Quemado Texas Directional Boring: Laredo Silty Clay Loam, US 277, Canon Grande
Quick Answer: On US 277, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines routed beneath the highway. Quemado has 4.32 public road miles inside its mapped community boundary, including 1st Street. Our Yukon main office is 572 road miles away, a factor for work near 2nd Street. The USDA maps Laredo silty clay loam across 99 percent of the area; sticky clay can cling to a reamer and grip pipe. Canon Grande is 0.3 miles from the mapped boundary, so its channel matters when planning a nearby route.
Quemado bores at a glance
- Unincorporated community in Maverick County, Texas. Population 162 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 572 miles, about 11.4 hours of driving.
- Ground: Laredo soil is mapped on 99 percent of the area, with silty clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 277. State permit office: TxDOT Laredo District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring under US 277 in Quemado?
Trinity Boring Solutions takes directional boring work in Quemado, an unincorporated community in Maverick County with 162 people in the 2020 Census count. Along US 277, 1st Street and Del Rio Boulevard, our crews can install water, sewer, gas, electric conduit and fiber lines by bore. The route and existing utilities determine the plan for each line.
Our main office is in Yukon, Oklahoma, and Quemado work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record includes no utility strike in over 25 years, a consideration around electric service reported in Maverick County. Our family business began in 1965, and we have done directional boring since 1982, with Quemado 572 road miles from our Yukon main office.

What is Laredo soil like to bore in Quemado?
The USDA soil survey maps Laredo soil across 99 percent of Quemado, with Laredo silty clay loam mapped at the surface and about 40 inches down. That depth is classified CL, with average clay content of 30 percent. No sandy or gravelly area is mapped at that depth. This clay can hold an open bore, but it may ball up on a reamer or swell against pipe, so the fluid and reaming sequence need to suit the soil rather than treating it like loose sand.
| USDA soil survey, inside the Quemado mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Laredo 99 percent |
| Texture at the surface | silty clay loam 99 percent |
| Texture about 40 inches down | silty clay loam 99 percent |
| Engineering class about 40 inches down | lean clay (CL) 99 percent |
| Average clay content about 40 inches down | 30 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 1 percent of the area |
Bedrock is not mapped in the top five feet of Quemado, though the geologic map also shows Mesozoic sedimentary rocks described as carbonate and shale. Alluvium, undivided, of Cenozoic age is another mapped unit, consistent with varied gravel, sand, silt and clay deposits. Seasonal water table and flood prone soils are not mapped in the USDA survey. High steel corrosion risk is mapped in 1 percent of the area, so the line owner should consider casing and tracer wire materials for a route in that portion.
What does it take to bore Quemado silty clay loam?
Quemado’s Laredo silty clay loam calls for a controlled fluid plan and staged reaming. We track the drill head from the surface and adjust the route to the ground and marked utilities along streets such as 1st Street.
- In Laredo silty clay loam, we use a fluid plan suited to sticky cuttings, then ream in stages to keep clay from packing onto the tool.
- Because clay in Quemado can grip pipe, we prepare the product pipe so it can be pulled promptly after the hole reaches its final size.
- At a marked crossing along 1st Street, we hydrovac pothole the utility before the drill approaches; surface paint does not show its depth.
- For a route toward Canon Grande, we track depth and pitch as the head advances and plan the bore beneath the channel.

Where might a line pass beneath Canon Grande near Quemado?
US 277 runs 0.6 mapped roadway miles inside Quemado, and no other highway is listed within 1.5 miles outside the mapped community boundary. A line beneath existing highway pavement must be bored or tunneled, with a TxDOT utility permit for work in the right of way. Inside the community, 1st Street and Del Rio Boulevard are the longest named streets at 0.55 miles each, followed by 2nd Street at 0.38 miles. The 4.32 public road miles mean a route can involve local pavement as well as the highway.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 277 | US highway | 0.6 roadway miles inside | State highway office |
| Canon Grande | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Maverick County Canal | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Quemado or within one mile outside the community, and no street and rail crossings are mapped there. No named stream crosses the community; Canon Grande is 0.3 miles from its boundary and Maverick County Canal is 0.9 miles away. No street crossing of a named stream is mapped inside the community. A proposed creek route near Canon Grande still needs channel planning and a check for federal jurisdiction.
Who approves a bore in Quemado and Maverick County?
Quemado has no city government, so its public streets fall to the county, while state highway right of way is handled by TxDOT. For a bore affecting US 277, the TxDOT Laredo District reviews the utility permit. The line owner, not our crew, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules set cover requirements by line type and may specify a different depth. No railroad is mapped near Quemado, while a route at Canon Grande is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Quemado and Maverick County?
The water provider for a specific Quemado address has to be confirmed with the county or local water district before a bore is planned; the available EPA records do not tie a provider to this community. AEP Texas Central and Rio Grande Electric Cooperative report electric service in Maverick County, but that does not identify the owner at every address. We confirm the line owner before planning an electric conduit bore along US 277 or a local street.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central and Rio Grande Electric Cooperative | Electric utilities reporting service in Maverick County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published reliably for a place as small as Quemado. Long service runs and lines following 1st Street or Del Rio Boulevard can affect a route, while September averages 3.2 inches of rain and February averages 0.7. We hydrovac pothole every marked utility on the route before drilling near it. For a proposed bore along 1st Street, that means exposing each marked crossing first because paint shows position, not depth.

How far is Quemado from Radar Base and our Yukon yard?
Quemado is an unincorporated community in Maverick County at an elevation of 782 feet, with 0.11 square miles of land and ZIP code 78877. Normandy is 3.0 miles southeast, and Radar Base is 8.3 miles southeast. Eagle Pass, the county seat and nearest larger city, is 18.2 miles southeast. The Yukon yard is 572 road miles away, or an 11.4 hour drive, so distance is part of planning mobilization for a job near US 277.
Places near Quemado
- Directional boring in Normandy: 3 miles southeast
- Directional boring in Radar Base: 8.3 miles southeast
- Directional boring in Elm Creek: 14.1 miles southeast
- Directional boring in Siesta Acres: 15.4 miles southeast
- Directional boring in Seco Mines: 15.5 miles southeast
- Directional boring in Eagle Pass: 18.2 miles southeast
Which jobs call for a bore near Quemado 1st Street?
- US 277 crossing: A utility route beneath the highway pavement is bored or tunneled, with the line owner’s permit covering work in the right of way.
- Water service: A proposed connection near 2nd Street needs the address specific water provider confirmed before its route is planned.
- Fiber conduit: A route along 1st Street can avoid an open cut across pavement, with marked utilities exposed before drilling near them.
- Creek crossing: A route near Canon Grande needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Electric conduit: Before a conduit route near Del Rio Boulevard is set, we confirm which company owns the line at that address.
- Local street bore: Work near 4th Street can pass beneath pavement, with entry and exit pits placed in suitable dirt.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Quemado bore near 4th Street?
For a proposed bore near 4th Street, start with the address or map pin and say what will go underground. Include the pipe or conduit size and the planned footage, such as a short service connection or a longer run toward US 277. A sketch or plans help us see the route, access and crossings before we scope the work.
The price follows the route and scope, not one measurement alone. Laredo silty clay loam affects drilling and reaming; crossings of US 277, pavement or marked utilities add planning and exposure work. Creek conditions near Canon Grande can affect depth and access. Pit size, excavator time, backfill, pipe size and length also matter, as does mobilization from the Yukon office, 572 road miles away.
Questions people ask about boring in Quemado
Does Trinity take directional boring work in Quemado and Maverick County?
Yes, we take directional boring jobs in Quemado and staff them with our crews or from satellite yards operated by vetted partner drilling contractors. Our Yukon main office remains the point of contact from planning through the bore log. For a route near US 277, the exact crew and access plan depend on the job.
Who is responsible for 2nd Street in Quemado, and does a bore require cutting it?
Quemado is unincorporated and has no city government, so its public streets are county roads rather than city streets. A bore near 2nd Street can pass beneath pavement without an open cut, subject to the route and approvals that apply. The mapped community has 4.32 public road miles.
What ground will a bore meet in Quemado around Laredo soil?
The USDA soil survey maps Laredo silty clay loam across 99 percent of Quemado, including about 40 inches below the surface. It classifies that depth as CL and gives average clay content of 30 percent. The clay can hold an open hole, but sticky cuttings call for staged reaming and a suitable fluid plan.
Could a directional bore in Quemado hit rock beneath Laredo soil?
In Maverick County’s Quemado area, bedrock is not mapped in the top five feet, but deeper rock remains possible. The geologic map shows Cenozoic alluvium, undivided, as well as Mesozoic carbonate and shale. A route near US 277 still needs planning for the actual ground encountered as drilling advances.
Does TxDOT Laredo District approve a bore under US 277 in Quemado?
TxDOT reviews a utility permit for work in the US 277 right of way through its Laredo District. The utility that owns the line submits the application in RULIS, while we prepare the bore plan and profile and work under the issued permit. TxDOT rules require boring or tunneling beneath existing highway pavement.
Can a line be bored under Canon Grande near Quemado?
A bore can be planned for a route near Canon Grande, which lies 0.3 miles from the mapped community boundary. The channel depth and alignment need review, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. No named stream is mapped inside Quemado.
Does Trinity cover Normandy and rural sites outside Quemado?
We take work across Texas, including Normandy and rural sites outside Quemado. Normandy is 3.0 miles southeast of the community, and Eagle Pass is 18.2 miles southeast. For each address, we assess the route, access and distance from the Yukon office before setting the work plan.
How much notice does Texas811 need for a bore by 1st Street in Quemado?
For a bore by 1st Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For work near Del Rio Boulevard, if the start slips more than 14 days past the original notice, we submit a new request. Before work resumes near 1st Street, we get worn or moved marks refreshed through Texas811.
What affects the cost of directional boring under US 277 in Quemado?
The scope sets the price: bore length, pipe size, Laredo clay, pavement and the number of marked utilities to expose all matter. A US 277 crossing has highway requirements, while a route near Canon Grande can add channel planning. Mobilization also reflects the 572 road miles from the Yukon office; no single factor determines the job price.
Where the Quemado facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Quemado
- U.S. Census Bureau, TIGER/Line 2024: Quemado boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Quemado population count
- Macrostrat geologic map compilation: map units under Quemado
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Maverick County
- U.S. Geological Survey, Elevation Point Query Service: Quemado elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Quemado
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Quemado
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Quemado, Texas
Type the address of your job in Quemado. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Quemado
Same county: Eidson Road · Chula Vista · Las Quintas Fronterizas · Rosita · Fabrica · El Indio. All counties: Texas county list.
