Keene Texas Directional Boring: Crosstell Soil, US 67 and Turkey Creek
Quick Answer: Can we get your line under US 67 without cutting the pavement? Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Keene, Texas, including road crossings. Keene is 240 road miles from our Yukon, Oklahoma main office, and the BNSF Railway track also calls for careful crossing plans. Crosstell soil covers 50% of the city, while clay is common about 40 inches down. Sticky clay can build up on the reamer, so we match the drilling fluid and reaming steps to the ground.
Keene bores at a glance
- Incorporated city in Johnson County, Texas. Population 6,930 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 240 miles, about 4.7 hours of driving.
- Ground: Crosstell soil is mapped on 50 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 50 percent of the area.
- Highways inside the boundary: US 67, US 67 Business, FM 2280, Spur 102 and FM 3048. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: BNSF Railway, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Turkey Creek and Lockett Branch.
- Public water: City of Keene, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring under US 67 in Keene?
Can we put your line under a road or track without cutting across it? We take directional boring work in Keene and across Texas, including routes along US 67 in Johnson County. The Census Bureau Vintage 2024 estimate puts Keene at 6,930 people. We install water, sewer, gas, electric conduit and fiber lines beneath local roads such as Henderson Street, with the route planned around existing utilities.
Our main office is in Yukon, Oklahoma, and Keene work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Keene’s City of Keene water system and the electric providers reporting in Johnson County make utility protection part of the plan. Our family business began in 1965, and we have done directional boring since 1982, with no utility strike in over 25 years.

What does the Crosstell soil survey show in Keene?
The USDA soil survey maps Crosstell soil across 50% of Keene, including Crosstell fine sandy loam on 30% of the mapped area at 3 to 8 percent slopes and 20% at 1 to 3 percent slopes. Fine sandy loam is the surface texture across 86% of the city. At about 40 inches below the surface, clay is mapped under 50% of the area, sandy clay loam under 29%, and clay loam under 16%. In Keene, we use these mapped patterns for planning, not as test borings. The clay can cling to a reamer and grip the pipe.
| USDA soil survey, inside the Keene city limits | What is mapped |
|---|---|
| Soil series mapped | Crosstell 50 percent, Gasil 24 percent, Rader 15 percent, Silstid 5 percent and Pulexas 3 percent |
| Texture at the surface | fine sandy loam 86 percent and loamy fine sand 11 percent |
| Texture about 40 inches down | clay 50 percent, sandy clay loam 29 percent and clay loam 16 percent |
| Engineering class about 40 inches down | fat clay (CH) 50 percent, lean clay (CL) 40 percent and clayey sand (SC) 5 percent |
| Average clay content about 40 inches down | 37 percent |
| Bedrock mapped within 60 inches | 50 percent of the area (0 percent hard rock, 50 percent weathered rock) |
| Seasonal water table within 60 inches | 15 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 66 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 50% of Keene, with typical bedrock depth at 50 inches; hard bedrock is not mapped in that depth range. A seasonal water table is mapped within 60 inches across 15%, and flood prone soils cover 4%, so pits and creek routes need planning for water. High steel corrosion risk is mapped across 66%, a concern for uncoated steel casing and tracer wire. The Woodbine Formation, a Late Cretaceous sandstone and mudstone unit, is mapped here; weathered rock can slow a bore compared with soil.
How do we bore through clay in Keene?
Crosstell fine sandy loam gives way to clay in much of Keene at about 40 inches. We plan the fluid, reaming sequence and pullback around that mapped ground, while checking the route for utilities and changes in material.
- Crosstell ground has clay mapped under 50% of Keene at about 40 inches, so we use a staged reaming plan to manage material that sticks to the tools.
- Where Keene’s mapped heavy clay is present, we watch fluid returns and keep pressure controlled near pavement to reduce the chance of lifting it.
- The Woodbine Formation includes sandstone and mudstone, and weathered bedrock is mapped in places; we slow down and track the head as ground conditions change.
- Before a bore near Henderson Street, we hydrovac each marked utility on the path; the locator shows position, while potholing confirms its depth.

Where might a line go under Henderson Street in Keene?
US 67 has 11.9 mapped roadway miles inside Keene, and US 67 Business has 1.9. FM 2280, Spur 102 and FM 3048 also run within the city, so a crossing route can involve state highway right of way. At Keene highway crossings, we follow TxDOT rules to bore or tunnel beneath existing highway pavement. Henderson Street is the longest named street at 4.39 miles, followed by Old Betsy Road at 2.42 miles and Katherine P Rains Road at 1.69 miles. Those streets help define possible routes, but each bore still needs a site specific plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 11.9 roadway miles inside | State highway office |
| US 67 Business | US highway | 1.9 roadway miles inside | State highway office |
| FM 2280 | State highway | 4.1 roadway miles inside | State highway office |
| Spur 102 | State highway | 0.7 roadway miles inside | State highway office |
| FM 3048 | State highway | 0.6 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 1.01 track miles inside | The railroad |
| Turkey Creek | Stream | 1.65 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Lockett Branch | Stream | 1.23 channel miles inside | Checked for Corps of Engineers jurisdiction |
| East Buffalo Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway owns 1.01 track miles inside Keene, and the mapped street and rail crossings total 3. Turkey Creek runs 1.65 channel miles in the city, while Lockett Branch runs 1.23; 13 street crossings of named streams are mapped. A bore under either creek needs a route planned below the channel, with U.S. Army Corps of Engineers jurisdiction checked during planning. No lakes or ponds are mapped within one mile, so the named streams are the water crossings to focus on.
Who signs off on a BNSF Railway or US 67 bore in Keene?
US 67, US 67 Business, FM 2280, Spur 102 and FM 3048 are state routes, so work in their right of way goes through TxDOT’s Fort Worth District. The utility owner submits the application in TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the permit issued to that owner. TxDOT rules require boring or tunneling beneath existing highway pavement, and the permit may set cover depths. Keene’s city streets belong to the city itself. A crossing of BNSF Railway track needs an agreement with BNSF, and Turkey Creek planning includes a check for federal waterway jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should a Keene bore plan account for near the City of Keene?
The City of Keene public water system uses purchased surface water and serves 6,863 people through 2,428 service connections. Electric service reported in Johnson County includes Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the provider at every Keene address, so we confirm the line owner before planning an electric conduit bore. We hydrovac marked utilities along a route near Henderson Street before the drill approaches them; paint shows position, not depth.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Keene | Public water system | Surface water bought from another system | 2,428 connections, 6,863 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Johnson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Keene’s median housing year at 1985, which we consider when planning underground work. The survey estimates 3% of housing was built before 1960, 76% from 1960 to 1999 and 21% in 2000 or later. A project along 4th Street could involve replacement work or a new service, and the age mix alone cannot show which lines are present. We expose marked utilities on the planned bore path before drilling near them.

How far is Keene from Coyote Flats and our Yukon office?
Keene is an incorporated city in Johnson County, with an elevation of 889 feet and a land area of 5.22 square miles. We plan underground work in Keene, whose ZIP codes are 76059, 76031 and 76009. Coyote Flats is 3.3 miles southeast; Joshua is 5.6 miles northwest; and Cleburne is 5.9 miles southwest. Cleburne is both the nearest larger city and the county seat. The Yukon yard is 240 road miles away, a 4.7 hour drive, so distance is part of planning mobilization for work along US 67 or a local street.
Places near Keene
- Directional boring in Coyote Flats: 3.3 miles southeast
- Directional boring in Joshua: 5.6 miles northwest
- Directional boring in Cleburne: 5.9 miles southwest
- Directional boring in Cross Timber: 6 miles north
- Directional boring in Alvarado: 6.6 miles east
Which jobs call for a bore near Katherine P Rains Road in Keene?
- Highway crossing: A bore beneath US 67 can keep the existing pavement uncut, with its route and cover planned for TxDOT review.
- Water service: A connection near 4th Street can be routed to the City of Keene system after the existing water line is located and exposed.
- Fiber conduit: A fiber route along Henderson Street can pass beneath pavement, with marked utilities exposed before drilling near them.
- Creek crossing: A Turkey Creek bore needs a profile planned below the channel and a jurisdiction check during planning.
- Rail crossing: A bore beneath the BNSF Railway track needs a crossing agreement that sets the conditions for the rail route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near 4th Street in Keene?
For a Keene quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us see how the route meets 4th Street. Include the pit locations if you have them. That gives us a starting scope to review against marked utilities and the intended crossing.
The job details shape the price, grouped by ground, crossings and logistics. Crosstell clay and the mapped weathered bedrock can affect drilling and reaming. Crossing US 67 or BNSF Railway adds planning requirements, while a Turkey Creek route brings channel conditions into the scope. We also look at bore length, pipe or conduit size, exposed utilities, pavement, pits, excavator time and backfill. Keene’s 240 road miles from Yukon affects mobilization, and emergency or high profile work can change the plan.
Questions people ask about boring in Keene
Does Trinity take directional boring jobs in Keene and Johnson County, and who staffs them?
Yes. We take Keene work with our own crews and with partner drilling contractors operating from satellite yards we have vetted. Our main office is in Yukon, Oklahoma, and we stay involved through the bore log regardless of which crew is on site. That lets you discuss a route along Henderson Street with Trinity from the first call.
How much rock is mapped in Keene for a directional bore?
The USDA soil survey maps weathered bedrock within 60 inches across 50% of Keene, with typical bedrock depth at 50 inches. Hard bedrock is not mapped in that range, but the Woodbine Formation includes sandstone and mudstone. Those maps guide planning; they are not a substitute for site specific ground information.
Who approves a Keene bore beneath US 67, and which TxDOT office reviews it?
For work in US 67 right of way, the utility owner applies through TxDOT’s online RULIS system, and TxDOT’s Fort Worth District reviews it. For an owner’s Keene application, we provide the bore plan and profile needed for review. TxDOT requires boring or tunneling beneath existing highway pavement, with cover conditions set through the permit.
What does a Keene bore under BNSF Railway track require?
A crossing beneath the 1.01 track miles of BNSF Railway in Keene needs an agreement with the railroad. That agreement sets crossing conditions such as casing, depth and flagging. Three mapped street and rail crossings are in the city, so the route needs to be checked against the actual track location.
Can you bore a line under Turkey Creek in Keene?
A bore under Turkey Creek can be planned, with the profile set to pass below the channel. The creek has 1.65 channel miles inside Keene, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. The route and ground conditions determine the final bore plan.
Who runs Keene’s public water system, and where does its water come from?
The City of Keene owns and runs the public water system, which uses purchased surface water. Public records list 2,428 service connections and 6,863 people served, figures we consider when planning underground work in Keene. Before a bore near a water line on 4th Street, we expose marked utilities along the planned path so the drill route can account for them.
What bore sizes and lengths can you handle for a Keene job near 4th Street?
For Keene work, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. For a route near 4th Street, the needed size and length depend on the line and the crossing. A sketch helps show the entry and exit points.
How early should I call Texas811 for a Keene bore along Henderson Street?
The person planning the bore calls Texas811 and describes the route, such as a crossing along Henderson Street. Texas law requires notice at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the price of directional boring under US 67 in Keene?
The scope sets the price: length, pipe size, Crosstell clay or weathered rock, exposed utilities, pavement, pits, backfill and creek or rail crossings all matter. A US 67 permit route or BNSF Railway crossing can add planning needs. Mobilization also reflects Keene’s 240 road miles from the Yukon yard.
Where the Keene facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Keene
- U.S. Census Bureau, TIGER/Line 2024: Keene boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Keene
- U.S. Census Bureau, American Community Survey 2019 to 2023: Keene housing units and year built
- Macrostrat geologic map compilation: map units under Keene
- U.S. EPA Safe Drinking Water Information System: public water systems serving Keene
- U.S. Department of Transportation, North American Rail Network: track owners in Johnson County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Johnson County
- U.S. Geological Survey, Elevation Point Query Service: Keene elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Keene
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Keene
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Keene, Texas
Type the address of your job in Keene. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Keene
Same county: Burleson · Venus · Mansfield · Pecan Plantation · Godley · Grandview · Rio Vista · Briaroaks · Cresson · The Homesteads. All counties: Texas county list.
