Carter Texas Directional Boring: Paluxy Sand, Carter Creek And FM 51
Quick Answer: FM 51 and Carter Creek are the main mapped crossings in Carter, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for utility routes there. From the Yukon main office, Carter is 215 road miles away, with Hutcheson Hill Road among the routes to plan around. Aledo soil covers 32 percent of the mapped area, while bedrock appears within 40 inches across 56 percent, so the bore plan must account for shallow rock. Carter Creek crossings also call for depth and jurisdiction checks.
Carter bores at a glance
- Unincorporated community in Parker County, Texas. Population 1,637 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 215 miles, about 4.6 hours of driving.
- Ground: Aledo soil is mapped on 32 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 62 percent of the area.
- Highways inside the boundary: FM 51 and Texas State Highway 51. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Carter Creek, Browders Creek, Dobbs Branch and Mc Knight Branch.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Carter Creek in Carter?
Carter Creek and FM 51 are local features we plan around when Trinity Boring Solutions takes directional boring work in Carter, Parker County. The 2020 Census count puts the community at 1,637 people; the Census Bureau does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber, including routes along Hutcheson Hill Road or across Carter Creek.
Our main office is in Yukon, Oklahoma, and Carter work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to plan for ground like Carter’s Paluxy Sand and shallow mapped bedrock. Our family business began in 1965, and we stay involved from the first call through the bore log.

What is Carter ground like to bore through Aledo soil?
The USDA soil survey maps Aledo soil across 32 percent of Carter, with gravelly clay loam surface texture mapped over the same share. Brackett covers 18 percent, Venus 15 percent and Duffau 13 percent. At about 40 inches below the surface, bedrock is mapped across 53 percent, while sandy clay loam accounts for 14 percent and clay loam for 11 percent. Fine sandy loam is mapped at the surface in 17 percent of the community. These are mapped patterns, not test borings, so a route still needs field checks.
| USDA soil survey, inside the Carter mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Aledo 32 percent, Brackett 18 percent, Venus 15 percent, Duffau 13 percent and Krum 4 percent |
| Texture at the surface | gravelly clay loam 32 percent, clay loam 31 percent and fine sandy loam 17 percent |
| Texture about 40 inches down | bedrock 53 percent, sandy clay loam 14 percent and clay loam 11 percent |
| Engineering class about 40 inches down | lean clay (CL) 37 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | 62 percent of the area (39 percent hard rock, 23 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 9 percent of the area |
Bedrock is mapped within 60 inches across 62 percent of Carter, including hard bedrock in 39 percent and weathered bedrock in 23 percent; typical depth is 20 inches. That can slow drilling or shift the head where soil meets rock. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 4 percent, including areas to watch near Carter Creek. High steel corrosion risk is mapped in 9 percent. The Paluxy Sand unit is Aptian and includes sand, clay, sandstone, mudstone and limestone, so conditions can change along a bore.
How do we drill Carter ground with shallow bedrock?
We plan each Carter bore around the USDA map’s shallow bedrock and the Aledo soil pattern. At Carter Creek or a paved road, we set the route and pits to avoid cutting the crossing.
- Aledo soil is mapped across 32 percent of Carter, so we match the fluid and reaming plan to the ground and keep the pipe ready for the pull.
- Bedrock is mapped within 40 inches across 56 percent of Carter; we check depth and pitch as the head approaches a soil to rock contact.
- Before drilling near a marked utility along Hutcheson Hill Road, we expose it with hydrovac potholing because surface marks do not show its depth.
- For a Carter Creek crossing, we track the head from the surface, log depth and pitch, and plan the bore to pass below the channel.

What does a Carter bore have to cross near Hutcheson Hill Road?
FM 51 and Texas State Highway 51 each have 1.5 mapped roadway miles inside Carter, so a route on the highway right of way needs state review. Hutcheson Hill Road is the longest named street at 2.97 miles. Prather Road covers 2.56 miles, and Carter Road covers 2.19 miles. A bore can pass under pavement without opening a trench across it; the entry and exit pits still need suitable ground beside the crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 51 | State highway | 1.5 roadway miles inside | State highway office |
| Texas State Highway 51 | State highway | 1.5 roadway miles inside | State highway office |
| Carter Creek | Stream | 2 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Browders Creek | Stream | 0.65 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Dobbs Branch | Stream | 0.47 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mc Knight Branch | Stream | 0.17 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Woody Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Beene Branch | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Ash Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Clear Fork Trinity River | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Reservoir No 14 | Lake or pond | 8 acres, inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Carter or within one mile outside the mapped community boundary, and no street and rail crossings are mapped. Carter Creek runs 2.0 channel miles here, and the mapped streets cross named streams in two places. Browders Creek, Dobbs Branch and Mc Knight Branch are also present. Reservoir No 14 is an 8 acre pond inside the community. Creek or lake work needs channel depth planning and a jurisdiction check.
Do I need a permit for a Carter bore in Parker County?
Carter has no city government, so street authority rests with Parker County or the state, depending on the road. For work in FM 51 or Texas State Highway 51 right of way, the line owner files the utility permit through TxDOT’s RULIS system; Trinity provides the bore plan and profile, and the TxDOT Fort Worth District reviews it. Highway crossings need the cover set by TxDOT rules, and an existing highway pavement crossing is bored or tunneled. A Carter Creek crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Parker County near Carter?
The water provider for an address near Carter Road has to be confirmed with the county or local water district before a bore is planned; public water records do not identify a provider for Carter specifically. Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri County Electric Cooperative and Wise Electric Cooperative report electric service in Parker County. That countywide list does not identify the owner at every address, so we confirm the line owner before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative | Electric utilities reporting service in Parker County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Carter’s median housing year at 2000; 49 percent of homes date from 1960 to 1999 and 51 percent from 2000 or later. That mix can mean work for replacement lines as well as newer services, but the age of a house does not identify what is underground. Before drilling near a marked line along Carter Road, we hydrovac pothole it to verify its depth and position.

What is near Carter and Springtown?
Carter is an unincorporated community in Parker County, with an elevation of 1,145 feet across 6.43 square miles. Its ZIP codes are 76082 and 76085. Springtown lies 4.9 miles northeast, while Sanctuary is 8.8 miles east and Peaster is 8.9 miles southwest. Weatherford, the county seat and nearest larger city, is 11.5 miles south. From the Yukon, Oklahoma yard, Carter is 215 road miles away and about a 4.6 hour drive, which affects crew mobilization for a bore near FM 51.
Places near Carter
- Directional boring in Springtown: 4.9 miles northeast
- Directional boring in Sanctuary: 8.8 miles east
- Directional boring in Peaster: 8.9 miles southwest
- Directional boring in Reno: 10.3 miles east
- Directional boring in Weatherford: 11.5 miles south
Which jobs call for a bore along Carter Prather Road?
- Highway crossing: A utility route beneath FM 51 needs a bore plan, the line owner’s TxDOT permit and cover that meets the permit conditions.
- Water service: A service near Carter Road needs its address specific water provider confirmed before we plan the route and connection.
- Fiber conduit: A conduit run along Hutcheson Hill Road can use a bore to avoid opening the road surface across the route.
- Creek crossing: A line beneath Carter Creek needs a channel depth plan and a check for U.S. Army Corps of Engineers jurisdiction.
- Residential service: A run near Prather Road can connect a property without trenching the full path, with marked lines exposed before drilling.
- Drainage crossing: A route near Browders Creek needs a bore path that accounts for the mapped channel and local drainage.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a directional boring quote for Carter near FM 51?
For a Carter quote, give us the address or map pin, what will go underground, the pipe or conduit size and the footage. For example, identify whether the route is near FM 51 or Hutcheson Hill Road, whether it carries water or fiber, and how large and long the run is. A sketch or plans can show the crossing and pit locations.
The drive from Yukon is 215 road miles, so mobilization is part of pricing for Carter. The Aledo soil and shallow mapped bedrock can change drilling time, while an FM 51 crossing brings permit and cover requirements. We also consider bore length, pipe size, marked utilities to expose, pavement, Carter Creek or drainage crossings, pit and excavator needs, sand backfill, emergency timing and the work profile.
Questions people ask about boring in Carter
Does Trinity take directional boring work in Parker County near Carter, and who staffs it?
Yes. Trinity takes directional boring work in Carter, Parker County, with its own crews and vetted partner contractor crews working from satellite yards. You deal with Trinity from the first call through the bore log, whichever crew is on site. A Carter Creek crossing or a route along FM 51 can be discussed with the same point of contact.
How much rock is mapped around Carter?
The USDA soil survey maps bedrock within 60 inches across 62 percent of Carter. Hard bedrock is mapped in 39 percent and weathered bedrock in 23 percent. That can affect drilling speed and steering, especially where ground changes near the mapped Paluxy Sand unit; a soil map is not a substitute for checking the actual bore route.
Who approves a bore under FM 51 in Carter?
For work in FM 51 right of way, the utility line owner submits the permit application in TxDOT’s RULIS system, not the drilling contractor. The TxDOT Fort Worth District reviews it. Trinity supplies the bore plan and profile for the owner’s application, and the permit sets the crossing conditions, including required cover.
Can a utility line be bored beneath Carter Creek in Carter?
A bore beneath Carter Creek can be planned, but the route needs a channel depth check and review for U.S. Army Corps of Engineers jurisdiction. The creek runs 2.0 channel miles inside the community. We also account for marked utilities at the entry and exit areas before the drill approaches the crossing.
Which electric company serves my Carter address in Parker County, and who confirms conduit needs?
County records list Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri County Electric Cooperative and Wise Electric Cooperative as reporting service in Parker County. That does not identify the provider at every Carter address. Confirm the line owner for your location before setting conduit requirements or planning an electric bore near Carter Road.
Who controls Carter Road, and does a bore mean cutting the street?
Carter is unincorporated, so it has no city government; Parker County or the state has authority depending on the road. A directional bore can pass below Carter Road without cutting across its pavement. The route still needs marked utilities exposed and suitable entry and exit pits outside the travel surface.
Does Trinity cover Springtown and rural sites outside Carter?
Yes. Trinity serves Texas work in Carter, nearby Springtown and rural sites beyond the mapped community boundary. Springtown is 4.9 miles northeast of Carter, and the same call can cover a route near FM 51 or a property outside the community. The work plan depends on the address, ground and crossings.
How far ahead should I call Texas811 for a Carter bore near Hutcheson Hill Road?
Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For a bore near Hutcheson Hill Road, submit the path details with the request. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work resumes.
What affects the cost of directional boring in Carter near FM 51?
Cost depends on the specific Carter job. The 215 road miles from Yukon affect mobilization; Aledo soil and mapped shallow bedrock affect drilling conditions. FM 51 permit work, the number of utilities to expose, pavement, a Carter Creek crossing, pit and excavator needs, pipe size, bore length and emergency timing also shape the scope.
Where the Carter facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Carter
- U.S. Census Bureau, TIGER/Line 2024: Carter boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Carter population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Carter housing units and year built
- Macrostrat geologic map compilation: map units under Carter
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Parker County
- U.S. Geological Survey, Elevation Point Query Service: Carter elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Carter
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Carter
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Carter, Texas
Type the address of your job in Carter. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Carter
Same county: Willow Park · Aledo · Briar · Annetta · Azle · Hudson Oaks · Fort Worth · Western Lake · Dennis · Cresson · Horseshoe Bend · Annetta South. All counties: Texas county list.
