Cibolo Texas Directional Boring: Branyon Clay, Cibolo Creek And Union Pacific
Quick Answer: Cibolo is an incorporated city, and the city owns streets such as Green Valley Road. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for utility crossings beneath Interstate 10. Our Yukon, Oklahoma main office is 461 road miles from Cibolo Creek. Branyon clay can cling to the reamer and grip pipe, so fluid control and pull timing matter.
Cibolo bores at a glance
- Incorporated city in Guadalupe County, Texas. Population 37,816 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 461 miles, about 8.9 hours of driving.
- Ground: Branyon soil is mapped on 26 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 13 percent of the area.
- Highways inside the boundary: Interstate 10, US 90, FM 1103, FM 78 and FM 465. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Cibolo Creek, Santa Clara Creek and Buzzard Creek.
- Public water: City of Cibolo, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Cibolo near Interstate 10?
Cibolo is an incorporated city, so streets such as FM 1103 belong to the city. The Census Bureau Vintage 2024 estimate puts its Guadalupe County population at 37,816. We install water, sewer, gas, electric conduit and fiber for routes along Green Valley Road or service connections branching from Cibolo Valley Drive. The route and existing lines determine where pits can sit.
Our main office is in Yukon, Oklahoma, and Cibolo work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet under the Arkansas River in Tulsa. Against that reach, a typical Cibolo service bore is shorter, with Branyon clay and marked utilities shaping the route near Interstate 10.

What does the soil survey show beneath Cibolo’s Branyon soil?
The USDA soil survey maps Branyon across 26 percent of Cibolo and Houston Black across 21 percent. Branyon clay, 0 to 1 percent slopes, covers 23 percent of the mapped area. At about 40 inches below the surface, the survey maps clay across 60 percent and silty clay across 23 percent; average clay content there is 50 percent. We use Cibolo mapped soil patterns as planning context for boring, not as a substitute for test borings. For a bore, the clay share points to sticky cuttings that can collect on the reamer.
| USDA soil survey, inside the Cibolo city limits | What is mapped |
|---|---|
| Soil series mapped | Branyon 26 percent, Houston Black 21 percent, Barbarosa 17 percent, Austin 9 percent and Heiden 7 percent |
| Texture at the surface | clay 59 percent, silty clay 35 percent and loam 3 percent |
| Texture about 40 inches down | clay 60 percent, silty clay 23 percent and bedrock 13 percent |
| Engineering class about 40 inches down | fat clay (CH) 78 percent and lean clay (CL) 8 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 13 percent of the area (0 percent hard rock, 13 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 94 percent of the area |
The survey gives a typical bedrock depth of 24 inches and maps bedrock within 60 inches across 13 percent of Cibolo. Pecan Gap Chalk, a Campanian unit, is mapped in the northeastern map area; weathered chalk can slow a bore. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 7 percent. Cibolo’s mapped high steel corrosion risk covers 94 percent, so we consider casing and tracer wire materials for the line.
How do we drill Cibolo’s clay ground?
Cibolo’s mapped clay calls for control of fluid, cuttings and pipe timing. Along Green Valley Road or near Cibolo Creek, we match the drilling plan to the route and the marked lines.
- At a Branyon clay site, we use drilling fluid and staged reaming to manage sticky cuttings, then have the pipe ready for the pull.
- Where Cibolo’s heavy clay is present, we watch returning fluid and keep pressure controlled so it does not lift pavement.
- Before the drill nears a marked line under Green Valley Road, we hydrovac pothole it because surface paint does not show depth.
- Near the mapped Pecan Gap Chalk, we track the head from the surface and log depth and pitch as the bore advances.

What might a new Cibolo line cross near Union Pacific?
Interstate 10 and US 90 each have 11.6 mapped roadway miles in Cibolo. FM 1103, FM 78, FM 465 and FM 369 are also inside the limits; Interstate 35 and US 81 run along or touch the limits. A route can also involve Green Valley Road, Haeckerville Road or Lower Seguin Road. Existing highway pavement is bored beneath rather than cut, and access, pits and marked utilities shape the crossing plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 10 | Interstate | 11.6 roadway miles inside | State highway office |
| US 90 | US highway | 11.6 roadway miles inside | State highway office |
| FM 1103 | State highway | 5.1 roadway miles inside | State highway office |
| FM 78 | State highway | 4.3 roadway miles inside | State highway office |
| FM 465 | State highway | 0.6 roadway miles inside | State highway office |
| FM 369 | State highway | 0.4 roadway miles inside | State highway office |
| Interstate 35 | Highway nearby | Runs along or touches the city limits | State highway office |
| US 81 | Highway nearby | Runs along or touches the city limits | State highway office |
| Union Pacific | Railroad | 3.56 track miles inside | The railroad |
| Cibolo Creek | Stream | 12.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Santa Clara Creek | Stream | 0.85 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Buzzard Creek | Stream | 0.09 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Dry Santa Clara Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Deadman Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 3.56 track miles in Cibolo on the Glidden Subdivision, and three street and rail crossings are mapped. A track crossing needs an agreement with Union Pacific that sets its conditions. Cibolo Creek runs 12.49 channel miles inside the city, and eight street crossings of named streams are mapped. Santa Clara Creek and Buzzard Creek are also inside the limits, so a creek route needs channel planning.
Who signs off on a Cibolo bore in Guadalupe County?
Cibolo is incorporated, so its city streets, including Cibolo Valley Drive, belong to the city. For work in the right of way of Interstate 10, US 90, FM 1103 or another state road, the utility owner applies for a TxDOT utility permit through RULIS. The TxDOT San Antonio District reviews it; we prepare the bore plan and profile and work under the utility owner’s permit. A crossing of Union Pacific track needs an agreement with the railroad. A Cibolo Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Cibolo water system?
The City of Cibolo public water system uses purchased surface water and reports 6,883 service connections serving 20,331 people. That gives a route near Cibolo Valley Drive a known public system to account for, but the specific line location still needs confirmation. Utilities reporting electric service in Guadalupe County include AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative. The line owner is confirmed before a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Cibolo | Public water system | Surface water bought from another system | 6,883 connections, 20,331 people served |
| AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Guadalupe County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Cibolo’s median housing year at 2007; 82 percent of housing units were built in 2000 or later and 1 percent before 1960. That mix can mean both newer service connections and replacement work. Before a bore under Green Valley Road, we hydrovac pothole each marked utility on the route. Paint shows position, not depth, so the exposure checks the actual crossing.

Do you cover Cibolo and nearby New Braunfels?
Cibolo is in Guadalupe County, has an elevation of 721 feet and covers 21.09 square miles. For underground work in Cibolo, we account for ZIP codes 78108 and 78124 when confirming the service location. Schertz is 2.0 miles west, Santa Clara 3.8 miles northeast and Marion 4.5 miles east; Randolph AFB is 4.6 miles southwest and Universal City 5.5 miles west. New Braunfels is 10.8 miles northeast, while Seguin, the county seat, is 15.0 miles east. The Yukon yard is 461 road miles away, an 8.9 hour drive.
Places near Cibolo
- Directional boring in Schertz: 2 miles west
- Directional boring in Santa Clara: 3.8 miles northeast
- Directional boring in Marion: 4.5 miles east
- Randolph AFB: 4.6 miles southwest
- Directional boring in Universal City: 5.5 miles west
- Directional boring in New Braunfels: 10.8 miles northeast
Which Cibolo jobs call for a bore along Green Valley Road?
- Highway crossing: A utility route beneath Interstate 10 is bored under the pavement, with pits set off the travel lanes.
- Water service: A connection near the City of Cibolo system can be routed from Cibolo Valley Drive after existing lines are located.
- Fiber route: A conduit run along Green Valley Road can avoid cutting pavement, with marked utilities exposed before drilling near them.
- Creek crossing: A route beneath Cibolo Creek needs channel depth planning and a check for federal jurisdiction during planning.
- Rail crossing: A line beneath Union Pacific track needs the railroad’s agreement and its crossing conditions built into the bore plan.
- Street crossing: A bore beneath Lower Seguin Road leaves the pavement uncut, with work pits placed in dirt on each side.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Cibolo bore near Cibolo Valley Drive?
For a Cibolo quote, give us the address or map pin, what will go underground, the pipe or conduit size and footage; a sketch or plans help. A route near Cibolo Valley Drive can differ from one beneath Interstate 10 because access, pavement and the number of marked crossings change the work plan.
A short service route with clear access and few crossings is simpler to plan than a bore through Branyon clay near Union Pacific track. Length, pipe size, soil and rock, utilities to expose, pavement, creek or drainage crossings, pit work and excavator time all affect the scope. The 461 road miles from Yukon also matter for mobilization. A Cibolo Creek crossing or work beside Interstate 10 can add planning and equipment needs.
Questions people ask about boring in Cibolo
Does Trinity take directional boring jobs in Guadalupe County near Cibolo?
Yes. Trinity takes directional boring work in Cibolo and elsewhere in Guadalupe County. Our own crews and crews from vetted partner contractor satellite yards can staff the work. You coordinate with Trinity from the first call through the bore log, whether the route is near FM 1103 or another Cibolo street.
Can a line be bored beneath Cibolo Creek in Cibolo?
A line can be planned beneath Cibolo Creek without cutting its banks, subject to the route and ground conditions. The creek runs 12.49 channel miles inside Cibolo. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the bore depth is set to stay beneath the channel.
Who runs Cibolo’s public water system, and what is its source?
The City of Cibolo owns the public water system, which uses purchased surface water. It reports 6,883 service connections and 20,331 people served. A proposed bore near Cibolo Valley Drive still needs the specific buried line identified before the route is set.
Which electric line owner should I confirm for a Cibolo conduit bore in Guadalupe County?
Confirm the line owner for the specific Cibolo address before planning a conduit bore. Electric service reporters in Guadalupe County include AEP Texas Central, Guadalupe Valley Electric Cooperative and others. The county list does not identify the provider at each address, so the owner’s conduit specifications need confirmation for the route near Green Valley Road.
Does Cibolo control Lower Seguin Road, and must a bore cut the street?
Cibolo is an incorporated city, so its city streets, including Lower Seguin Road, belong to the city. A directional bore can pass below the pavement without an open cut through the street. The entry and exit pits sit in dirt on each side, subject to available access and the marked utilities.
How do Cibolo’s home ages near Green Valley Road affect replacement bores?
Cibolo’s median housing year is 2007, and the American Community Survey estimates 82 percent of housing units were built in 2000 or later. Replacement work can still involve older buried lines or newer service connections near Green Valley Road. We expose marked utilities along the bore path before drilling close to them.
Does Trinity cover Schertz and rural sites outside Cibolo?
Yes. Trinity takes work across Texas, including Cibolo, nearby Schertz and rural sites outside the city limits. Schertz is 2.0 miles west of Cibolo. The address and route help establish the access, ground conditions and mobilization needed for a bore.
How much Texas811 notice is needed for a Cibolo bore along Haeckerville Road?
For a bore along Haeckerville Road, request locates through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Cibolo work, we include the Texas811 notice in planning because it describes that as at least two working days. If the start slips more than 14 days beyond the original notice, submit a new request; worn or moved marks must be refreshed before work continues.
What affects the cost of a directional bore in Cibolo near Interstate 10?
The job details determine the price. Length, pipe size, Branyon clay, rock, utility crossings, pavement, creek or drainage crossings and pit work all affect the scope. Mobilization also matters because the Yukon yard is 461 road miles away. A route beneath Interstate 10 may need more planning than a clear service run on a local street.
Where the Cibolo facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Cibolo
- U.S. Census Bureau, TIGER/Line 2024: Cibolo boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Cibolo
- U.S. Census Bureau, American Community Survey 2019 to 2023: Cibolo housing units and year built
- Macrostrat geologic map compilation: map units under Cibolo
- U.S. EPA Safe Drinking Water Information System: public water systems serving Cibolo
- U.S. Department of Transportation, North American Rail Network: track owners in Guadalupe County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Guadalupe County
- U.S. Geological Survey, Elevation Point Query Service: Cibolo elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Cibolo
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Cibolo
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Cibolo, Texas
Type the address of your job in Cibolo. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Cibolo
Same county: Seguin · Redwood · Selma · McQueeney · Lake Dunlap · Geronimo · New Berlin · Zuehl · Staples · Kingsbury. All counties: Texas county list.