Weatherford Texas Directional Boring: Duffau Soil, Town Creek and Interstate 20
Quick Answer: At Town Creek and Weatherford streets, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for lines routed below surface features. Weatherford is 238 road miles from our Yukon, Oklahoma main office, and Interstate 20 pavement affects route planning. Duffau soil is mapped across 18 percent of the city, while sandy clay loam at about 40 inches can grip a reamer. Town Creek routes need creek conditions considered before setting a bore path.
Weatherford bores at a glance
- County seat of Parker County, Texas. Population 39,397 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 238 miles, about 4.7 hours of driving.
- Ground: Duffau soil is mapped on 18 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 42 percent of the area.
- Highways inside the boundary: Interstate 20, US 180, Texas State Highway 171, FM 51 and Texas State Highway 51. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: Union Pacific, with 11 mapped street and rail crossings.
- Named streams inside the boundary: Town Creek, Willow Creek, Clear Fork Trinity River and Underwood Branch.
- Public water: City of Weatherford, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring in Weatherford, Parker County?
Weatherford’s mapped clay loam and sandy clay loam make Trinity Boring Solutions a directional boring option for water, sewer, gas, electric conduit and fiber routes across Parker County. The Census Bureau Vintage 2024 estimate lists 39,397 residents; those lines can run beneath Lake Drive or between service points where an open cut would disrupt access.
Our main office is in Yukon, Oklahoma, and Weatherford work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have drilled directionally since 1982. With no utility strike in over 25 years, we bring that record to routes near the City of Weatherford water system and electric lines reported in Parker County.

What ground does Weatherford’s Duffau soil create for a bore?
Weatherford’s USDA soil survey maps Duffau soil across 18 percent of the city, with Windthorst at 15 percent and Brackett at 12 percent. We use Weatherford’s mapped patterns to plan bore paths, treating them as guidance rather than test borings. At about 40 inches below the surface, sandy clay loam covers 28 percent of the mapped area, and the average clay content there is 28 percent. Clay can hold the hole open but stick to a reamer and grip the pipe. Fine sandy loam is the leading surface texture at 28 percent, so conditions can change along a bore.
| USDA soil survey, inside the Weatherford city limits | What is mapped |
|---|---|
| Soil series mapped | Duffau 18 percent, Windthorst 15 percent, Brackett 12 percent, Venus 9 percent and Wise 6 percent |
| Texture at the surface | fine sandy loam 28 percent, clay loam 24 percent and loamy fine sand 11 percent |
| Texture about 40 inches down | sandy clay loam 28 percent, bedrock 21 percent and sandy clay 15 percent |
| Engineering class about 40 inches down | lean clay (CL) 58 percent, fat clay (CH) 7 percent and silty clayey sand (SC SM) 4 percent |
| Average clay content about 40 inches down | 28 percent |
| Bedrock mapped within 60 inches | 42 percent of the area (10 percent hard rock, 31 percent weathered rock) |
| Seasonal water table within 60 inches | 8 percent of the area |
| Flood prone soils | 8 percent of the area |
| High corrosion risk for uncoated steel | 15 percent of the area |
The USDA soil survey maps bedrock within 40 inches across 30 percent of Weatherford and within 60 inches across 42 percent; hard bedrock is mapped in 10 percent of the area within 60 inches. The Paluxy Sand unit is Early Cretaceous and includes sandstone, mudstone and limestone, so the bore may move from soil into rock. Seasonal water tables and flood prone soils each affect 8 percent of the mapped area. High steel corrosion risk covers 15 percent, a reason to discuss casing and tracer wire materials with the line owner.
How do we drill Weatherford’s sandy clay loam along the bore path?
Weatherford’s mapped sandy clay loam and clay call for controlled fluid and staged reaming, while the Paluxy Sand map means we check the profile rather than assume uniform ground along a route.
- Duffau soil and clay loam can cling to the reamer, so we use thinner fluid, add polymer and ream in stages before pulling pipe.
- Where Weatherford’s sandy clay loam meets mapped Paluxy Sand, we check depth and pitch as ground changes and prepare for slower progress in weathered rock.
- Near Town Creek, we plan the bore profile to pass below the channel and consider mapped flood prone soils and seasonal water conditions.
- On a route beside Lake Drive, a walkover locator follows the drill head while we log its depth and pitch through each rod.

What could a new Weatherford line cross near Town Creek?
Weatherford includes Interstate 20, US 180, Texas State Highway 171, FM 51 and Texas State Highway 51, so a route may need to pass below highway pavement or through a right of way. Lake Drive runs 8.54 miles within the city, Main Street 7.03 miles and Bankhead Drive 3.55 miles. Those long street corridors can shape service routes, but the actual alignment determines which pavement, driveways or other features a bore must avoid.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 19 roadway miles inside | State highway office |
| US 180 | US highway | 13.8 roadway miles inside | State highway office |
| Texas State Highway 171 | State highway | 3.8 roadway miles inside | State highway office |
| FM 51 | State highway | 3.6 roadway miles inside | State highway office |
| Texas State Highway 51 | State highway | 3.5 roadway miles inside | State highway office |
| FM 730 | State highway | 2.2 roadway miles inside | State highway office |
| FM 1884 | State highway | 2.1 roadway miles inside | State highway office |
| FM 2552 | State highway | 1.8 roadway miles inside | State highway office |
| Spur 312 | State highway | 1.5 roadway miles inside | State highway office |
| FM 920 | State highway | 1.4 roadway miles inside | State highway office |
| FM 2421 | State highway | 0.8 roadway miles inside | State highway office |
| Union Pacific | Railroad | 7.1 track miles inside | The railroad |
| Town Creek | Stream | 8 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Willow Creek | Stream | 4.81 channel miles inside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 7.1 track miles in Weatherford, with 11 mapped street and rail crossings; a proposed crossing needs coordination with the railroad. Town Creek has 8.0 channel miles, and mapped street crossings of named streams total 44. Willow Creek and the Clear Fork Trinity River also run through the city. Lake Weatherford and Sunshine Lake are mapped within the limits, so a route near a creek or lake needs water crossing conditions considered during planning.
Who approves a Weatherford bore under Interstate 20?
The TxDOT Fort Worth District reviews utility permits for work in the Interstate 20 right of way and other state controlled roads in Weatherford. Electric and communication crossings need 60 inches of cover below the lowest crossed grade; water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The line owner files through RULIS, while we prepare the bore plan and profile for its application. TxDOT requires boring or tunneling below existing highway pavement, with casing at crossings. A Union Pacific crossing needs an agreement with the railroad, and a Town Creek crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Weatherford near the City of Weatherford system?
The City of Weatherford public water system uses surface water and reports 16,311 service connections serving 37,002 people. Electric utilities reporting service in Parker County are Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative. Those reports do not identify the provider at every address, so the line owner must be confirmed before planning conduit near the City of Weatherford system or any electric route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Weatherford | Public water system | Surface water | 16,311 connections, 37,002 people served |
| Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative | Electric utilities reporting service in Parker County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 estimates put Weatherford’s median housing year at 1997; 15 percent of homes were built before 1960, 38 percent from 1960 to 1999 and 47 percent in 2000 or later. Older Main Street service routes may involve replacement lines, while newer areas may need service extensions. On Weatherford bore paths, we hydrovac pothole each marked utility before drilling nearby. For a proposed line under Main Street, that means exposing marked lines first because surface paint does not show their depth.

Where does Weatherford sit in relation to Fort Worth?
Weatherford is the Parker County seat, at an elevation of 1,000 feet, and covers 27.79 square miles. Its ZIP codes are 76086, 76087, 76085 and 76088. Hudson Oaks is 4.2 miles east, Annetta is 7.0 miles southeast, Willow Park is 7.1 miles east, Annetta North is 8.0 miles east and Peaster is 9.0 miles northwest. Fort Worth is 24.7 miles east. The Yukon yard is 238 road miles away, a 4.7 hour drive that affects mobilization for Weatherford work.
Places near Weatherford
- Directional boring in Hudson Oaks: 4.2 miles east
- Directional boring in Annetta: 7 miles southeast
- Directional boring in Willow Park: 7.1 miles east
- Directional boring in Annetta North: 8 miles east
- Directional boring in Peaster: 9 miles northwest
- Directional boring in Fort Worth: 24.7 miles east
What boring work comes up along Weatherford’s Lake Drive?
- Highway crossing: A bore under Interstate 20 can keep a new water or communication line beneath pavement instead of cutting across the roadway.
- Water service: A connection near the City of Weatherford system can be routed below Lake Drive to limit surface disruption.
- Fiber route: A fiber conduit along Main Street can pass beneath driveways and pavement without an open cut across each access point.
- Creek crossing: A line near Town Creek needs a planned profile below the channel and review of crossing conditions.
- Rail crossing: A proposed utility beneath Union Pacific track needs an agreement with the railroad before the crossing is planned.
- Electric conduit: Near Bankhead Drive, the route starts with confirming the electric line owner and locating marked utilities.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a Weatherford bore quote near Union Pacific tracks?
For a Weatherford quote, start with an address or map pin, such as a location on Lake Drive, then tell us what will go underground. Include pipe or conduit size and footage; plans or a sketch help show how the route relates to Interstate 20, Town Creek or Union Pacific tracks.
Weatherford ground and crossings make soil and rock the first price consideration: Duffau soil and shallow mapped bedrock can change the drilling method and time. Next, the number of utilities to expose and crossings such as Town Creek or Union Pacific track affect the plan. Interstate 20 pavement, pipe size and bore length also matter, along with pits, excavator time and sand backfill. High profile or emergency work changes the scope, and the 238 road miles from Yukon affect mobilization.
Questions people ask about boring in Weatherford
Does Trinity take directional boring work in Weatherford and Parker County, and who staffs it?
Yes. Trinity takes directional boring work in Weatherford, with its own crews and vetted partner contractor crews supporting jobs from outside the city. On Weatherford projects, we coordinate with Trinity from the first call through the bore log, whichever crew is on site. That service model applies to routes near Lake Drive and elsewhere in Parker County.
Who operates Weatherford’s public water system, and what is its water source?
The City of Weatherford owns and runs the public water system, which uses surface water. We consider Weatherford’s public records figures, 16,311 service connections and 37,002 people served, when planning underground utility coordination. For a proposed service bore near Lake Drive, confirm the address and existing line locations before selecting a route.
Which electric companies report service in Weatherford and Parker County, and who confirms conduit specs?
Oncor Electric Delivery Company, Weatherford Municipal Utility System, Tri-County Electric Cooperative and Wise Electric Cooperative report electric service in Parker County. The reports do not identify the provider at each Weatherford address. We confirm the line owner before planning an electric conduit bore and check the conduit requirements with that owner.
Who controls Weatherford streets such as Bankhead Drive, and does a bore require cutting one?
Weatherford is incorporated, so its city streets, including Bankhead Drive, are under the city’s control. Directional boring can place a line below pavement without cutting the street surface. The route and site conditions determine where the entry and exit pits can sit.
How old are Weatherford homes and buried lines near Main Street, and what does that mean for replacement bores?
Weatherford’s median housing year is 1997, according to the American Community Survey 2019 to 2023 estimates. Main Street routes may involve older lines being replaced or new service connections, but housing age does not establish the age of a buried utility. Before drilling near marked utilities in Weatherford, we expose them to keep the bore path clear.
What ground might a Weatherford bore encounter around Duffau soil?
The USDA soil survey maps Duffau soil across 18 percent of Weatherford. At about 40 inches, sandy clay loam covers 28 percent of the mapped area and may grip the reamer or pipe. Bedrock is also mapped at shallow depths in parts of the city, so the bore profile can change along its route.
How far is Weatherford from Trinity’s Yukon office, and does Fort Worth change the job?
Weatherford is 238 road miles and a 4.7 hour drive from Trinity’s Yukon, Oklahoma main office. Fort Worth is 24.7 miles east of Weatherford, but the job location and route determine mobilization. A bore near Interstate 20 may also need highway planning separate from travel distance.
How much notice does Texas811 need for a Weatherford bore near Lake Drive?
For Lake Drive work, request the Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. The ticket gives a 20 day planning window; if the start slips more than 14 days past the original notice, submit a new request. If Weatherford marks wear or move, we contact Texas811 for refreshed marks before continuing bore work.
What affects the cost of a directional bore in Weatherford near Interstate 20?
The price depends on the route and scope. Duffau soil or shallow bedrock can affect drilling time; Interstate 20 pavement, Town Creek or Union Pacific crossings can add planning and exposure work. Pipe size, length, pits, excavator time, backfill and emergency timing also matter. Mobilization from the Yukon office is another job factor.
Where the Weatherford facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Weatherford
- U.S. Census Bureau, TIGER/Line 2024: Weatherford boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Weatherford
- U.S. Census Bureau, American Community Survey 2019 to 2023: Weatherford housing units and year built
- Macrostrat geologic map compilation: map units under Weatherford
- U.S. EPA Safe Drinking Water Information System: public water systems serving Weatherford
- U.S. Department of Transportation, North American Rail Network: track owners in Parker County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Parker County
- U.S. Geological Survey, Elevation Point Query Service: Weatherford elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Weatherford
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Weatherford
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Weatherford, Texas
Type the address of your job in Weatherford. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Weatherford
Same county: Aledo · Briar · Springtown · Reno · Azle · Western Lake · Dennis · Cresson · Horseshoe Bend · Annetta South · Millsap · Sanctuary. All counties: Texas county list.
