Mosheim Texas Directional Boring: Silty Clay, FM 215 And Live Oak Creek
Quick Answer: Mosheim is an unincorporated community in Bosque County, so county or state authorities own its roads; we do directional boring, also called horizontal directional drilling (HDD), for crossings near Live Oak Creek. The Yukon main office is 305 road miles away, and FM 215 is one local route a bore may need to pass beneath. USDA maps show Mosheim silty clay across 38 percent of the community. Sticky clay can build on a reamer and grip the pipe, so the reaming and pullback plan matters.
Mosheim bores at a glance
- Unincorporated community in Bosque County, Texas. Population 48 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 305 miles, about 6.3 hours of driving.
- Ground: Mosheim soil is mapped on 38 percent of the area, with silty clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 68 percent of the area.
- Highways inside the boundary: FM 215. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Live Oak Creek.
- Public water: Mosheim Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near FM 215 in Mosheim?
Mosheim is an unincorporated community in Bosque County, with 48 people counted in the 2020 Census. We take directional boring work for water, sewer, gas, electric conduit and fiber, routing lines beneath Farm Road 217, FM 215 or other access points where the plans call for it. A sketch helps show the line path and nearby crossings.
Our main office is in Yukon, Oklahoma, and Mosheim work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, with directional boring work since 1982. We have gone over 25 years without a utility strike, a record we carry into planning near Mosheim Water Supply Corporation lines and the electric providers reported in Bosque County.

How does Mosheim soil affect a bore in Mosheim?
The USDA soil survey maps Mosheim soil across 38 percent of the community, with Krum at 16 percent and Searsville at 13 percent. At the surface, silty clay covers 47 percent of the mapped area and clay another 39 percent. About 40 inches down, the survey maps silty clay in 38 percent of the area, clay in 18 percent and bedrock in 28 percent. These are mapped soil patterns, not test borings. The clay can stay on the reamer, so staged reaming and a ready pipe string help limit the time an open hole is exposed.
| USDA soil survey, inside the Mosheim mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Mosheim 38 percent, Krum 16 percent, Searsville 13 percent, San Saba 11 percent and Frio 7 percent |
| Texture at the surface | silty clay 47 percent, clay 39 percent and clay loam 10 percent |
| Texture about 40 inches down | silty clay 38 percent, bedrock 28 percent and clay 18 percent |
| Engineering class about 40 inches down | fat clay (CH) 63 percent and lean clay (CL) 9 percent |
| Average clay content about 40 inches down | 44 percent |
| Bedrock mapped within 60 inches | 68 percent of the area (30 percent hard rock, 38 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 88 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 68 percent of Mosheim, including hard bedrock in 30 percent and weathered bedrock in 38 percent; typical depth is 38 inches. A soil to rock contact can push a drill head off line, and rock may slow the bore. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 7 percent, including ground to consider near Live Oak Creek. High steel corrosion risk is mapped across 88 percent. The Cenozoic Stony Calcareous Clay Solution Residuum includes clay and limestone, so ground conditions can change along a path.
What does it take to bore Mosheim silty clay?
Mosheim’s mapped silty clay and clay can cling to the reamer, while bedrock is mapped within 60 inches across much of the area. We match the fluid and reaming sequence to the ground along each proposed path.
- Because Mosheim soil maps substantial silty clay, we use thinner drilling fluid with polymer and ream in stages to limit clay buildup on the tool.
- Heavy clay is mapped at depth in Mosheim, so we watch fluid returns and keep pressure controlled where a bore passes under pavement on FM 215.
- With bedrock mapped within 60 inches across 68 percent of the area, we check depth and pitch as the drill moves through soil to rock transitions.
- Before a bore near Live Oak Creek, we expose marked utilities with hydrovac potholes, then track the drill head from the surface and log its depth and pitch.

Which roads or creeks could a Mosheim bore cross near Live Oak Creek?
FM 215 is the state highway mapped inside the Mosheim community boundary, with 0.2 roadway miles there. Farm Road 217 is the longest named street, at 1.33 miles inside the boundary. Public road centerlines total 2.2 miles, but only one named street is listed, so a route plan should identify the actual access road rather than assume other street names. A bore can pass below pavement without cutting it, with entry and exit pits placed beyond the surface to be protected.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 215 | State highway | 0.2 roadway miles inside | State highway office |
| Live Oak Creek | Stream | 1.18 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Mosheim or within one mile outside the community boundary, and no mapped street and rail crossing is listed. Live Oak Creek runs for 1.18 channel miles inside the boundary, with one mapped street crossing of a named stream. Creek work needs a planned path that stays below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. No lakes or ponds are mapped within one mile.
Who signs off on a Mosheim bore in Bosque County?
Mosheim has no city government, so street authority is with Bosque County or the state, depending on the road. For work in FM 215 right of way, the utility owner, not our drilling crew, submits the utility application through TxDOT’s RULIS system. TxDOT’s Waco District reviews it; we prepare the bore plan and profile for the utility owner’s filing. TxDOT cover rules set depths by line type, including 60 inches for water at a highway crossing and 60 inches for electric or communication lines. The district may set a different depth in the permit. Live Oak Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near Mosheim Water Supply Corporation?
Mosheim Water Supply Corporation serves 282 people through 94 service connections, and its public water system draws from groundwater wells. Electric providers reporting service in Bosque County are Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the owner at every address, so we confirm the line owner before sizing an electric conduit bore near Farm Road 217.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Mosheim Water Supply Corporation | Public water system | Groundwater wells | 94 connections, 282 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Bosque County | EIA Form 861 | Confirm the line owner by address |
Housing figures are not published for a place as small as Mosheim, so a proposed line along FM 215 should be checked against the actual site rather than an assumed construction era. Longer service runs can matter where homes sit away from the water system’s lines. Bosque County averages 35.9 inches of precipitation a year, with May averaging 4.4 inches. Before drilling near Mosheim Water Supply Corporation or an electric line, we expose marked utilities with hydrovac potholes because surface marks do not show burial depth.

Do you cover Mosheim and nearby Gatesville?
Mosheim is in Bosque County, at elevation 930 feet, and covers 0.68 square mile within its mapped community boundary. Its ZIP code is 76689. Valley Mills is 7.7 miles east, Clifton is 10.4 miles north, and Crawford is 11.1 miles southeast. Gatesville, the nearest larger city, is 15.9 miles southwest; Meridian, the county seat, is 20.5 miles north. Our Yukon, Oklahoma main office is 305 road miles away, a 6.3 hour drive, so that distance is part of mobilization planning for work near Live Oak Creek or FM 215.
Places near Mosheim
- Directional boring in Valley Mills: 7.7 miles east
- Directional boring in Clifton: 10.4 miles north
- Directional boring in Crawford: 11.1 miles southeast
- Directional boring in South Mountain: 14.1 miles south
- Directional boring in Oglesby: 15.7 miles south
- Directional boring in Gatesville: 15.9 miles southwest
What kinds of bores come up near Farm Road 217 in Mosheim?
- Highway crossing: A bore beneath FM 215 can keep the roadway surface intact, with the utility owner handling the TxDOT right of way filing.
- Water service: A connection near Farm Road 217 can tie into a planned route from Mosheim Water Supply Corporation’s groundwater system.
- Creek crossing: A Live Oak Creek bore needs a path beneath the channel and a jurisdiction check during planning.
- Electric conduit: Near FM 215, we first identify the line owner among providers reporting service in Bosque County and expose marked utilities.
- Fiber route: A fiber bore along Farm Road 217 can pass below the road surface, with pits placed outside the pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to quote a Mosheim bore under FM 215?
For a bore near FM 215, send the address or map pin first. Tell us what goes in the ground, such as water line or fiber conduit, then the pipe or conduit size and footage. A sketch or plans can show the route beneath Farm Road 217, the Live Oak Creek crossing or nearby utilities.
A short route through Mosheim silty clay with clear access may be simpler to plan than a long path through changing clay and bedrock. Price depends on bore length, pipe size, soil and rock, utilities to expose, pavement, creek crossings, pits and excavator time. FM 215 can bring right of way requirements into the plan, while Live Oak Creek adds crossing review. The 305 road miles from Yukon also affect mobilization. High profile or emergency work can add planning demands.
Questions people ask about boring in Mosheim
Does Trinity take directional boring jobs in Mosheim and Bosque County, and who staffs them?
Yes. We take directional boring jobs in Mosheim, with our own crews and partner contractor crews from vetted satellite yards supporting the work. You deal with Trinity from the first call through the bore log, whichever crew is on site. For a route near FM 215, we review the plans and access before mobilizing.
Who runs Mosheim’s water system, and where does its water come from?
Mosheim Water Supply Corporation owns the public water system, which uses groundwater wells. Public records list 94 service connections serving 282 people. For a new connection near Farm Road 217, the proposed route and point of connection help define the bore length and where existing lines need to be exposed.
Which electric company serves a Mosheim address in Bosque County, and who confirms conduit specs?
The county service reports list Oncor Electric Delivery Company, Texas-New Mexico Power, Heart of Texas Electric Cooperative and United Electric Cooperative Service. They do not show which provider owns every line at each Mosheim address. Confirm the line owner and conduit requirements before planning a bore near FM 215.
For Mosheim streets in Bosque County, is the county or state in charge, and must pavement be cut?
Mosheim has no city government, so Bosque County or the state has authority over a road, depending on its status. FM 215 is a state highway. TxDOT rules call for boring or tunneling beneath existing highway pavement, while a bore under Farm Road 217 can also avoid cutting the road surface.
Does Mosheim soil in Mosheim corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 88 percent of the Mosheim community. The line owner chooses any coating for steel casing or tracer wire. HDPE is not affected by that soil corrosion concern. The material choice for a route near Live Oak Creek depends on the line design and owner requirements.
What ground should I expect in Mosheim, including Mosheim soil about 40 inches down?
The USDA soil survey maps Mosheim soil across 38 percent of the area, with silty clay mapped in 38 percent at about 40 inches below the surface. Bedrock is mapped at that depth in 28 percent. A bore near FM 215 may meet sticky clay or a soil to rock transition, so the drill plan has to account for changing conditions.
How far is Mosheim from the Yukon office, and does nearby Gatesville change the job?
Mosheim is 305 road miles from our Yukon, Oklahoma main office, with a drive time of 6.3 hours. Gatesville is 15.9 miles southwest, but the work location in Mosheim still determines access, bore length and equipment needs. The Yukon distance is considered when planning mobilization for a route near Farm Road 217.
How early should I call Texas811 before a Mosheim bore on Farm Road 217, and what if marks move?
For Farm Road 217, submit a Texas811 locate request at least two working days before excavation, not counting Saturdays, Sundays or legal holidays. The request cannot be made earlier than 14 days before work. If the start slips more than 14 days past the original notice, file a new request; worn or moved marks must be refreshed before work continues.
What affects the cost of directional boring in Mosheim beneath FM 215?
The job scope sets the price, with length, pipe size, clay or bedrock, utility exposures, pavement, pits and creek crossings among the factors. A route beneath FM 215 may need TxDOT permit planning, while a Live Oak Creek crossing adds site review. The 305 road miles from Yukon affect mobilization, and emergency work can change the plan.
Where the Mosheim facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mosheim
- U.S. Census Bureau, TIGER/Line 2024: Mosheim boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Mosheim population count
- Macrostrat geologic map compilation: map units under Mosheim
- U.S. EPA Safe Drinking Water Information System: public water systems serving Mosheim
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bosque County
- U.S. Geological Survey, Elevation Point Query Service: Mosheim elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mosheim
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mosheim
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mosheim, Texas
Type the address of your job in Mosheim. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Mosheim
Same county: Meridian · Laguna Park · Walnut Springs · Morgan · Iredell · Cranfills Gap · Kopperl. All counties: Texas county list.