trinityboringsolutions.com

Barry Texas Directional Boring: Houston Black Clay, Texas State Highway 22, Briar Creek

Quick Answer: Barry is an incorporated small city in Navarro County, so its city streets belong to the city. We take directional boring, also called horizontal directional drilling (HDD), work in Barry for routes beneath Texas State Highway 22 and local streets. The Yukon, Oklahoma main office is 280 road miles away, with Front Street among the roads a route may cross. Houston Black clay covers most mapped ground, so sticky cuttings and swelling clay shape reaming and fluid choices.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Barry bores at a glance

  • Incorporated city in Navarro County, Texas. Population 246 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 280 miles, about 5.7 hours of driving.
  • Ground: Houston Black soil is mapped on 94 percent of the area, with clay about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 22 and FM 1126. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Barry, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Barry near Briar Creek?

Trinity Boring Solutions takes directional boring work in Barry, Navarro County, including water, sewer and fiber routes along 2nd Street. Barry is an incorporated small city, so its streets belong to the city. The Census Bureau Vintage 2024 estimate puts Barry at 246 people. Gas and electric conduit can also be routed along named streets where the project calls for a bore.

Our main office is in Yukon, Oklahoma, and Barry work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe beneath the Arkansas River in Tulsa. That shows the range behind a typical Barry service line near 2nd Street. When planning a Barry crossing on Texas State Highway 22, we draw on our family business, begun in 1965, and directional boring experience since 1982.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Barry and Houston Black soil?

The USDA soil survey maps Houston Black soil across 94 percent of Barry, with Trinity soil across 5 percent. Houston Black clay, on 1 to 3 percent slopes, covers 93 percent of the mapped area. At about 40 inches below the surface, the survey maps clay across 100 percent of Barry and reports an average clay content of 55 percent. Houston Black and Trinity are mapped soil patterns, not test borings, so we verify ground conditions before setting a bore plan. The heavy clay can hold the bore open, but it sticks to tooling and can grip pipe as it swells.

USDA soil survey, inside the Barry city limitsWhat is mapped
Soil series mappedHouston Black 94 percent and Trinity 5 percent
Texture at the surfaceclay 100 percent
Texture about 40 inches downclay 100 percent
Engineering class about 40 inches downfat clay (CH) 100 percent
Average clay content about 40 inches down55 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils5 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The soil survey maps no bedrock within 60 inches of the surface in Barry, but that does not describe conditions below the mapped depth. The geologic map identifies Neylandville and Marlbrook Marls, undivided, a Late Cretaceous claystone unit. No seasonal water table is mapped within 60 inches, while flood prone soils cover 5 percent of the area, including mapped Trinity clay. High steel corrosion risk is mapped across Barry, so the line owner should consider casing and tracer wire materials; HDPE is not subject to that steel concern.

How do we drill Barry clay near Houston Black soil?

In Barry, we plan the bore for the mapped heavy clay, which can stay open but stick to the reamer. Houston Black soil is the main ground condition shaping the drilling sequence.

  1. Houston Black clay can stick to the reamer and swell around pipe, so we use thinner drilling fluid with polymer and ream in stages.
  2. With heavy clay mapped across Barry, we watch fluid returns on a bore near Front Street so pressure does not lift pavement.
  3. Before the drill nears a marked line along 2nd Street, we hydrovac pothole it because locate paint shows position but not depth.
  4. As a bore advances through Barry clay, we track the head from the surface and log depth and pitch at each rod.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Where might a line go under Front Street in Barry?

Texas State Highway 22 has 1.4 mapped roadway miles inside Barry, and FM 1126 has 0.8. A line crossing either route may need a bore beneath the pavement rather than an open cut. Front Street, Blooming Grove Road and Mitchell Road each have 0.3 miles mapped in the city; 2nd Street has 0.25 miles. Because Barry is incorporated, we account for city control on Front Street when coordinating a street bore. The route and street ownership help determine where bore pits can sit outside pavement.

CrossingTypeMapped extentWho has a say
Texas State Highway 22State highway1.4 roadway miles insideState highway office
FM 1126State highway0.8 roadway miles insideState highway office
Briar CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Barry or within one mile outside the city limits, so no local track crossing is identified. No named stream crosses the city, and no street crossing of a named stream is mapped there. Briar Creek is 0.6 miles from the city limits, so a route that reaches it needs separate crossing planning. No lakes or ponds are mapped within one mile of Barry.

Who approves work under Texas State Highway 22 in Barry?

Texas State Highway 22 belongs to the state, so work in its right of way needs a TxDOT utility permit. For Barry, the TxDOT Dallas District reviews the application, and the utility owner submits it through TxDOT’s online RULIS system. We prepare the bore plan and profile for the utility owner’s filing and work under the permit issued to that owner. For a Texas State Highway 22 crossing, we plan boring or tunneling beneath existing pavement to meet TxDOT rules. A route along Front Street instead involves Barry’s city streets, which belong to the city.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Navarro County near Barry?

The City of Barry public water system uses purchased surface water and has 112 service connections serving 336 people. A water bore near 2nd Street should be planned around the system’s existing lines. Oncor Electric Delivery Company and Navarro County Electric Cooperative report electric service in Navarro County; the line owner must be confirmed for the specific address before an electric conduit bore near Front Street.

Line ownerWhat it isSourceSize
City of BarryPublic water systemSurface water bought from another system112 connections, 336 people served
Oncor Electric Delivery Company and Navarro County Electric CooperativeElectric utilities reporting service in Navarro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The ACS 2019 to 2023 five year estimates place Barry’s median housing year at 1958, a planning consideration when we review underground routes. The survey estimates 54 percent of housing was built before 1960, 31 percent from 1960 to 1999 and 15 percent in 2000 or later. That mix can mean a project is replacing older service lines or extending a newer connection along Mitchell Road. Before drilling near marked lines, we hydrovac pothole them; paint shows position, not depth, near the Barry water system and electric routes.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

How far is Barry from Blooming Grove and our Yukon yard?

Barry is in Navarro County at an elevation of 500 feet and covers 0.44 square miles, with ZIP code 75102. Blooming Grove is 4.5 miles west, and Emhouse is 5.6 miles northeast. Corsicana, the county seat and nearest larger city, is 10.3 miles east. Frost lies 9.9 miles west, while Oak Valley is 8.7 miles southeast. The Yukon, Oklahoma main office is 280 road miles away, a 5.7 hour drive. That distance is part of planning mobilization for a bore near Texas State Highway 22.

Places near Barry

Which jobs call for a bore along Mitchell Road in Barry?

  • Highway crossing: A route beneath Texas State Highway 22 uses a bore under the pavement, with the utility owner handling the right of way permit.
  • Water service: A connection near 2nd Street can be bored toward the City of Barry water system after existing lines are exposed.
  • Fiber route: A fiber conduit along Front Street can pass beneath pavement without cutting the street surface.
  • Creek crossing: A route toward Briar Creek, 0.6 miles from Barry’s limits, needs channel depth planning and a jurisdiction check.
  • Street crossing: A service route under Mitchell Road can keep the pavement uncut, with entry and exit pits placed in dirt.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a directional boring quote for Barry near 2nd Street?

For a Barry quote, send the address or map pin, what will go underground, pipe or conduit size, footage and any sketch or plans, especially for a route near 2nd Street. Include whether the path approaches Texas State Highway 22 or Front Street. Those details show where the bore starts and ends and which crossings need to be planned.

The price reflects the route and work involved, not just footage. Houston Black clay affects drilling and reaming; a Texas State Highway 22 crossing adds right of way planning, while concrete or pavement changes pit and restoration needs. We also account for utility exposures, creek or drainage crossings, sand backfill, excavator time and emergency or high profile work. Barry is 280 road miles from Yukon, so mobilization is another job detail.

Questions people ask about boring in Barry

Does Trinity take directional boring jobs in Barry, Navarro County, and who staffs them?

Yes, we take directional boring work in Barry, Navarro County. Our own crews and crews from partner drilling contractors Trinity has vetted can handle the work, with Trinity coordinating from the first call through the bore log. A route near 2nd Street can be planned for water, sewer, gas, electric conduit or fiber.

What ground should I expect for a Barry bore through Houston Black soil?

The USDA soil survey maps Houston Black soil over 94 percent of Barry and clay texture across 100 percent of the area at about 40 inches. The mapped average clay content there is 55 percent. This heavy clay can hold an open bore but stick to tooling, so staged reaming and fluid control matter near Front Street.

Will a directional bore in Barry hit rock near Texas State Highway 22?

Bedrock is not mapped within the top five feet of Barry, but that does not rule out deeper rock near Texas State Highway 22. The geologic map shows Neylandville and Marlbrook Marls, undivided, a Late Cretaceous claystone unit. If deeper conditions change, the bore plan and tooling may need adjustment.

Who handles a Barry bore beneath Texas State Highway 22?

The utility owner applies for the TxDOT utility permit for work in the Texas State Highway 22 right of way. The TxDOT Dallas District reviews that filing through RULIS. We provide the bore plan and profile for the owner’s application and work under the permit issued to the owner.

Can a Barry utility line be bored beneath Briar Creek?

A route beneath Briar Creek can be considered if the route and site conditions support it. The creek is 0.6 miles from Barry’s city limits, not inside them. During planning, we check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction and plan the bore depth to pass below the channel.

Who runs Barry’s public water system, and does it use purchased surface water?

The City of Barry owns its public water system, which uses purchased surface water, so we coordinate proposed bores around water lines. It has 112 service connections serving 336 people. For a bore near 2nd Street, the existing water line location should be confirmed and exposed before drilling near it.

What bore sizes and lengths can Trinity handle for a Barry job near 2nd Street?

For a planned Briar Creek crossing, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The size and route near 2nd Street help determine the equipment and setup. A sketch or plans can clarify the entry and exit points.

How much notice does Texas811 need for a bore near Barry’s Front Street?

For a bore near Front Street, request locates at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. For TxDOT Dallas District work, if the start slips more than 14 days past the original notice, we make a new request. Before work continues on FM 1126, we refresh worn or moved marks through Texas811.

What affects the price of a Barry directional bore near Texas State Highway 22?

The job route and scope determine the price, with no single factor deciding it. Houston Black clay affects drilling, while a Texas State Highway 22 crossing brings permit planning. Other factors include footage, pipe size, utility exposures, pavement, creek or drainage crossings, pits, sand backfill, excavator time and mobilization from Yukon.

Where the Barry facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Barry

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Barry, Texas

Type the address of your job in Barry. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Barry

Same county: Kerens · Rice · Dawson · Mildred · Angus · Eureka · Richland · Navarro · Goodlow · Powell. All counties: Texas county list.