Quick Answer: At Lake Ridge Parkway, the top five feet include clay loam, silty clay and clay, and weathered bedrock is widely mapped below them. We do directional boring, also called horizontal directional drilling (HDD), in Cedar Hill, including routes beneath US 67. Cedar Hill is 230 road miles from our Yukon, Oklahoma main office, and Red Oak Creek crossings add a site feature to plan around. The USDA soil survey maps bedrock within 60 inches across 88 percent of the city, so a bore may need to move more slowly than one through soil alone.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Cedar Hill bores at a glance

  • Incorporated city in Dallas County and Ellis County, Texas. Population 49,618 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 230 miles, about 4.6 hours of driving.
  • Ground: Eddy soil is mapped on 46 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 88 percent of the area.
  • Highways inside the boundary: US 67 and FM 1382. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: BNSF Railway, with 12 mapped street and rail crossings.
  • Named streams inside the boundary: Red Oak Creek, Baggett Creek, Bentle Branch and Little Creek.
  • Public water: City of Cedar Hill, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Lake Ridge Parkway in Cedar Hill?

Cedar Hill is in Dallas County and Ellis County. The Census Bureau Vintage 2024 estimate puts its population at 49,618. Along Lake Ridge Parkway, Belt Line Road and US 67, our crews can install water, sewer, gas, electric conduit and fiber by boring beneath pavement or other surface features instead of opening a trench across them.

Our main office is in Yukon, Oklahoma, and Cedar Hill work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1965, our family business has handled directional boring since 1982, and we bring that experience to Cedar Hill work. Our 3/4 inch service lines to 48 inch casing range can fit a service crossing on Lake Ridge Parkway or a larger utility route.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does the Eddy soil map show in Cedar Hill?

The USDA soil survey maps Eddy as the largest soil series in Cedar Hill, covering 46 percent of the area. Surface textures are mainly clay loam at 44 percent, with silty clay and clay each at 26 percent. At about 40 inches below the surface, the survey maps bedrock across 84 percent of the area and clay across 11 percent. Average clay content at that depth is 55 percent. These are mapped patterns, not test borings, so a planned route still needs site specific review.

USDA soil survey, inside the Cedar Hill city limitsWhat is mapped
Soil series mappedEddy 46 percent, Austin 14 percent, Stephen 10 percent, Dalco 8 percent and Vertel 6 percent
Texture at the surfaceclay loam 44 percent, silty clay 26 percent and clay 26 percent
Texture about 40 inches downbedrock 84 percent and clay 11 percent
Engineering class about 40 inches downfat clay (CH) 21 percent
Average clay content about 40 inches down55 percent
Bedrock mapped within 60 inches88 percent of the area (0 percent hard rock, 88 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel52 percent of the area

Weathered bedrock is mapped within 60 inches across 88 percent of Cedar Hill, while hard bedrock is not mapped at that depth. The survey gives a typical bedrock depth of 18 inches, so the ground may slow as a bore meets rock. Seasonal water tables are not mapped within 60 inches, and flood prone soils cover 1 percent. High steel corrosion risk is mapped across 52 percent, which makes casing and tracer wire material a line owner decision. The mapped Austin Chalk is Late Cretaceous chalk; its presence supports planning for slower drilling where the bore meets rock.

How do we drill Cedar Hill ground with bedrock mapped so shallow?

Eddy clay loam and shallow mapped bedrock call for a bore plan that can handle sticky soil and a change in resistance. We track the drill head from the surface and log its depth and pitch as it advances.

  1. Eddy soils include clay loam, silty clay and clay; we use drilling fluid and staged reaming to manage sticky cuttings that can cling to the reamer.
  2. With weathered bedrock mapped widely within 60 inches, we slow the bore as ground resistance changes and check the drill head depth and pitch along the route.
  3. Where heavy clay occurs near a Cedar Hill pavement crossing, we watch fluid returns and keep pressure controlled to reduce the chance of lifting the surface.
  4. At a Red Oak Creek or Joe Pool Lake crossing, we plan the bore below the channel or water route and check for U.S. Army Corps of Engineers jurisdiction.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What might a Cedar Hill bore cross near BNSF Railway?

US 67 runs 13.9 mapped roadway miles inside Cedar Hill, and FM 1382 runs 13.4 miles. Lake Ridge Parkway is the longest named street at 7.15 miles, followed closely by Belt Line Road at 7.13 miles. Joe Wilson Road adds another 5.1 miles. A bore beneath an existing highway pavement is installed by boring or tunneling under TxDOT rules, so a route near US 67 needs to account for the highway right of way and its crossing plan.

CrossingTypeMapped extentWho has a say
US 67US highway13.9 roadway miles insideState highway office
FM 1382State highway13.4 roadway miles insideState highway office
BNSF RailwayRailroad6.76 track miles insideThe railroad
Union PacificRailroad nearby0.1 miles outsideThe railroad
Red Oak CreekStream5.27 channel miles insideChecked for Corps of Engineers jurisdiction
Baggett CreekStream3.37 channel miles insideChecked for Corps of Engineers jurisdiction
Bentle BranchStream3.01 channel miles insideChecked for Corps of Engineers jurisdiction
Little CreekStream2.95 channel miles insideChecked for Corps of Engineers jurisdiction
Hollins BranchStream1.38 channel miles insideChecked for Corps of Engineers jurisdiction
Stewart BranchStream1.23 channel miles insideChecked for Corps of Engineers jurisdiction
Sanders BranchStream1.17 channel miles insideChecked for Corps of Engineers jurisdiction
Bee BranchStream0.72 channel miles insideChecked for Corps of Engineers jurisdiction
Bedford BranchStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Horne Branch CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 6.76 track miles inside Cedar Hill, and the map shows 12 street and rail crossings. Any route beneath its track needs a crossing agreement with BNSF Railway. Red Oak Creek has 5.27 channel miles in the city, while Baggett Creek has 3.37; the map shows 34 street crossings of named streams. Joe Pool Lake is also inside city limits, so water crossings need review for federal jurisdiction during planning.

Who has to approve Cedar Hill work in Dallas County?

Cedar Hill is an incorporated city, so its city streets belong to the city; no city permit form or fee is assumed here. US 67 and FM 1382 are state routes, and work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Dallas District. The utility owner files in TxDOT’s RULIS system; we prepare the bore plan and profile for its application and work under the permit issued to that owner. A crossing beneath BNSF Railway needs an agreement from the railroad. Red Oak Creek and Joe Pool Lake crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near the City of Cedar Hill water system, so we can coordinate the crossing?

The City of Cedar Hill public water system uses purchased surface water and reports 17,258 service connections serving 50,904 people. For a conduit route near Lake Ridge Parkway, the electric line owner also needs to be confirmed before the bore is planned. Utilities reporting service in Dallas County include Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric Cooperative; that list does not identify the provider at each address.

Line ownerWhat it isSourceSize
City of Cedar HillPublic water systemSurface water bought from another system17,258 connections, 50,904 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric CooperativeElectric utilities reporting service in Dallas County and Ellis CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use Cedar Hill’s median housing year of 1994 from the American Community Survey 2019 to 2023 five year estimates to inform underground work planning. Three percent of housing was built before 1960, 60 percent from 1960 to 1999 and 37 percent in 2000 or later. That mix can mean work on older lines as well as new services near US 67. Before drilling near marked utilities, we use hydrovac potholing to expose them; marks show position, not depth. That check matters around both the City of Cedar Hill water system and electric conduit routes.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Cedar Hill from Grand Prairie and our Yukon office?

Cedar Hill covers 35.79 square miles in Dallas and Ellis counties and sits at an elevation of 811 feet. We account for Cedar Hill’s ZIP codes, 75104 and 76065, when confirming the location and scope of underground work. Duncanville is 5.0 miles northeast, Ovilla is 5.3 miles southeast, and DeSoto is 5.7 miles east. Grand Prairie, the nearest larger city, is 7.9 miles northwest; Dallas, the county seat, is 18.3 miles northeast. Our Yukon yard is 230 road miles away, a 4.6 hour drive, so distance can affect mobilization for work near Lake Ridge Parkway.

Places near Cedar Hill

What would we bore near Red Oak Creek in Cedar Hill?

  • Highway crossing: A bore beneath US 67 or FM 1382 can pass below pavement instead of cutting across the highway surface.
  • Water service: A connection near the City of Cedar Hill water system can run beneath Lake Ridge Parkway with marked utilities exposed first.
  • Fiber route: Fiber conduit along Belt Line Road can use a bore to cross pavement while keeping the surface intact.
  • Creek crossing: A Red Oak Creek route can pass beneath the channel, with jurisdiction checked during planning.
  • Rail crossing: A route under BNSF Railway needs a railroad agreement to set the crossing conditions.
  • Lake route: A bore near Joe Pool Lake needs its crossing conditions considered during planning.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Cedar Hill work near US 67?

For a Cedar Hill quote, start with an address or map pin, such as a site along US 67 or Lake Ridge Parkway. Tell us what will go underground, whether it is a water line, sewer line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show creek, roadway and utility crossings.

The price follows the work itself. Ground conditions such as Eddy clay and Austin Chalk can affect drilling time; crossings of US 67, BNSF Railway or Red Oak Creek add planning and coordination. Pipe size, bore length, marked utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill all matter. Cedar Hill’s 230 road miles from Yukon also affect mobilization. For Cedar Hill work, high profile or emergency work can change the scope, so we confirm the boring plan before proceeding.

Questions people ask about boring in Cedar Hill

Does Trinity Boring Solutions take Cedar Hill jobs in Dallas County, and who staffs them?

Yes. We take directional boring work in Cedar Hill, with our own crews and crews from satellite yards run by drilling partners we have vetted. The customer works with Trinity from the first call through the bore log, whichever crew is on site. A route near Lake Ridge Parkway can be scoped from the address and plans.

Is there rock under Cedar Hill, and how much is mapped within five feet?

Yes, weathered bedrock is mapped within 60 inches across 88 percent of Cedar Hill, and the USDA soil survey gives a typical depth of 18 inches. We account for Cedar Hill conditions because hard bedrock is not mapped within that depth, while confirming site conditions before boring. A route near Eddy soils may still need slower drilling where the bore meets weathered rock.

Who approves a Cedar Hill bore under US 67?

The utility owner applies for a TxDOT utility permit for work in the US 67 right of way. The TxDOT Dallas District reviews the filing in RULIS, and we prepare the bore plan and profile for the owner’s application. A highway pavement crossing is installed by boring or tunneling under TxDOT rules.

What does a Cedar Hill bore under BNSF Railway need?

A crossing beneath BNSF Railway needs an agreement from the railroad that owns the track. For Cedar Hill crossings, we follow the agreement’s casing, depth and flagging details when planning our boring setup. The railroad has 6.76 track miles inside Cedar Hill, so the planned route needs to identify whether it reaches the track.

Can a line be bored beneath Red Oak Creek in Cedar Hill?

Yes, a bore can be planned beneath Red Oak Creek rather than cutting its channel. The creek has 5.27 channel miles in Cedar Hill, and its crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The route and depth depend on the site conditions.

Who runs Cedar Hill’s public water system, and where does its water come from before we plan a crossing?

The City of Cedar Hill owns and runs the public water system, which uses purchased surface water. Cedar Hill public records list 17,258 service connections and 50,904 people served, which we consider when planning underground work near the system. Near Lake Ridge Parkway, the water system’s presence makes it important to locate and expose marked lines before drilling close to them.

How much 811 notice does a Cedar Hill bore near Lake Ridge Parkway need?

Texas811 needs a locate request at least 48 hours before excavation, not counting weekends or legal holidays, and no earlier than 14 days before work. If a Lake Ridge Parkway start slips more than 14 days past the original notice, submit a new request. Before work continues in Cedar Hill, we refresh worn or moved marks through Texas811 to keep crossing marks current.

How far is Cedar Hill from Yukon, and does Grand Prairie change the job?

From our Yukon, Oklahoma main office, Cedar Hill is 230 road miles and a 4.6 hour drive, which we factor into scheduling. Grand Prairie is 7.9 miles northwest of Cedar Hill, but that does not change the bore design. Distance from Yukon can affect mobilization for a job near US 67.

What affects the cost of a directional bore in Cedar Hill near US 67?

The job details determine the price, with no single factor deciding it. Eddy clay and Austin Chalk affect the ground work; US 67, BNSF Railway and Red Oak Creek can add crossing requirements. Bore length, pipe size, potholing, pavement, pits, excavator time, backfill and mobilization from Yukon also shape the scope.

Where the Cedar Hill facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Cedar Hill

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Cedar Hill, Texas

Type the address of your job in Cedar Hill. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Cedar Hill

County: Ellis County directional boring. Same county: Dallas · Irving · Garland · Mesquite · Richardson · Rowlett · Carrollton · Lancaster · Coppell · Farmers Branch · Balch Springs · University Park. All counties: Texas county list.