Geronimo Texas Directional Boring: Branyon Clay, Geronimo Creek and Highway 123
Quick Answer: Texas State Highway 123 is a main route to plan around, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Geronimo, Texas. Huber Road is one route where a bore may need to pass beneath pavement rather than cut across it. Geronimo is 456 road miles from our Yukon, Oklahoma main office, with Seguin 5.7 miles south. Branyon clay dominates the mapped ground, so sticky cuttings and pipe drag shape the drilling plan.
Geronimo bores at a glance
- Unincorporated community in Guadalupe County, Texas. Population 1,097 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 456 miles, about 8.6 hours of driving.
- Ground: Branyon soil is mapped on 73 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 123, FM 758 and FM 2623. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Geronimo Creek and Alligator Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Huber Road in Geronimo?
Huber Road, Glenewinkel Road and Texas State Highway 123 are possible routes for water, sewer, gas, electric conduit or fiber bores. Geronimo is an unincorporated community in Guadalupe County, not a city. The Census Bureau counted 1,097 residents in 2020; it does not publish yearly estimates for unincorporated places. We take directional boring work in Geronimo and across Texas, matching the bore plan to the line and route.
Our main office is in Yukon, Oklahoma, and Geronimo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. Next to that reach, a typical Geronimo service bore along Huber Road is a shorter run shaped by Branyon clay and nearby utilities. Trinity is a family business started in 1965, with directional boring since 1982.

How does Branyon soil affect a bore in Geronimo?
The USDA soil survey maps Branyon across 73 percent of Geronimo, including Branyon clay on 65 percent of the mapped area and Branyon clay on 1 to 3 percent slopes on 8 percent. The surface is clay across 91 percent and silty clay across 7 percent. At about 40 inches, the mapped texture is clay across 97 percent, with average clay content of 52 percent. We use Branyon and Tinn as mapped soil patterns for planning, not as substitutes for test borings along Huber Road. For a bore near Huber Road, the heavy clay can cling to the reamer and grip pipe.
| USDA soil survey, inside the Geronimo mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Branyon 73 percent, Tinn 11 percent, Houston Black 7 percent and Barbarosa 7 percent |
| Texture at the surface | clay 91 percent and silty clay 7 percent |
| Texture about 40 inches down | clay 97 percent |
| Engineering class about 40 inches down | fat clay (CH) 99 percent |
| Average clay content about 40 inches down | 52 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 11 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
Bedrock is not mapped in the top five feet of Geronimo, though deeper rock is still possible. The USDA soil survey maps no seasonal water table within 40 or 60 inches, but flood prone soils cover 11 percent, so creek side pits need attention. High steel corrosion risk is mapped across 99 percent, a concern for uncoated casing or tracer wire that the line owner should address. The Leona Formation, of Pleistocene age, includes gravel, sand, silt and clay; the map also records Late Cretaceous sedimentary material. The local clay calls for controlled fluid and staged reaming.
What does it take to bore clay in Geronimo?
Branyon clay is the main mapped soil in Geronimo. We plan the route, expose marked lines, drill with controlled fluid and keep the hole ready for pipe before pulling through.
- Along Huber Road, we expose each marked utility with hydrovac before drilling nearby; paint marks position, not depth.
- In Branyon clay, we use thinner fluid and polymer, then open the hole in stages to limit sticky cuttings and pipe grip.
- Near Texas State Highway 123 pavement, we watch fluid returns and pressure so the bore does not lift the surface.
- For a Geronimo Creek crossing, we plan depth beneath the channel, check federal jurisdiction, and place pits on the banks without cutting them.

Which Geronimo roads can we bore across near Geronimo Creek?
Texas State Highway 123 has 3.9 mapped roadway miles inside the Geronimo community boundary. FM 758 has 1.6 miles and FM 2623 has 0.9 miles. Huber Road is the longest named street at 3.63 miles, followed by Glenewinkel Road and Glenewinkle Lane at 2.74 miles each. A bore under a highway or along one of these roads needs a route and depth plan that fits the right of way. Existing highway pavement is bored or tunneled beneath, not cut open.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 123 | State highway | 3.9 roadway miles inside | State highway office |
| FM 758 | State highway | 1.6 roadway miles inside | State highway office |
| FM 2623 | State highway | 0.9 roadway miles inside | State highway office |
| Geronimo Creek | Stream | 3.79 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Alligator Creek | Stream | 0.41 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the Geronimo community boundary or within one mile outside it, so a track agreement is not part of the mapped crossing picture. Geronimo Creek runs 3.79 channel miles inside the boundary, and Alligator Creek runs 0.41 miles. Public records map 8 street crossings of named streams. A bore near Geronimo Creek needs a channel crossing plan and a check during planning for U.S. Army Corps of Engineers jurisdiction. Around Geronimo Creek, no lakes or ponds are mapped within one mile, so we plan water crossings around the creek instead.
Who signs off on Geronimo bores in Guadalupe County?
Geronimo is an unincorporated community, so it has no city government to issue street approvals. County or state authority depends on the route: Texas State Highway 123, FM 758 and FM 2623 are state roads, and work in their right of way needs a TxDOT utility permit. The line owner files through TxDOT’s online RULIS system, while we prepare the bore plan and profile for that filing. For Texas State Highway 123 crossings, we submit the permit package for review by the TxDOT San Antonio District. For electric or communication crossings, the listed cover is 60 inches below the lowest crossed grade; for water it is 60 inches, and pressurized sewer also needs 60 inches. A creek route at Geronimo Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Geronimo in Guadalupe County?
The water provider for a specific address in Geronimo has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not tie water systems to towns, and no system carries this place’s name, so the address provider could not be matched. Utilities reporting electric service in Guadalupe County include AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative. We confirm the line owner before a conduit bore near Huber Road.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Guadalupe County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Geronimo’s median housing year at 2003; 8 percent of homes were built before 1960 and 58 percent in 2000 or later. A bore along Glenewinkel Road might serve a new connection or replace an older line, but age alone does not show what is buried. We use hydrovac potholing to expose marked utilities before drilling near them, since surface paint does not show depth.

How far is Geronimo from Lake Dunlap and our Yukon yard?
Geronimo is an unincorporated community in Guadalupe County, Texas, at an elevation of 572 feet and covering 7.99 square miles. ZIP code 78155 serves the area. Seguin is 5.7 miles south and is the county seat; Lake Dunlap is 6.8 miles west, McQueeney is 6.9 miles southwest, and New Braunfels is 9.0 miles west. Our Yukon, Oklahoma main office is 456 road miles away, an 8.6 hour drive. That distance matters when planning equipment mobilization for a bore near Texas State Highway 123.
Places near Geronimo
- Directional boring in Seguin: 5.7 miles south
- Directional boring in Lake Dunlap: 6.8 miles west
- Directional boring in McQueeney: 6.9 miles southwest
- Directional boring in New Braunfels: 9 miles west
- Directional boring in Kingsbury: 9.1 miles east
What boring work comes up near Glenewinkel Road in Geronimo?
- Highway crossing: A bore under Texas State Highway 123 needs a TxDOT right of way plan and a route beneath existing pavement.
- Water service: A service along Glenewinkel Road needs the address specific water provider confirmed before the bore route is set.
- Fiber conduit: Huber Road offers a named route for conduit, with hydrovac checks where marked utilities cross the proposed path.
- Creek crossing: A Geronimo Creek bore needs a channel depth plan and a jurisdiction check during planning.
- Replacement bore: Near Glenewinkle Lane, potholing can help locate existing lines before a replacement route is drilled.
- Electric conduit: Along FM 758, the line owner must be confirmed before conduit specifications and any state right of way filing are settled.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Geronimo work near Texas State Highway 123?
For a Geronimo quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage. A route along Huber Road or a crossing beneath Texas State Highway 123 helps us locate the work. A sketch or plans can show the pits, pavement and nearby utilities, so we can assess the route before setting the scope.
The job scope drives the price. Ground conditions matter: Branyon clay can make reaming and pipe pull more demanding. Crossings matter too, including Texas State Highway 123 pavement or a route near Geronimo Creek. Logistics include pit space, excavator time, sand backfill and mobilization from the Yukon office, 456 road miles away. Pipe size and footage, marked utilities that need exposure, concrete or pavement, and high profile or emergency work also change the plan.
Questions people ask about boring in Geronimo
Does Trinity take directional boring jobs in Geronimo, Guadalupe County, and how are crews assigned?
Yes. We take directional boring work in Geronimo, and Trinity remains your contact from the first call through the bore log. Our main office is in Yukon, Oklahoma; work is handled by our own crews or from satellite yards run by partner drilling contractors we have vetted. A route on Huber Road helps us assess access and scope.
Can a line be bored beneath Geronimo Creek in Geronimo?
A bore beneath Geronimo Creek can be planned around the channel, subject to the route and site review. The creek runs 3.79 channel miles inside the community boundary, and public records map 8 street crossings of named streams. We plan the depth to stay under the channel and check for U.S. Army Corps of Engineers jurisdiction.
Who owns the electric lines in Geronimo, Guadalupe County, and who confirms conduit specs?
The specific line owner has to be confirmed for the address before conduit details are planned. Electric utilities reporting service in Guadalupe County include AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative. That list does not identify the provider on every Huber Road property.
Who controls Glenewinkle Lane in Geronimo, and does a bore require cutting the street?
Geronimo has no city government because it is an unincorporated community, so street authority rests with the county or state depending on the road. Glenewinkle Lane is a named local street, while Texas State Highway 123 is state controlled. A bore can pass beneath pavement without an open cut, subject to the applicable route approval.
How old are buried lines near Glenewinkel Road in Geronimo, and can they be replaced by boring?
The American Community Survey 2019 to 2023 estimates give Geronimo a median housing year of 2003, with 8 percent built before 1960 and 58 percent built in 2000 or later. Those ages do not establish line age. A replacement bore along Glenewinkel Road can be planned after marked utilities are exposed and the existing route is checked.
Could groundwater or flood prone soil affect bore pits near Geronimo Creek in Geronimo?
The USDA soil survey does not map a seasonal water table within 60 inches, but flood prone soils cover 11 percent of Geronimo. Pits near Geronimo Creek still need site specific attention, especially where creek conditions affect access. We plan pit placement and drainage with the route rather than assuming all ground stays dry.
Does the distance from Seguin to Geronimo affect a bore mobilization from Yukon?
Geronimo is 456 road miles and an 8.6 hour drive from our Yukon, Oklahoma main office. Seguin is 5.7 miles south and is the county seat, but the job’s mobilization is based on the Yukon distance and the equipment needed. A bore along Texas State Highway 123 may need different staging from a short service route.
How much 811 notice is needed for a Geronimo bore near Huber Road, and what if marks move?
For a bore near Huber Road, Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start moves more than 14 days past the original notice, a new request is needed. Along FM 758, we refresh worn or moved utility marks through Texas811 before continuing boring work.
What affects the cost of directional boring in Geronimo near Texas State Highway 123?
The route and scope determine the price, not one factor alone. Branyon clay affects drilling conditions; a Texas State Highway 123 crossing can add permit and pavement requirements; and mobilization from Yukon is a planning factor. Length, pipe size, exposed utilities, pits, excavator time, pavement, creek crossings and emergency timing also affect the work.
Where the Geronimo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Geronimo
- U.S. Census Bureau, TIGER/Line 2024: Geronimo boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Geronimo population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Geronimo housing units and year built
- Macrostrat geologic map compilation: map units under Geronimo
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Guadalupe County
- U.S. Geological Survey, Elevation Point Query Service: Geronimo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Geronimo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Geronimo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Geronimo, Texas
Type the address of your job in Geronimo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Geronimo
Same county: Cibolo · Schertz · Redwood · Selma · Marion · Santa Clara · New Berlin · Zuehl · Staples. All counties: Texas county list.
