trinityboringsolutions.com

Taft Texas Directional Boring: Victoria Clay, US 181 and Union Pacific

Quick Answer: Railroad Avenue, Field Avenue and Gregory Street are Taft’s longest named streets, and 29.92 public road centerline miles include routes crossed by US 181 and Union Pacific track. We use directional boring, also called horizontal directional drilling (HDD), to place lines beneath Railroad Avenue and the track without cutting across them. Taft is 577 road miles from our Yukon, Oklahoma main office, and US 181 is one local crossing to plan around. Victoria clay makes the ground sticky, so crews manage drilling fluid and ream in stages.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Taft bores at a glance

  • Incorporated city in San Patricio County, Texas. Population 2,929 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 577 miles, about 11.2 hours of driving.
  • Ground: Victoria soil is mapped on 47 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 181 and FM 631. State permit office: TxDOT Corpus Christi District.
  • Railroad track inside the boundary: Union Pacific, with 7 mapped street and rail crossings.
  • Named streams inside the boundary: Taft Drainage Ditch.
  • Public water: City of Taft, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Railroad Avenue in Taft?

Trinity Boring Solutions takes directional boring work in Taft, San Patricio County, including routes near Railroad Avenue, Field Avenue and Gregory Street. Taft has 29.92 public road centerline miles, with US 181 and Union Pacific track among the crossings to plan around. We use Taft’s Census Bureau Vintage 2024 population estimate of 2,929 when planning underground work. We install water, sewer, gas, electric conduit and fiber lines beneath local streets or along routes serving Taft addresses.

Our main office is in Yukon, Oklahoma, and Taft work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Taft work, our range runs from a 3/4 inch service line to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. We are a family business started in 1965 and have done directional boring since 1982, including work suited to the crossings around Railroad Avenue.

Aerial view of a Trinity Boring Solutions directional drill set up for a gas line bore at a commercial site
Our directional drill set up for a gas line bore at a commercial site, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does directional boring encounter in Taft’s Victoria soil?

Victoria soil is the largest mapped soil series in Taft, so clay is a key ground condition for local bores. The USDA soil survey maps Victoria across 47 percent of the city; Victoria clay with 0 to 1 percent slopes covers 42 percent. At about 40 inches below the surface, the mapped texture is clay across 89 percent and sandy clay loam across 11 percent. We treat mapped soil patterns in Taft as screening information, not a substitute for test borings before planning a bore. Clay can hold an open hole but stick to the reamer and grip pipe, so crews plan the fluid and reaming sequence around it.

USDA soil survey, inside the Taft city limitsWhat is mapped
Soil series mappedVictoria 47 percent, Raymondville 32 percent, Calallen 11 percent and Banquete 10 percent
Texture at the surfaceclay 57 percent, clay loam 32 percent and sandy clay loam 11 percent
Texture about 40 inches downclay 89 percent and sandy clay loam 11 percent
Engineering class about 40 inches downfat clay (CH) 57 percent and lean clay (CL) 43 percent
Average clay content about 40 inches down50 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel79 percent of the area

The USDA soil survey does not map bedrock within 60 inches, and seasonal water table and flood prone soils are not mapped within that depth. That does not establish conditions at greater depths. High steel corrosion risk is mapped across 79 percent of Taft, so the line owner should consider casing and tracer wire materials. The geologic map identifies the Pleistocene Beaumont Formation, with areas predominantly sand and fine alluvium, including clayey fill in abandoned channels. Ground conditions can change along a route, so the bore plan needs to account for the mapped clay and sand.

How do crews bore through Taft clay?

For Taft’s mapped clay, we adjust fluid and reaming to manage sticky cuttings and avoid gripping the pipe. Victoria clay and the mapped sand in the Beaumont Formation call for a plan matched to the route.

  1. Victoria clay can stick to the reamer, so we use a thinner fluid with polymer and open the hole in stages before pulling pipe on the same day.
  2. Where heavy clay lies along a Taft route, crews watch fluid returns and pressure so drilling does not lift nearby pavement.
  3. The Beaumont Formation includes sand and fine alluvium, so staged reaming and drilling fluid help keep the hole open behind the bit.
  4. Before approaching marked lines near the City of Taft water system, we pothole them, then track the drill head from the surface and log depth and pitch.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Which Taft roads, tracks or creeks near Railroad Avenue need a bore?

Taft bores may cross US 181 or FM 631, both of which run inside the city limits. Railroad Avenue is the longest named street at 1.32 miles, followed by Field Avenue at 1.12 miles and Gregory Street at 1.08 miles. McIntyre Avenue and Victoria Avenue each span 0.95 miles. The city has 29.92 public road centerline miles in all, so a route can involve local streets as well as a state or US highway. Existing highway pavement is crossed by boring or tunneling rather than open trenching.

CrossingTypeMapped extentWho has a say
US 181US highway3.7 roadway miles insideState highway office
FM 631State highway2.6 roadway miles insideState highway office
Union PacificRailroad1.24 track miles insideThe railroad
Taft Drainage DitchStream1 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 1.24 track miles inside Taft, and public records map 7 street and rail crossings in the city. A track route needs coordination with the railroad that owns it. Taft Drainage Ditch runs for 1.0 channel mile inside the limits, with 2 mapped street crossings of named streams. For Taft routes, we account for the mapped absence of lakes or ponds within one mile when reviewing underground crossings. A creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who approves a Taft bore under US 181?

The line owner, not the driller, applies for a TxDOT utility permit when a Taft bore uses the right of way on US 181 or FM 631. The TxDOT Corpus Christi District reviews the application in RULIS, and we prepare the bore plan and profile for the utility owner’s filing. Cover depends on line type: electric and communication crossings need 60 inches below the lowest crossed grade, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The district may set a different depth. A Union Pacific crossing also requires an agreement with the railroad, and Taft Drainage Ditch is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Taft and San Patricio County?

The City of Taft public water system uses purchased surface water and reports 1,910 service connections serving 4,627 people. AEP Texas Central and San Patricio Electric Cooperative report electric service in San Patricio County, but the line owner must be confirmed for the address before planning a conduit bore. Near a Taft water line or electric route, we use hydrovac potholing to expose marked utilities before the drill approaches; paint shows position, not depth.

Line ownerWhat it isSourceSize
City of TaftPublic water systemSurface water bought from another system1,910 connections, 4,627 people served
AEP Texas Central and San Patricio Electric CooperativeElectric utilities reporting service in San Patricio CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Taft’s median housing year at 1962; 45 percent of homes were built before 1960, and 13 percent in 2000 or later. Older streets such as Gregory Street may involve replacement routes among existing buried lines, while newer service work needs the same checks. We pothole marked lines on the bore path before drilling near them, especially where a route approaches the public water system.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Taft and nearby Loma Linda?

We take directional boring work in Taft and nearby places in San Patricio County. Taft is 50 feet above sea level and covers 1.67 square miles; its ZIP code is 78390. Taft Southwest is 1.0 mile southwest, Loma Linda is 6.8 miles west, and Rancho Chico is 7.0 miles northwest. La Paloma Addition is 7.1 miles west, while Portland, the nearest larger city, is 7.3 miles southeast. Sinton, the county seat, is 7.7 miles northwest. Taft is 577 road miles and a 11.2 hour drive from our Yukon, Oklahoma yard.

Places near Taft

What kinds of bores come up near Taft Drainage Ditch?

  • Highway crossing: A bore beneath US 181 can keep the existing pavement uncut, with the line owner applying for the TxDOT right of way permit.
  • Water service: A route near the City of Taft water system can connect a service while crews expose marked lines along the bore path.
  • Fiber route: A conduit bore along Gregory Street can pass beneath the street rather than opening a trench across its surface.
  • Drainage crossing: A bore near Taft Drainage Ditch needs route planning for the channel and a check for federal jurisdiction.
  • Rail crossing: A route beneath Union Pacific track requires an agreement with the railroad that owns the track.
  • Electric conduit: A conduit route near Field Avenue starts with confirming the line owner and exposing marked utilities before drilling close to them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Taft bore near Union Pacific?

A map pin matters for a Taft quote because the route may approach Railroad Avenue, US 181 or Union Pacific track, each with different crossing details. Send the address or pin, what is going underground, the pipe or conduit size and the footage. A sketch or plans help us see the route and identify crossings such as Taft Drainage Ditch.

A short route in Victoria clay with no marked crossings is simpler to plan than a bore under US 181 or Union Pacific track. Price reflects length, pipe or conduit size, soil, utilities to expose, pavement, drainage crossings, pits and excavator time. The 577 road miles from Yukon can affect mobilization, and high profile or emergency work can add planning demands. A route beside Taft Drainage Ditch or through sticky clay may call for a different setup than a clear street service.

Questions people ask about boring in Taft

Does Trinity take directional boring jobs in Taft and San Patricio County?

Yes, we take directional boring work in Taft and across Texas. The work is staffed by our own crews or crews at satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route is near Railroad Avenue or elsewhere in San Patricio County.

Who is responsible for Gregory Street in Taft, and does a bore require cutting it?

Gregory Street is a city street, so it belongs to the City of Taft. A directional bore can pass beneath the street without cutting its pavement. The route still needs utility locates and potholing of marked lines before the drill approaches, particularly where a service connects near existing water or electric infrastructure.

Do older buried lines near Field Avenue affect replacement bores in Taft?

They can affect the route and potholing plan. The American Community Survey 2019 to 2023 five year estimates put Taft’s median housing year at 1962, with 45 percent of homes built before 1960. A replacement bore near Field Avenue should account for marked utilities and expose them before drilling close by.

Can Taft’s Victoria soil corrode steel, and what pipe should a bore use?

The USDA soil survey maps high steel corrosion risk across 79 percent of Taft, including areas with Victoria soil. The line owner chooses materials and any coating for steel casing or tracer wire. HDPE does not have the same steel corrosion concern, but the right pipe depends on the line and project requirements.

What ground will a directional bore pass through in Taft’s Victoria soil?

The USDA soil survey maps Victoria as 47 percent of Taft’s soil series, and at about 40 inches it maps clay across 89 percent of the city. Clay can hold an open hole but may cling to the reamer or grip pipe. Those mapped patterns help guide planning, but they are not test borings.

Will we hit rock on a directional bore in Taft?

Bedrock is not mapped within the top five feet of Taft, but that does not rule out deeper rock. The geologic map shows the Pleistocene Beaumont Formation, described in areas predominantly as sand and fine alluvium, with clayey fill in abandoned channels. Actual conditions along a bore route can vary.

Can I reach Trinity after hours about an urgent bore near Gregory Street in Taft?

Yes, a person answers our phone 24 hours a day at (405) 409-7423. Tell us where the issue is, such as a route near Gregory Street, and what line or crossing is involved. We also provide 24 hour emergency response for urgent work in Taft.

How far ahead should I call Texas811 for a Taft bore along Railroad Avenue?

The locate request must reach Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If work along Railroad Avenue slips more than 14 days past the original notice, file a new request. Before work continues in Taft, we refresh worn or moved marks through Texas811 to keep the marked route current.

What affects the price of directional boring under US 181 in Taft?

The route, length, pipe or conduit size, soil, pavement, utility crossings and pit needs all affect the price. A US 181 crossing involves highway right of way planning, while sticky Victoria clay can change the drilling approach. The 577 road miles from Yukon can also affect mobilization for Taft work.

Where the Taft facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Taft

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Taft, Texas

Type the address of your job in Taft. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Taft

Same county: Ingleside · Aransas Pass · Sinton · Mathis · Odem · Gregory · Ingleside on the Bay · St. Paul · Lakeshore Gardens-Hidden Acres · Lake City · Morgan Farm · San Patricio. All counties: Texas county list.