trinityboringsolutions.com

Garza-Salinas II Texas Directional Boring: Matamoros Silty Clay, US 83 and Border Pacific Railroad

Quick Answer: Water service on Tampico Street needs address level confirmation; AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative report electric service in Starr County, so verify line owners before drilling. We take directional boring, also called horizontal directional drilling (HDD), for routes beneath US 83 and Tampico Street in Garza-Salinas II. The 742 road miles from Yukon affect mobilization for work near the Border Pacific Railroad. Matamoros soil covers 58 percent of the mapped area, and sticky clay can grip pipe, making staged reaming and a prompt pull important.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Garza-Salinas II bores at a glance

  • Unincorporated community in Starr County, Texas. Population 651 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 742 miles, about 14.4 hours of driving.
  • Ground: Matamoros soil is mapped on 58 percent of the area, with stratified very fine sandy loam to silty clay to clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 83. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: Border Pacific Railroad, with 1 mapped street and rail crossings.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring under US 83 in Garza-Salinas II?

Trinity Boring Solutions takes directional boring work in Garza-Salinas II, Starr County, including routes along US 83 and Tampico Street. The Census Bureau counted 651 people here in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber lines, with the route and line type guiding how we plan a bore beneath the community’s roads.

Our main office is in Yukon, Oklahoma, and Garza-Salinas II work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We began directional boring in 1982, and four decades of work help us plan for the sticky Matamoros clay mapped near US 83, where fluid control and staged reaming matter.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does a bore meet in Garza-Salinas II Matamoros soil?

Garza-Salinas II is mapped mostly as Matamoros soil, which covers 58 percent of the community in the USDA soil survey. At about 40 inches below the surface, that mapped area has stratified very fine sandy loam to silty clay to clay; the soil classification there is CH. The survey also maps Lagloria silt loam across 25 percent and Jimenez-Quemado association across 16 percent. It maps an average clay content of 30 percent at that depth and no sandy area, so a bore plan should account for sticky cuttings rather than loose sand.

USDA soil survey, inside the Garza-Salinas II mapped community boundaryWhat is mapped
Soil series mappedMatamoros 58 percent, Lagloria 25 percent and Jimenez 16 percent
Texture at the surfacesilty clay 58 percent, silt loam 25 percent and very gravelly loam 16 percent
Texture about 40 inches downstratified very fine sandy loam to silty clay to clay 58 percent, silt loam 25 percent and variable 16 percent
Engineering class about 40 inches downfat clay (CH) 58 percent and silty clay (CL ML) 25 percent
Average clay content about 40 inches down30 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils58 percent of the area
High corrosion risk for uncoated steel84 percent of the area

The USDA soil survey maps no seasonal water table within 60 inches, but flood prone soils cover 58 percent of Garza-Salinas II, so a route near drainage needs careful depth planning. High steel corrosion risk is mapped across 84 percent, a concern for steel casing and tracer wire that the line owner should consider when selecting materials. In Garza-Salinas II, we treat the unmapped top five feet as uncertain when planning a bore depth. The geologic map shows Cenozoic terrace deposits of gravel, sand, silt and clay, so deeper material can vary even without shallow bedrock mapped.

How do we bore through Matamoros soil in Garza-Salinas II?

We match the drilling approach to the mapped Matamoros clay and the route in Garza-Salinas II. At US 83 and local streets, keeping fluid pressure controlled helps protect pavement while we steer.

  1. In Matamoros clay, we use a thinner drilling fluid with polymer and open the hole in stages to manage sticky cuttings and reduce pipe grip.
  2. For the CH soil mapped at about 40 inches, we watch fluid returns and pressure near US 83 so drilling does not lift pavement.
  3. We hydrovac pothole each marked utility along streets such as Salinas Avenue before drilling near it, because surface marks do not show burial depth.
  4. A walkover locator tracks the drill head near the Border Pacific Railroad, while we record depth and pitch as the bore advances.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Which roads, tracks or creeks can a Garza-Salinas II bore cross near Tampico Street?

US 83 runs 0.2 mapped roadway miles inside the Garza-Salinas II community boundary, and no other highway is mapped within 1.5 miles outside it. A crossing beneath existing US 83 pavement is installed by boring or tunneling, not open trenching. Tampico Street is the longest named street at 0.51 miles inside the community; Acapulco Street measures 0.32 miles and Salinas Avenue 0.3 miles. Barcelona Street adds another local route to consider when setting a bore path and locating existing lines.

CrossingTypeMapped extentWho has a say
US 83US highway0.2 roadway miles insideState highway office
Border Pacific RailroadRailroad0.25 track miles insideThe railroad
Olmitos CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Scs 7Lake or pond81 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Border Pacific Railroad has 0.25 track miles inside Garza-Salinas II, and one mapped street and rail crossing makes track clearance a practical route issue. A crossing needs an agreement from the railroad that owns the track, with its terms governing the work. No stream is mapped inside the community, and no street crossing of a named stream is mapped. Olmitos Creek is 0.5 miles from the boundary; Scs 7, an 81 acre lake, is also within one mile, so a water crossing would need jurisdiction checked during planning.

Do I need a permit to bore beneath US 83 in Starr County in Garza-Salinas II?

A bore in Garza-Salinas II beneath US 83 right of way needs a TxDOT utility permit, reviewed by the TxDOT Pharr District. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under that owner’s permit. Electric and communication lines crossing US 83 need at least 60 inches of cover below the lowest point of the crossed grade; water lines need 60 inches and pressurized sewer lines need 60 inches. Garza-Salinas II has no city government, so county roads and state highways are handled by their respective authorities. Border Pacific Railroad crossings require an agreement with the railroad owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines already in the ground in Starr County near Garza-Salinas II?

The water provider for a specific Garza-Salinas II address must be confirmed with the county or local water district before planning a bore; available EPA records do not match a provider to this place. AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative report electric service in Starr County, but that does not establish which one serves an address near US 83. Before an electric conduit bore in Garza-Salinas II, we confirm the line owner as part of planning.

Line ownerWhat it isSourceSize
AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric CooperativeElectric utilities reporting service in Starr CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median year built for Garza-Salinas II housing at 1992; 82 percent of homes date from 1960 to 1999 and 18 percent from 2000 or later. That mix can mean a route serves replacement work or a newer connection near Salinas Avenue. Before the drill approaches marked lines, we hydrovac pothole them to establish depth, since locate paint only shows position.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Where is Garza-Salinas II in relation to Rio Grande City?

Garza-Salinas II is an unincorporated census designated place in Starr County, Texas, at an elevation of 156 feet and covering 0.08 square miles. Its ZIP code is 78582. B and E and Santa Cruz are each 0.5 miles away, northeast and west respectively; El Chaparral is 0.5 miles southwest. Rio Grande City, the county seat and nearest larger city, is 4.3 miles northwest. Trinity’s Yukon, Oklahoma yard is 742 road miles away, a 14.4 hour drive, which affects how mobilization is planned for a bore near Barcelona Street.

Places near Garza-Salinas II

Which jobs call for a bore along Salinas Avenue in Garza-Salinas II?

  • Highway crossing: A US 83 route uses a bore beneath pavement, with cover and the TxDOT permit plan set for the utility line.
  • Water service: A new or replacement service near Tampico Street needs the address specific water provider confirmed before we lay out the bore.
  • Fiber conduit: A route along Salinas Avenue can keep a fiber installation beneath the road surface while marked utilities are exposed first.
  • Rail crossing: A route beneath Border Pacific Railroad track requires the railroad owner’s agreement and its crossing conditions.
  • Creek approach: A bore near Olmitos Creek needs depth planning and a check for federal jurisdiction if the route crosses the channel.
  • Street service: A water, sewer or electric conduit bore near Barcelona Street can avoid cutting the paved surface when the route allows.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for work near Barcelona Street in Garza-Salinas II?

For a Garza-Salinas II quote, give us the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us read the route near Barcelona Street. Those details show where a bore may meet existing lines, pavement or the Border Pacific Railroad and let us scope the work before pricing it.

The mapped Matamoros clay is the first ground factor because sticky cuttings and pipe grip can call for staged reaming and careful timing. Price also reflects bore length, pipe or conduit size, utilities crossed and exposed, and any pavement or concrete along US 83. A Border Pacific Railroad crossing adds coordination, while pits, excavator time and sand backfill affect the work area. Mobilization matters too: the Yukon yard is 742 road miles from Garza-Salinas II.

Questions people ask about boring in Garza-Salinas II

Does Trinity Boring Solutions take jobs in Starr County at Garza-Salinas II, and how are crews assigned?

Yes, we take directional boring work in Garza-Salinas II and staff it with our own crews or from vetted partner contractor yards. Our Yukon main office coordinates the work, so the customer deals with Trinity through the bore log regardless of which crew is on site. A US 83 route is planned for its specific crossing and utility conditions.

What is the Matamoros soil like for a bore in Garza-Salinas II?

The USDA soil survey maps Matamoros soil across 58 percent of Garza-Salinas II, with stratified very fine sandy loam to silty clay to clay at about 40 inches. That mapped CH material can get sticky and grip the pipe. We plan staged reaming and fluid for that ground rather than treating the survey as a test boring.

Will a bore in Garza-Salinas II encounter unmapped bedrock in the top five feet?

Bedrock is not mapped in the top five feet of Garza-Salinas II, but that does not rule out rock deeper down. The geologic map shows Cenozoic terrace deposits made up of gravel, sand, silt and clay. We use the route and field conditions to guide the bore plan near streets such as Tampico Street.

Who approves a bore beneath US 83 in Garza-Salinas II?

TxDOT reviews a utility permit for work in US 83 right of way through its Pharr District. The utility owner submits the application in TxDOT’s online RULIS system, and we prepare the bore plan and profile for that filing. The required cover depends on the line type and crossing, so the permit plan must show the proposed depth.

What does a Garza-Salinas II bore under Border Pacific Railroad require?

A crossing beneath the Border Pacific Railroad track needs an agreement with the railroad that owns it. The agreement sets crossing conditions such as casing, depth and flagging. Since 0.25 track miles are mapped inside Garza-Salinas II, we identify the track relationship early when reviewing a route near a street and rail crossing.

Can a line be bored under Olmitos Creek near Garza-Salinas II?

A line may be bored beneath Olmitos Creek if the route and crossing conditions support it. The creek is 0.5 miles from the Garza-Salinas II boundary, and a creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. We would plan the bore depth to pass below the channel.

How far is Garza-Salinas II from the Yukon office near Rio Grande City, and does that affect a job?

We account for Garza-Salinas II’s 742 road miles and 14.4 hour drive from our Yukon, Oklahoma main office when scheduling work. Rio Grande City is 4.3 miles northwest and is the county seat. The distance from Yukon is part of mobilization planning, alongside the route, equipment and ground conditions around US 83.

How much notice does Texas811 need for a bore along Tampico Street in Garza-Salinas II?

For a bore path along Tampico Street, the excavator makes the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For Garza-Salinas II scheduling, we allow at least two working days, as Texas811 describes. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing before work resumes.

What affects the cost of a directional bore beneath US 83 in Garza-Salinas II?

The route details set the price, with Matamoros clay a major factor because it can require staged reaming and careful fluid control. Length, pipe or conduit size, marked utilities to expose, pavement, pits and excavator time also affect the scope. A US 83 crossing or Border Pacific Railroad coordination can add work, as can mobilization from Yukon.

Where the Garza-Salinas II facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Garza-Salinas II

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Garza-Salinas II, Texas

Type the address of your job in Garza-Salinas II. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Garza-Salinas II

Same county: Roma · Las Lomas · Escobares · La Grulla · Mikes · East Alto Bonito · West Alto Bonito · Mesquite · Valle Vista · Garceno · Camargito · Alto Bonito Heights. All counties: Texas county list.