Bristol Texas Directional Boring: Lamar Clay, FM 660 and Smith Creek
Quick Answer: Union Hill Road, Sugar Ridge Road and Andrews Road lead Bristol’s 29.05 public road miles, while FM 660 is the state highway in the mapped community. We take directional boring, also called horizontal directional drilling (HDD), beneath FM 660 and other Bristol routes. From our Yukon, Oklahoma main office, Bristol is 249 road miles away, a distance that shapes mobilization for Sugar Ridge Road work. Lamar soil and clay rich ground can cling to the reamer, so staged reaming helps protect the pipe pull.
Bristol bores at a glance
- Unincorporated community in Ellis County, Texas. Population 714 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 249 miles, about 5.1 hours of driving.
- Ground: Lamar soil is mapped on 23 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 23 percent of the area.
- Highways inside the boundary: FM 660. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Smith Creek and Persimmon Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring along FM 660 in Bristol?
Bristol is an unincorporated community in Ellis County, with 714 residents in the 2020 Census count. We install water, sewer, gas, electric conduit and fiber for routes along Union Hill Road, Sugar Ridge Road and Andrews Road, where a bore can carry service beneath a road or driveway without opening the surface.
Our main office is in Yukon, Oklahoma, and Bristol work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982, with Bristol 249 road miles from our Yukon main office. Four decades of boring experience helps us plan around Bristol’s sticky Lamar clay loam and creek crossings.

What is Bristol ground like to bore in around Lamar soil?
The USDA soil survey maps Lamar as Bristol’s largest soil series, covering 23 percent of the mapped community. Surface texture is clay loam across 34 percent and clay across 27 percent. At about 40 inches below the surface, clay is mapped under 60 percent of the area, and average clay content is 41 percent. Lamar, Heiden, Crockett, and Wilson are mapped soil patterns, not test borings, so we verify conditions before choosing a route. That much clay can stick to a reamer and swell around pipe, so the drilling fluid and reaming plan matter.
| USDA soil survey, inside the Bristol mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Lamar 23 percent, Heiden 18 percent, Crockett 18 percent, Wilson 11 percent and Gasil 8 percent |
| Texture at the surface | clay loam 34 percent, clay 27 percent and fine sandy loam 15 percent |
| Texture about 40 inches down | clay 60 percent, clay loam 23 percent and sandy clay loam 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 58 percent and lean clay (CL) 35 percent |
| Average clay content about 40 inches down | 41 percent |
| Bedrock mapped within 60 inches | 23 percent of the area (0 percent hard rock, 23 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 63 percent of the area |
Weathered bedrock is mapped within 60 inches across 23 percent of Bristol, but hard bedrock is not mapped at that depth. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 4 percent. High steel corrosion risk is mapped under 63 percent of the area, which matters for steel casing and tracer wire; HDPE avoids that soil concern. The Cenozoic Quartz Sand Decomposition Residuum and Late Cretaceous Wolfe City Sand map units point to changing material, so the bore plan should allow for ground transitions.
How do we plan a Bristol crossing through clay loam along FM 660 while accounting for mapped soils?
Bristol’s clay rich soil can hold a hole open, then load the reamer or grip the pipe. Along roads such as Union Hill Road, we match fluid, reaming and pull timing to the mapped ground.
- Because clay is mapped under 60 percent of Bristol at about 40 inches, we use fluid suited to sticky ground and ream in stages.
- Where Bristol’s heavy clay can load the reamer, we watch fluid returns and pressure so the drilling does not lift pavement along Union Hill Road.
- We have the pipe ready before the last ream near Sugar Ridge Road, then pull it the same day to limit the time clay can grip it.
- At marked utilities near FM 660 or Smith Creek, we hydrovac pothole before drilling close, then track the head and log its depth and pitch.

Which roads, tracks or creeks could a Bristol bore cross near Union Hill Road?
FM 660 is the state highway mapped inside Bristol, with 3.5 roadway miles in the community. Among the named roads, Union Hill Road runs 3.13 miles, Sugar Ridge Road 1.75 miles, and Andrews Road and Andrew’s Road each run 1.74 miles. Old Gin Road and Burl Moore Road are also mapped routes. Those local roads can call for a bore beneath pavement or a driveway, while an FM 660 crossing needs a plan that fits TxDOT requirements.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 660 | State highway | 3.5 roadway miles inside | State highway office |
| Smith Creek | Stream | 2.23 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Persimmon Creek | Stream | 1.31 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Bolivar Branch | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Red Oak Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Grove Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Bristol or within one mile outside the mapped community boundary, and none of the mapped street and rail crossings are identified. Smith Creek runs 2.23 channel miles inside the community, while Persimmon Creek runs 1.31 miles; three mapped street crossings intersect named streams. A route near either creek needs a channel focused depth plan, and creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning. We account for Smith Creek and Persimmon Creek when planning routes, although no lakes or ponds are mapped within one mile.
Who has to sign off on a Bristol bore in Ellis County?
Bristol has no city government, so its local streets are not handled by a city office. For work in the right of way of FM 660, the utility owner applies through TxDOT’s online RULIS system, and the TxDOT Dallas District reviews it; Trinity provides the bore plan and profile for the owner’s application. For pavement crossings in Bristol, we follow TxDOT Dallas District rules calling for boring or tunneling beneath existing highway pavement. Electric and communication crossings need 60 inches of cover below the lowest point of the crossed grade, unless the district sets a different depth. Smith Creek crossings are checked for federal water jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities need checking before a Bristol bore in Ellis County?
EPA drinking water records do not tie water systems to towns, and no system carries Bristol’s name, so the provider for a specific address cannot be matched from those records. Confirm the water provider with Ellis County or the local water district before planning a bore near Union Hill Road or Smith Creek. Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service report electric service in the county; we confirm the line owner for the address before a conduit bore. Hydrovac potholing helps expose marked water and electric lines before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, HILCO Electric Cooperative, Navarro County Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Ellis County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Bristol’s median housing year at 1985: 5 percent of homes were built before 1960, 62 percent from 1960 to 1999, and 33 percent in 2000 or later. A bore along Sugar Ridge Road could serve a replacement line or a newer service, so the route and existing utilities need checking. Texas811 marks show position, not depth, and we pothole marked lines before the drill approaches.

How far is Bristol from Ennis and the Yukon yard?
Bristol is an unincorporated census designated place in Ellis County, with 5.78 square miles of land and an elevation of 460 feet. Its ZIP code is 75119. Palmer is 6.0 miles west, Rosser is 6.8 miles east, Garrett is 7.0 miles southwest, and Ferris is 8.9 miles northwest. Ennis, the nearest larger city, is 9.1 miles southwest; Waxahachie, the county seat, is 16.4 miles west. The Yukon main office is 249 road miles away, a 5.1 hour drive, which affects crew mobilization for work along FM 660.
Places near Bristol
- Directional boring in Palmer: 6 miles west
- Directional boring in Rosser: 6.8 miles east
- Directional boring in Garrett: 7 miles southwest
- Directional boring in Ferris: 8.9 miles northwest
- Directional boring in Ennis: 9.1 miles southwest
Which jobs call for a bore near Sugar Ridge Road in Bristol?
- Highway crossing: A route beneath FM 660 needs a bore plan that addresses TxDOT pavement and right of way requirements.
- Road service: Water or sewer along Sugar Ridge Road can be bored beneath pavement or a driveway to avoid an open cut.
- Fiber conduit: A conduit route near Union Hill Road needs marked utilities exposed before the drill approaches them.
- Creek crossing: A line crossing Smith Creek needs a channel focused depth plan and a check for federal water jurisdiction.
- Electric conduit: Before a route near Andrews Road is planned, we confirm the electric line owner for the specific address.
- Replacement line: Along Old Gin Road, a replacement service can be bored around marked utilities after potholing confirms their depth.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Bristol bore near Smith Creek?
A map pin matters near Smith Creek because the exact route can change whether a bore crosses the channel or follows a road. For a Bristol quote, send the address or pin, what will go underground, and the pipe or conduit size and footage. A sketch or plans help us see the route near FM 660 or Union Hill Road.
Ground, crossings and logistics all shape the work. Bristol’s clay rich Lamar soil can add reaming and fluid control; a crossing beneath FM 660 brings TxDOT requirements, while Smith Creek adds a water crossing to plan. Pipe size, bore length, utility exposure, pavement, pits and excavator time also matter. The 249 road miles from Yukon affect mobilization, and emergency timing or a high profile route can change the work plan.
Questions people ask about boring in Bristol
Does Trinity take directional boring work in Bristol, Ellis County, and who staffs it?
Yes. Trinity takes directional boring work in Bristol and across Texas. We handle the job with our own crews or crews from partner drilling contractors we have vetted, while you work with Trinity from the first call through the bore log. For a route along Union Hill Road, we plan the crew and equipment around the proposed bore.
How does Bristol housing age along Sugar Ridge Road affect replacement bores?
Bristol’s American Community Survey 2019 to 2023 estimates show a median housing year of 1985, with 62 percent of homes built from 1960 to 1999. That mix can mean a project replaces an older service or extends a newer one. Along Sugar Ridge Road, the address and route help us check which marked lines must be exposed before drilling.
Does Lamar soil in Bristol corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 63 percent of Bristol, so the line owner should consider the material and protection for steel casing or tracer wire. HDPE does not have the same soil corrosion concern. A route through Lamar soil near Union Hill Road still needs its exact ground and utility conditions reviewed.
What ground will a bore pass through in Bristol near Lamar soil?
The USDA soil survey maps Lamar as 23 percent of Bristol’s soil series and clay under 60 percent of the area at about 40 inches. Average clay content at that depth is 41 percent. Those mapped patterns suggest sticky ground that can cling to a reamer, so a bore near Sugar Ridge Road may need staged reaming and careful fluid control.
Is there rock under Bristol, and how much is mapped within five feet?
Weathered bedrock is mapped within 60 inches across 23 percent of Bristol, but hard bedrock is not mapped at that depth. The Cenozoic Quartz Sand Decomposition Residuum and Late Cretaceous Wolfe City Sand map units also describe changing materials. A bore near FM 660 should be planned for transitions rather than assuming the whole route is uniform.
Who approves a bore under FM 660 in Bristol, and which state office reviews it?
TxDOT handles a bore in FM 660 right of way, with review by the TxDOT Dallas District. The utility owner files through RULIS, while Trinity prepares the bore plan and profile for that application. Existing highway pavement is crossed by boring or tunneling, and the permit can set project specific conditions.
How far is Bristol from Trinity’s Yukon office, and does Ennis change the job?
Bristol is 249 road miles and a 5.1 hour drive from the Yukon main office. Ennis is 9.1 miles southwest of Bristol, but the Yukon distance still affects mobilization for work near Smith Creek or FM 660. The route, equipment and crew needs help determine how that travel affects the project.
How much Texas811 notice is needed for a bore along Union Hill Road in Bristol?
Texas law requires the locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. In Ellis County, Texas811 describes that as at least two working days, which we include when scheduling underground work. If work along Union Hill Road slips more than 14 days past the original notice, request a new ticket; worn or moved marks must be refreshed before work continues.
What affects the cost of a directional bore under FM 660 in Bristol?
The scope sets the price: bore length and pipe size, Bristol’s clay rich ground, utility crossings, pavement, potholing, pits and excavator time all matter. An FM 660 crossing adds highway planning, and a Smith Creek route may add water crossing work. Mobilization from the Yukon office also matters, as can emergency timing or a high profile job.
Where the Bristol facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Bristol
- U.S. Census Bureau, TIGER/Line 2024: Bristol boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Bristol population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Bristol housing units and year built
- Macrostrat geologic map compilation: map units under Bristol
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Ellis County
- U.S. Geological Survey, Elevation Point Query Service: Bristol elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Bristol
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Bristol
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Bristol, Texas
Type the address of your job in Bristol. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Bristol
Same county: Waxahachie · Midlothian · Red Oak · Glenn Heights · Ovilla · Italy · Oak Leaf · Maypearl · Venus · Milford · Pecan Hill · Bardwell. All counties: Texas county list.