledo, Parker County, including routes near the Clear Fork Trinity River. Denton clay holds a bore open, but its stickiness can slow reaming and pullback. The Census Bureau Vintage 2024 estimate puts Aledo at 6,655 people. We install water, sewer, gas, electric conduit and fiber lines along routes such as FM 1187 and Front Street.
Our main office is in Yukon, Oklahoma, and Aledo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Aledo projects, we are a family business that began in 1965 and has handled directional boring since 1982. Our 3/4 inch service line to 48 inch casing range can suit a replacement beneath Front Street or a longer route near the Union Pacific track.

What kind of ground should a bore expect in Aledo near Denton soil?
Aledo has Denton soil and clay rich ground that can hold an open bore but stick to the tools. The USDA soil survey maps Denton soil across 28 percent of the city. Clay makes up 39 percent of mapped surface texture, with clay loam at 34 percent. About 40 inches down, bedrock is mapped across 54 percent of the area and silt loam across 30 percent. When reviewing Aledo soil survey patterns, we treat them as survey information, not as test borings for boring plans. We plan the bore around the route and confirm actual conditions as work proceeds.
| USDA soil survey, inside the Aledo city limits | What is mapped |
|---|---|
| Soil series mapped | Denton 28 percent, Bolar 16 percent, Brackett 13 percent, Aledo 13 percent and Venus 10 percent |
| Texture at the surface | clay 39 percent, clay loam 34 percent and gravelly clay loam 13 percent |
| Texture about 40 inches down | bedrock 54 percent, silt loam 30 percent and loam 7 percent |
| Engineering class about 40 inches down | lean clay (CL) 40 percent and fat clay (CH) 6 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | 84 percent of the area (68 percent hard rock, 16 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 17 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 84 percent of Aledo, with typical depth at 32 inches. Hard bedrock is mapped within that depth across 68 percent, so the soil to rock change can steer the head off line. No seasonal water table is mapped within 60 inches; flood prone soils cover 4 percent. High steel corrosion risk is mapped across 17 percent, which can affect steel casing or tracer wire choices. The Walnut Clay unit, of Albian age, includes clay, limestone and shale, so a route may shift from sticky soil to slower rock drilling.
What does it take to bore Aledo ground with bedrock near the surface?
For Aledo’s Denton clay and shallow mapped bedrock, we match the tooling and fluid plan to the ground on each route. The change from clay to rock can push the drill head off line, so we track it as the bore advances.
- Denton clay can cling to the reamer, so we use staged reaming and plan to pull pipe the same day the hole is opened.
- Where the Aledo survey maps hard bedrock within 60 inches, we allow for slower rock drilling and check the head at the soil to rock transition.
- Before drilling near a marked line along Old Annetta Road, we expose it with hydrovac potholing; surface paint does not show depth.
- At a route near the Clear Fork Trinity River, we track the drill head from the surface and log depth and pitch as the bore progresses.

What is in the way of a new line in Aledo near Underwood Road?
Aledo routes may meet FM 1187, FM 5 or FM 2376, while Interstate 20 lies 0.8 miles outside the city limits. FM 1187 has 3.9 mapped roadway miles inside the city. Underwood Road is the longest named street at 1.55 miles, followed by Old Annetta Road at 1.08 miles and Front Street at 0.91 miles. A bore beneath existing highway pavement is installed by boring or tunneling, leaving the road surface uncut. The street and highway owner affects the crossing plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1187 | State highway | 3.9 roadway miles inside | State highway office |
| FM 5 | State highway | 0.6 roadway miles inside | State highway office |
| FM 2376 | State highway | 0.2 roadway miles inside | State highway office |
| Interstate 20 | Highway nearby | 0.8 miles outside | State highway office |
| Union Pacific | Railroad | 1.86 track miles inside | The railroad |
| Clear Fork Trinity River | Stream | 0.09 channel miles inside | Checked for Corps of Engineers jurisdiction |
| South Fork Trinity River | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Turkey Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Mullet | Lake or pond | 101 acres, nearby | Checked for Corps of Engineers jurisdiction |
The Union Pacific Baird Subdivision has 1.86 track miles in Aledo, and public mapping shows 2 street and rail crossings. The Clear Fork Trinity River has 0.09 channel miles inside the city, with no mapped street crossings of named streams. The South Fork Trinity River is 0.1 miles from the city limits, and Turkey Creek is 0.8 miles away. Lake Mullet lies within one mile outside the limits. A route near a water crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Who has to sign off on an Aledo bore near Union Pacific track?
For work along FM 1187, FM 5 or FM 2376, the utility owner applies for a TxDOT right of way permit through RULIS, and the TxDOT Fort Worth District reviews it. We prepare the bore plan and profile for the utility owner’s application and work under its permit. TxDOT rules call for boring or tunneling beneath existing highway pavement; the permit can set cover requirements for the line type. A crossing of the Union Pacific Baird Subdivision calls for an agreement with the railroad owner, which sets crossing conditions. A Clear Fork Trinity River crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Aledo water system?
The City of Aledo public water system uses purchased surface water and reports 2,149 service connections serving 5,521 people. Electric service reported in Parker County includes Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri County Electric Cooperative and Wise Electric Cooperative. Those reports do not identify the line owner at every address, so we confirm the owner before a conduit bore near Bailey Ranch Road or another local route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Aledo | Public water system | Surface water bought from another system | 2,149 connections, 5,521 people served |
| Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative | Electric utilities reporting service in Parker County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Aledo’s median housing year at 2010; 72 percent of housing units date from 2000 or later, and 1 percent were built before 1960. That mix can mean a new service route as well as replacement of older buried lines. Paint shows a marked utility’s position, not its depth, so we hydrovac pothole each marked line on the bore path before drilling near it. For example, a proposed line beneath Front Street needs its marked utilities exposed first.

What is near Aledo, including Annetta North?
Aledo is an incorporated city in Parker County at an elevation of 876 feet, with 2.87 square miles inside its limits and ZIP code 76008. Annetta South is 1.8 miles south, Annetta North is 2.2 miles northwest, and Annetta is 3.6 miles west. Willow Park lies 4.6 miles northwest. Benbrook, the nearest larger city, is 8.5 miles east; county seat Weatherford is 10.2 miles west. Aledo is 230 road miles and a 4.6 hour drive from our Yukon, Oklahoma main office, which affects mobilization for work near FM 1187.
Places near Aledo
- Directional boring in Annetta South: 1.8 miles south
- Directional boring in Annetta North: 2.2 miles northwest
- Directional boring in Annetta: 3.6 miles west
- Directional boring in Willow Park: 4.6 miles northwest
- Directional boring in Hudson Oaks: 6.5 miles northwest
- Directional boring in Benbrook: 8.5 miles east
What boring work comes up in Aledo near Old Annetta Road?
- Highway crossing: A line beneath FM 1187 is planned as a bore under the roadway, with the utility owner handling the TxDOT permit.
- Street service: A water or sewer service along Front Street can pass beneath pavement without cutting the street surface.
- Rail crossing: A route crossing the Union Pacific Baird Subdivision needs a plan that follows the railroad’s crossing agreement.
- Creek crossing: A proposed line near the Clear Fork Trinity River is checked for Corps jurisdiction during planning.
- Fiber conduit: A conduit route along Underwood Road is mapped against marked utilities before the drill approaches them.
- Water service: A connection near the City of Aledo system needs its route and existing lines checked before boring begins.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Aledo work near Bailey Ranch Road?
For a bore near Bailey Ranch Road, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. Include the route if it approaches FM 1187, the Union Pacific track or a drainage crossing. Those details show what access and crossing work the plan needs.
The trip from Yukon is 230 road miles, so mobilization matters for an Aledo job. Denton clay and the shallow mapped bedrock can change tooling and drilling time. A route across FM 1187 or the Union Pacific track brings different crossing planning, while creek or drainage work may call for added planning and equipment. Pipe size, bore length, exposed utilities, pavement, pits, excavator time and sand backfill also shape the scope. High profile or emergency work can add requirements.
Questions people ask about boring in Aledo
Does Trinity Boring Solutions take directional boring work in Aledo, Parker County, and how are crews assigned?
Yes. We take directional boring work in Aledo, Parker County, and manage the job from the first call through the bore log. Our own crews and satellite yards run by drilling partners we have vetted can staff the work. The Union Pacific track or a local street crossing is planned for the specific route.
Who runs Aledo’s public water system, and does it use purchased surface water?
The City of Aledo owns the public water system, so we account for purchased surface water in boring plans. Public records report 2,149 service connections and 5,521 people served. For a proposed bore near Bailey Ranch Road, the service connection and nearby buried lines still need to be located on the actual route.
Which electric companies report service in Aledo, Parker County, and who confirms conduit requirements?
Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri County Electric Cooperative and Wise Electric Cooperative report electric service in Parker County. These county reports do not show which provider owns a line at every Aledo address. We confirm the line owner and conduit requirements before planning a bore near FM 1187.
Who controls Aledo streets such as Front Street, and can a bore avoid cutting pavement?
Because Aledo is incorporated, we treat city streets as city owned when planning boring work and street coordination. Directional boring can place a line beneath Front Street without opening a trench through the pavement. The route still needs planning around marked utilities, and any street or highway right of way conditions must be addressed for the work.
What do Aledo homes near Old Annetta Road suggest about replacement bores and buried line age?
The American Community Survey 2019 to 2023 estimates give Aledo a median housing year of 2010, with 1 percent of units built before 1960 and 72 percent from 2000 onward. A replacement bore near Old Annetta Road may meet older lines beside newer services, so marked utilities on the path are exposed before drilling near them.
What ground does a bore cross in Aledo, including Denton soil?
Denton soil is mapped across 28 percent of Aledo, and clay makes up 39 percent of mapped surface texture. About 40 inches down, bedrock is mapped across 54 percent of the area. Sticky clay can cling to a reamer, and the rock transition can steer the drill head, so conditions along the specific route matter.
What bore sizes and lengths can Trinity handle for work near Bailey Ranch Road in Aledo?
For Aledo boring plans, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near Bailey Ranch Road is scoped by its footage, line size, access and ground. A sketch helps show whether the work approaches streets, utilities or drainage.
How much Texas811 notice is needed for an Aledo bore near Underwood Road, and what if marks change?
For a bore near Underwood Road, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the notice, make a new request. Before work continues in Aledo, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring in Aledo near FM 1187?
The job scope determines the price for work near FM 1187. Aledo’s 230 road miles from Yukon affect mobilization, while Denton clay and shallow mapped bedrock can change drilling time. Pipe size, length, pavement, utility crossings, pits, excavator time, backfill, drainage crossings and emergency conditions also affect what the work requires.
Where the Aledo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Aledo
- U.S. Census Bureau, TIGER/Line 2024: Aledo boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Aledo
- U.S. Census Bureau, American Community Survey 2019 to 2023: Aledo housing units and year built
- Macrostrat geologic map compilation: map units under Aledo
- U.S. EPA Safe Drinking Water Information System: public water systems serving Aledo
- U.S. Department of Transportation, North American Rail Network: track owners in Parker County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Parker County
- U.S. Geological Survey, Elevation Point Query Service: Aledo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Aledo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Aledo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Aledo, Texas
Type the address of your job in Aledo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.