Jarrell Texas Directional Boring: Castephen Silty Clay, Interstate 35, Donahoe Creek
Quick Answer: Directional boring, also called horizontal directional drilling (HDD), lets us place a line beneath Interstate 35 in Jarrell without opening the pavement. Jarrell sits 361 road miles from our Yukon, Oklahoma main office, and Donahoe Creek is a local crossing to plan around. The USDA soil survey maps Castephen soil across 37 percent of Jarrell, with silty clay common near the surface. Bedrock is mapped within 40 inches across 76 percent of Jarrell, so a bore may move from sticky soil into chalk and need slower cutting.
Jarrell bores at a glance
- Incorporated city in Williamson County, Texas. Population 5,151 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 361 miles, about 6.9 hours of driving.
- Ground: Castephen soil is mapped on 37 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 76 percent of the area.
- Highways inside the boundary: Interstate 35 and FM 487. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Donahoe Creek.
- Public water: City of Jarrell, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Donahoe Creek in Jarrell?
Trinity Boring Solutions takes directional boring work in Jarrell, where the USDA soil survey maps silty clay at the surface and bedrock within 40 inches across 76 percent of the area. The Census Bureau Vintage 2024 estimate puts Jarrell’s population at 5,151 in Williamson County. We can route water, sewer, gas, electric conduit or fiber beneath a Jarrell street or alongside Interstate 35, with the bore plan matched to the line and route.
Our main office is in Yukon, Oklahoma, and Jarrell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have focused on directional boring since 1982. That experience covers work from 3/4 inch service lines to 48 inch casing, including routes beneath Jarrell streets or near Donahoe Creek.

What is Castephen soil like to bore in Jarrell?
Jarrell’s USDA soil survey maps Castephen as the leading soil series, covering 37 percent of the city, with Austin soil mapped across 33 percent. Silty clay is the surface texture across 75 percent of the area, while clay accounts for 23 percent. At about 40 inches below the surface, the survey maps bedrock across 76 percent and clay across 24 percent. We treat Castephen, Austin, Houston Black, and Heiden as mapped soil patterns, not test borings. Sticky clay can cling to a reamer and grip pipe, so the bore plan may call for staged reaming and a timely pull.
| USDA soil survey, inside the Jarrell city limits | What is mapped |
|---|---|
| Soil series mapped | Castephen 37 percent, Austin 33 percent, Houston Black 16 percent, Heiden 8 percent and Denton 4 percent |
| Texture at the surface | silty clay 75 percent and clay 23 percent |
| Texture about 40 inches down | bedrock 76 percent and clay 24 percent |
| Engineering class about 40 inches down | fat clay (CH) 24 percent |
| Average clay content about 40 inches down | 53 percent |
| Bedrock mapped within 60 inches | 76 percent of the area (4 percent hard rock, 72 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 80 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 76 percent of Jarrell, with a typical depth of 23 inches; weathered bedrock makes up most of that mapped area. The Austin Chalk is a Late Cretaceous geologic unit, so chalk may mean slower drilling than soil. Seasonal water tables and flood prone soils are not mapped in the survey. High steel corrosion risk is mapped across 80 percent of the area, a consideration for the line owner when choosing steel casing or tracer wire materials.
What does it take to bore Jarrell bedrock and clay?
Jarrell’s mapped Castephen silty clay and shallow Austin Chalk call for a bore plan that accounts for sticky soil and possible rock. We track the drill head from the surface and record depth and pitch along the route.
- Clay control: Jarrell’s silty clay can stick to the reamer and grip pipe, so we can ream in stages and keep the pull close to the opening of the hole.
- Chalk contact: Austin Chalk is mapped beneath Jarrell, so we allow for slower cutting and monitor the drill path as it moves from soil into rock.
- Utility exposure: Before drilling near a marked line along Walter Way, we hydrovac pothole it because surface locate marks show position but not depth.
- Creek route: A Donahoe Creek bore needs a planned path below the channel, with the crossing checked for U.S. Army Corps of Engineers jurisdiction.

What is in the way of a new line near 2nd Street in Jarrell?
Interstate 35 and FM 487 are the two highways mapped inside Jarrell, with 15.0 roadway miles of Interstate 35 and 4.5 miles of FM 487 inside the city. A bore route may also meet local streets: 2nd Street runs 0.98 miles in Jarrell, C Bud Stockton Loop runs 0.86 miles, and Walter Way runs 0.81 miles. We plan each crossing around pavement and marked underground lines, so the alignment and pit locations are set before drilling.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 15 roadway miles inside | State highway office |
| FM 487 | State highway | 4.5 roadway miles inside | State highway office |
| Donahoe Creek | Stream | 0.21 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Willis Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| North Fork Donahoe Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Opossum Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
| Glasscock Branch | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Jarrell or within 1 mile of its limits, so the mapped street and rail crossing count is none. Donahoe Creek runs 0.21 channel miles inside the city, but no street crossing of a named stream is mapped there. Willis Creek and North Fork Donahoe Creek are each 0.1 miles from the city limits. Creek routes still need planning for channel depth and a check for federal waterway jurisdiction.
Who approves a bore under Interstate 35 in Jarrell?
A bore beneath Interstate 35 or FM 487 needs a TxDOT utility permit for work in the highway right of way, reviewed by the TxDOT Austin District. The line owning utility submits the application through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing and work under the utility owner’s permit. At an Interstate 35 crossing, the listed cover is 60 inches for electric, communication and water lines, and for pressurized sewer. Donahoe Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. No railroad crossing is mapped in Jarrell.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Williamson County near Jarrell?
The City of Jarrell owns its public water system, which uses purchased surface water and serves 3,450 people through 1,150 service connections. Electric service reporters in Williamson County include Oncor Electric Delivery Company, Austin Energy, City of Georgetown, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. The specific line owner is confirmed before planning an electric conduit bore near 2nd Street or Interstate 35, since the county list does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Jarrell | Public water system | Surface water bought from another system | 1,150 connections, 3,450 people served |
| Oncor Electric Delivery Company, Austin Energy, City of Georgetown, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Williamson County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates give Jarrell a median housing year of 2018; 75 percent of housing units were built in 2000 or later, and 2 percent before 1960. That mix may mean newer service connections as well as older lines needing replacement. Before a bore crosses a marked utility along Walter Way, we expose each marked line by hydrovac potholing. Locate paint shows position, not depth.

What is near Jarrell, including Sonterra?
Jarrell is an incorporated city entirely in Williamson County, at an elevation of 892 feet and covering 3.66 square miles. We use Jarrell’s ZIP codes 76537, 78633 and 78626 to identify work areas near Georgetown. Sonterra is 1.1 miles east; Serenada is 8.2 miles southwest; Weir is 9.3 miles south; Florence is 10.7 miles west; and Salado is 10.8 miles northeast. Georgetown, the county seat and nearest larger city, is 11.0 miles southwest. Jarrell is 361 road miles and a 6.9 hour drive from the Yukon yard, a distance that affects equipment mobilization.
Places near Jarrell
- Directional boring in Sonterra: 1.1 miles east
- Directional boring in Serenada: 8.2 miles southwest
- Directional boring in Weir: 9.3 miles south
- Directional boring in Florence: 10.7 miles west
- Directional boring in Salado: 10.8 miles northeast
- Directional boring in Georgetown: 11 miles southwest
What would we bore near C Bud Stockton Loop in Jarrell?
- Highway crossing: A bore beneath Interstate 35 keeps the line below the highway pavement, with cover and the utility owner’s TxDOT permit considered in the plan.
- Water service: A connection near the City of Jarrell water system needs a route and size matched to the service line and existing marked utilities.
- Fiber route: A fiber conduit along C Bud Stockton Loop can be placed beneath the street, with hydrovac exposure of marked lines before drilling near them.
- Creek crossing: A Donahoe Creek route needs a planned bore below the channel and a jurisdiction check during crossing design.
- Neighborhood service: A bore near Sonterra can serve a new connection or replacement line, with the route and footage used to plan pits and equipment.
- Local street crossing: A line beneath 2nd Street can avoid an open cut across the pavement while marked utilities are exposed along the bore path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a bore near 1st Street in Jarrell?
For a Jarrell bore near 1st Street, send the address or map pin, what is going in the ground, pipe or conduit size, and footage; a sketch or plans help show the route. Include any known crossings of Interstate 35, Donahoe Creek or marked utilities. That route detail helps us see where pits, locates and access may affect the work.
The 361 road miles from Yukon affect mobilization for Jarrell, then the route and ground shape the work. Castephen silty clay can cling to the reamer, and Austin Chalk may slow drilling where the mapped bedrock is shallow. Interstate 35 pavement, utility crossings and creek or drainage routes can add planning and equipment needs. Pit excavation, sand backfill, concrete, emergency timing and the line size also affect the scope.
Questions people ask about boring in Jarrell
Does Trinity Boring Solutions take directional boring work in Williamson County near Jarrell, and how is it staffed?
Yes, we take directional boring work in Williamson County, including routes in Jarrell near Interstate 35 or Donahoe Creek. Our crews handle the drilling, and partner contractor crews work from satellite yards Trinity has vetted. Customers work with Trinity from the first call through the bore log, whichever crew is at the site.
Who approves a Jarrell bore under Interstate 35, and which TxDOT office reviews it?
TxDOT reviews a utility permit for an Interstate 35 bore in the TxDOT Austin District. The utility that owns the line submits through RULIS, while we prepare the bore plan and profile for the filing. The permit sets the route details, including cover; the listed crossing cover is 60 inches for water and pressurized sewer lines.
Can a line be bored under Donahoe Creek in Jarrell?
A line can be planned beneath Donahoe Creek, which has 0.21 channel miles inside Jarrell. The bore route needs to stay below the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. We also identify marked utilities near the entry and exit pits before drilling.
Who runs Jarrell’s public water system in Williamson County, and where is its source?
The City of Jarrell owns the public water system, and its source is purchased surface water. Public records list 1,150 service connections serving 3,450 people. For a bore near the system, the route and the existing marked lines need to be identified before setting the entry and exit pits.
Which electric companies report service in Williamson County near Jarrell, and who confirms conduit specs?
Oncor Electric Delivery Company, Austin Energy, City of Georgetown, Bartlett Electric Cooperative, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative report service in Williamson County. That list does not identify the provider at every Jarrell address. Confirm the specific line owner and conduit requirements before planning a bore near Walter Way.
Does the city or county manage Jarrell streets such as Walter Way, and must a bore cut them?
Jarrell is incorporated, so its city streets, including Walter Way, belong to the city. A directional bore can pass below the street without an open cut across the pavement. The route still needs marked utilities exposed before drilling near them, and any state highway right of way has a separate TxDOT permit process.
How far is Jarrell from Georgetown and Trinity’s Yukon main office, and does distance affect a bore?
Jarrell is 11.0 miles northeast of Georgetown and 361 road miles from Trinity’s Yukon, Oklahoma main office. That distance can affect equipment mobilization for a bore near C Bud Stockton Loop. The ground, route length, utility crossings and any Interstate 35 work also shape the job plan.
How much notice does Texas811 need for a Jarrell bore along 2nd Street, and what if marks move?
For a bore along 2nd Street, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the notice, submit a new request. Along Interstate 35, we refresh worn or moved marks through Texas811 before continuing work.
What affects the cost of directional boring in Jarrell near Interstate 35?
The route and job details determine the cost, not a single standard figure. Mobilization from Yukon matters at 361 road miles, while Castephen clay, mapped Austin Chalk, Interstate 35 pavement and the number of utility crossings can change the work. Pipe size, bore length, pits, excavator time, backfill and emergency scheduling also matter.
Where the Jarrell facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Jarrell
- U.S. Census Bureau, TIGER/Line 2024: Jarrell boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Jarrell
- U.S. Census Bureau, American Community Survey 2019 to 2023: Jarrell housing units and year built
- Macrostrat geologic map compilation: map units under Jarrell
- U.S. EPA Safe Drinking Water Information System: public water systems serving Jarrell
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Williamson County
- U.S. Geological Survey, Elevation Point Query Service: Jarrell elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Jarrell
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Jarrell
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Jarrell, Texas
Type the address of your job in Jarrell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Jarrell
Same county: Round Rock · Leander · Cedar Park · Austin · Hutto · Brushy Creek · Taylor · Liberty Hill · Granger · Bartlett · Thrall · Coupland. All counties: Texas county list.
