Radar Base Texas Directional Boring: Elindio Soil, US 277 and Hediondo Creek
Quick Answer: Along US 277, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for utility routes in Radar Base, Texas. Radar Base is 581 road miles from our Yukon, Oklahoma main office, so a Del Rio Boulevard job needs mobilization planned around that distance. Elindio soil covers much of the mapped area, and clay can stick to the reamer and grip the pipe. Staged reaming and a same day pull help manage that ground.
Radar Base bores at a glance
- Unincorporated community in Maverick County, Texas. Population 93 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 581 miles, about 11.6 hours of driving.
- Ground: Elindio soil is mapped on 80 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 277 and Texas State Highway 131. State permit office: TxDOT Laredo District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Hediondo Creek in Radar Base?
Trinity Boring Solutions takes directional boring work in Radar Base, Maverick County, including service routes near US 277 and Del Rio Boulevard. The Census Bureau counted 93 residents in 2020; it does not publish yearly estimates for unincorporated places. Our crews install water, sewer, gas, electric conduit and fiber along routes such as Industrial Parkway or Stannie Street, with the alignment set by the address and existing lines.
Our main office is in Yukon, Oklahoma, and Radar Base work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore is roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. A planned route along Del Rio Boulevard starts with its own line size and footage, rather than assuming a river scale bore.

What ground does a bore encounter in Radar Base near Elindio soil?
The USDA soil survey maps Elindio association across 80 percent of Radar Base, with Darl, Jimenez and Mavco associations making up the rest of the mapped area. Surface texture is silty clay loam across 80 percent, while clay loam accounts for 7 percent and very gravelly loam for 7 percent. At about 40 inches below the surface, clay loam is mapped under 86 percent of the area, with an average clay content of 38 percent. The survey maps no sandy area at that depth. These are soil patterns, not test borings, so the exact route still matters.
| USDA soil survey, inside the Radar Base mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Elindio 80 percent, Darl 7 percent, Jimenez 7 percent and Mavco 6 percent |
| Texture at the surface | silty clay loam 80 percent, clay loam 7 percent and very gravelly loam 7 percent |
| Texture about 40 inches down | clay loam 86 percent and variable 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 86 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 86 percent of the area |
USDA mapping does not place bedrock within the top five feet of Radar Base, though that does not settle what lies deeper. Seasonal water table and flood prone soils are not mapped in the survey, but site conditions still need checking. High steel corrosion risk is mapped across 86 percent of the area, so the line owner should consider casing and tracer wire materials; HDPE does not share that mapped steel concern. The geologic map identifies Uvalde Gravel of Cenozoic age and Mesozoic sedimentary rocks, including carbonate and shale, which can mean changing material along a bore.
How do we drill clay loam ground in Radar Base?
For Radar Base routes mapped as clay loam, we manage sticky cuttings and watch fluid returns so pressure does not lift pavement near US 277. The mapped soil guides the plan, while the bore path and field conditions guide the final setup.
- On Elindio routes, we use thinner drilling fluid with polymer to keep sticky clay from building on the reamer and gripping the pipe.
- Where clay loam is mapped about 40 inches down, we ream in stages and have the pipe ready so it can be pulled the same day the hole opens.
- Near US 277 pavement, we watch fluid returns and keep pressure controlled to reduce the chance of lifting the road surface.
- At a Del Rio Boulevard bore, we hydrovac each marked utility on the path before drilling near it, then track the head and log depth and pitch.

Which roads, tracks or creeks affect a Radar Base bore near Del Rio Boulevard?
US 277 runs for 2.1 mapped roadway miles inside the Radar Base community, and Texas State Highway 131 for 0.9 miles. Those corridors call for a planned bore profile and a check of the right of way before equipment is set. Del Rio Boulevard is the longest named street at 2.09 miles, followed by Industrial Parkway at 1.69 miles and Stannie Street at 1.13 miles. A bore can pass beneath pavement without cutting it, with pits placed in dirt on either side where access allows.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 277 | US highway | 2.1 roadway miles inside | State highway office |
| Texas State Highway 131 | State highway | 0.9 roadway miles inside | State highway office |
| Hediondo Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Maverick County Canal | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the community or within 1 mile, so the mapped route inventory shows no nearby track crossing. Hediondo Creek is 0.6 miles outside the community boundary, and Maverick County Canal is 0.8 miles outside it. No named stream is mapped inside the community, and no street crossings of named streams are mapped there. The survey maps 2.76 miles of unnamed drainage inside the community, so a route near drainage still needs field review. No lakes or ponds are mapped within 1 mile.
Who approves a Radar Base bore in Maverick County?
US 277 and Texas State Highway 131 are highway routes, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Laredo District. The utility owner, not the drilling contractor, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing and work under the owner’s permit. Beneath existing highway pavement, TxDOT requires boring or tunneling, with encasement and the required cover. Radar Base has no city government, so street and permit authority rests with the county or state. Any proposed crossing of Hediondo Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are in the ground in Maverick County near Radar Base?
The water provider for a specific Radar Base address must be confirmed with Maverick County or the local water district before a bore is planned. EPA drinking water records for Texas do not tie systems to towns, so they do not establish which provider serves an individual address here. AEP Texas Central and Rio Grande Electric Cooperative report electric service in Maverick County. Before an electric conduit bore near Del Rio Boulevard, we confirm the line owner for that location rather than assume one provider serves every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central and Rio Grande Electric Cooperative | Electric utilities reporting service in Maverick County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place as small as Radar Base because the survey sample is too small to rely on. Its 14.59 public road centerline miles and 18 named streets mean a planned service route may follow roads such as Stannie Street or Industrial Parkway. September averages 3.2 inches of rain, the wettest month in Maverick County, so timing and access matter when ground is wet. We expose each marked utility on the bore path with hydrovac before drilling near it; paint shows position, not depth.

How far is Radar Base from Normandy and our Yukon office?
Radar Base is an unincorporated community in Maverick County at an elevation of 844 feet, covering 1.11 square miles in ZIP code 78852. Normandy is 5.3 miles northwest, and Elm Creek is 6.0 miles southeast; Siesta Acres is 7.4 miles south. Eagle Pass, the county seat and nearest larger city, is 10.3 miles south. The Yukon, Oklahoma main office is 581 road miles away, a drive of 11.6 hours, so the distance is part of planning a bore along US 277 or another local route.
Places near Radar Base
- Directional boring in Normandy: 5.3 miles northwest
- Directional boring in Elm Creek: 6 miles southeast
- Directional boring in Siesta Acres: 7.4 miles south
- Directional boring in Seco Mines: 7.6 miles south
- Directional boring in Quemado: 8.3 miles northwest
- Directional boring in Eagle Pass: 10.3 miles south
What boring work comes up near Stannie Street in Radar Base?
- Highway crossing: A route beneath US 277 or Texas State Highway 131 is planned around pavement, right of way access and the TxDOT permit.
- Street service: A water or sewer line along Stannie Street can pass beneath the pavement, with pits set in accessible dirt at each end.
- Fiber conduit: A proposed fiber route along Industrial Parkway needs marked utilities exposed before the drill approaches the alignment.
- Creek approach: A bore near Hediondo Creek needs route review and a check for U.S. Army Corps of Engineers jurisdiction during planning.
- Airport utility: A conduit route serving the area near Maverick County Memorial International Airport needs its address, line size and crossing path scoped.
- Drainage crossing: A route near the unnamed drainage mapped in Radar Base needs field review so the bore profile accounts for the channel.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Radar Base bore under US 277?
A map pin matters for a Radar Base quote because a route near US 277 has different access and crossing details from one along Del Rio Boulevard. Send the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us review the proposed path and spot the crossings that need attention.
Price follows the scope, not just the length. Elindio clay loam can affect drilling and reaming; crossings of US 277 or concrete and pavement change the plan. The route may also call for utility exposure, pits, excavator time or sand backfill. Mobilization matters because Radar Base is 581 road miles from Yukon. Creek or drainage crossings, pipe size, footage, and high profile or emergency work also shape the equipment and planning needed.
Questions people ask about boring in Radar Base
Does Trinity take directional boring jobs in Maverick County around Radar Base?
Yes. We take directional boring work in Radar Base and across Texas, with our own crews and partner contractor crews working from vetted satellite yards. The customer works with Trinity from the first call through the bore log, whichever crew is on site. Send the route location near a place such as US 277 so we can review the scope.
Who controls Stannie Street in Radar Base, and can a bore avoid cutting it?
Radar Base has no city government, so street authority belongs to the county or state. Directional boring can pass beneath Stannie Street without opening the pavement when the route and site conditions allow. We place entry and exit pits in dirt where there is room and check marked lines before drilling.
Does Elindio soil in Radar Base create a corrosion concern for steel pipe?
The USDA soil survey maps high steel corrosion risk across 86 percent of Radar Base. For a route through Elindio soil, the line owner should consider the material and protection for steel casing and tracer wire. HDPE does not share that mapped steel concern, and the line owner selects materials for the project.
What is Elindio soil like about 40 inches down in Radar Base?
The USDA soil survey maps clay loam under 86 percent of Radar Base at about 40 inches below the surface, with an average clay content of 38 percent. Elindio association covers 80 percent of the mapped area. That clay can stick to the reamer, so staged reaming and careful fluid control matter.
Will a Radar Base bore hit rock near US 277?
Bedrock is not mapped in the top five feet of Radar Base, but that does not rule out deeper rock near US 277. The geologic map identifies Uvalde Gravel of Cenozoic age and Mesozoic sedimentary rocks, including carbonate and shale. We use the planned profile and field conditions to guide the equipment choice.
Who permits a Radar Base bore under US 277?
The utility owner applies for a TxDOT utility permit for work in the US 277 right of way. The TxDOT Laredo District reviews the application submitted through RULIS, while we prepare the bore plan and profile for the owner. TxDOT requires boring or tunneling beneath existing highway pavement.
Can I reach Trinity after hours about an urgent bore near Stannie Street in Radar Base?
Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423, including after hours for an urgent issue near Stannie Street. We can take the location and scope details, then determine what response is needed for the site and proposed utility work.
How much notice does Texas811 need for a Radar Base bore near Del Rio Boulevard?
For a bore near Del Rio Boulevard, Texas811 needs the locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before work. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed before work continues.
What affects the cost of a directional bore in Radar Base under US 277?
The scope sets the price for a US 277 bore, including length, pipe size, soil conditions and the utilities that must be exposed. Pavement, pits and equipment time also matter. Elindio clay loam can affect the drilling plan, while the 581 road miles from Yukon make mobilization a factor. Creek or drainage crossings can add planning needs.
Where the Radar Base facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Radar Base
- U.S. Census Bureau, TIGER/Line 2024: Radar Base boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Radar Base population count
- Macrostrat geologic map compilation: map units under Radar Base
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Maverick County
- U.S. Geological Survey, Elevation Point Query Service: Radar Base elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Radar Base
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Radar Base
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Radar Base, Texas
Type the address of your job in Radar Base. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.