Directional Boring Contractors in Palo Pinto County, TX
Trinity Boring Solutions is a directional boring contractor serving Palo Pinto County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Palo Pinto, Mineral Wells, Graford, Strawn, Gordon and Mingus. From the Trinity main office in Yukon, Oklahoma it is about 241 road miles south to Palo Pinto, the county seat. The usual crossings in Palo Pinto County are Interstate 20 and US 180, the Brazos River and Union Pacific track. Call (405) 409-7423 any time.
Free Bore Planner
Plan Your Bore in Palo Pinto County, Texas
Type the address of your job in Palo Pinto County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
What Should You Know Before Boring in Palo Pinto County?
Palo Pinto County covers 953 square miles, has about 30,231 residents and sits in the TxDOT Fort Worth District.
| County seat | Palo Pinto |
|---|---|
| Population | 30,231 (2024 Census estimate), up 6.4% since 2020 |
| Land area | 953 square miles |
| Largest cities and towns | Mineral Wells (15,508), Graford (729), Strawn (571), Gordon (495) and Mingus (242) |
| TxDOT district | TxDOT Fort Worth District |
| 811 center | Texas811 (call 811), two working days of notice |
| Electric utilities | Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative Service |
| Interstate and US highways | Interstate 20, US 180 and US 281 |
| State Highways | 16, 108, 193, 254 and 337 |
| State loops and spurs | Loop 533 |
| Rivers | Brazos River |
| Creeks and other streams | Palo Pinto Creek, Turkey Creek, Buck Creek, Big Sunday Creek, Elm Creek, Dark Valley Creek, Eagle Creek and Keechi Creek |
| Lakes | Possum Kingdom Lake and Lake Palo Pinto |
| Railroads | Union Pacific, about 37 main line miles |
| Average precipitation | 32.2 inches a year (1991 to 2020) |
| New housing units permitted | 22 in 2025 |
| Road distance from Trinity main office | About 241 miles from Yukon, Oklahoma to Palo Pinto |
| Trinity insurance | General liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability |
Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.
What Does a Bore Have to Cross in Palo Pinto County?
A bore in Palo Pinto County most often has to cross a highway such as Interstate 20, US 180 or US 281, a stream such as the Brazos River, Palo Pinto Creek or Turkey Creek and Union Pacific track. State Highways 16, 108, 193, 254 and 337 also run through the county, along with Loop 533. The Census map names 25 larger streams in Palo Pinto County, led by the Brazos River, Palo Pinto Creek, Turkey Creek, Buck Creek, Big Sunday Creek and Elm Creek. The rest are Dark Valley Creek, Eagle Creek, Keechi Creek, Barton Creek, East Fork Keechi Creek, Worser Creek, Bills Creek, Little Keechi Creek, Rock Creek, Harris Branch, Whatley Creek, North Fork Palo Pinto Creek, Mill Branch, Salt Branch, Pollard Creek, Little Sunday Creek, Bluff Creek, Town Branch and Wolf Branch. Possum Kingdom Lake and Lake Palo Pinto are the main mapped lakes. The federal rail map shows about 37 miles of main line track in Palo Pinto County, owned by Union Pacific.

What Is the Ground Like for Directional Boring in Palo Pinto County?
Rock is the main thing to plan for in Palo Pinto County: the federal soil survey records bedrock within five feet of the surface on about 67 percent of the county, a mix of hard and soft, weathered rock. Depth to rock in Palo Pinto County is confirmed by potholing before the rig is set, and rock tooling is loaded when the path cannot avoid it. May is the wettest month in Palo Pinto County at 4.2 inches on average and January the driest at 1.6. Palo Pinto County averages 32.2 inches of precipitation a year, so rain delays are occasional.
- Most common soils: Palopinto (11%), Set (10%) and Hensley (9%).
- Surface texture: most often very stony clay loam (19%) or fine sandy loam (17%).
- Bedrock within 5 feet: about 67% of the county. It is a mix of hard rock and softer weathered rock.
- Clay rich layer (35% clay or more) in the top 5 feet: about 59% of the county.
- Sandy layer (70% sand or more) in the top 5 feet: about 9% of the county.
- Gravelly, cobbly or stony surface soil: about 34% of the county.
Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Palo Pinto County, Texas (survey area TX363, version 23, September 3, 2026), through Web Soil Survey. Percentages are shares of mapped county area.
Who Permits a Bore in Palo Pinto County?
The TxDOT Fort Worth District permits bores under state highways in Palo Pinto County, the Palo Pinto County Commissioners Court handles county roads, and Mineral Wells, Graford and Strawn each handle their own streets.
- State highways. Interstate 20, US 180, US 281, the other numbered state routes and the farm to market roads in Palo Pinto County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
- Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
- Railroads. A bore under Union Pacific track in Palo Pinto County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
- Water crossings. A bore under the Brazos River, Palo Pinto Creek or Possum Kingdom Lake is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.
Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.
Which Electric Utilities Serve Palo Pinto County?
Oncor Electric Delivery Company, Texas-New Mexico Power, Tri-County Electric Cooperative and United Electric Cooperative Service serve Palo Pinto County, according to 2025 filings with the U.S. Energy Information Administration. Oncor Electric Delivery Company and Texas-New Mexico Power are investor owned utilities; Tri-County Electric Cooperative and United Electric Cooperative Service are member owned cooperatives. The owner of the line sets the conduit size, depth and inspection steps, so it is confirmed before a conduit bore in Palo Pinto County is planned. More on electric line boring for electric cooperatives.
How Much New Construction Is There in Palo Pinto County?
Palo Pinto County permitted 22 new housing units in 2025, all single family homes, according to the Census Bureau Building Permits Survey. The population of Palo Pinto County went from 28,408 in 2020 to 30,231 in 2024, a gain of 6.4 percent. In Palo Pinto County that means steady work on service lines, rural extensions and road crossings.
Which Cities and Towns in Palo Pinto County Does Trinity Serve?
Trinity takes directional boring work in all 5 incorporated places in Palo Pinto County and at sites outside city limits, and Mineral Wells is the largest with about 15,508 residents.
| City or town | 2024 population |
|---|---|
| Mineral Wells | 15,508 |
| Graford | 729 |
| Strawn | 571 |
| Gordon | 495 |
| Mingus | 242 |
Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Palo Pinto County.
Palo Pinto County borders Eastland County, Erath County, Hood County, Jack County, Parker County, Stephens County and Young County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Eastland (Eastland), Stephenville (Erath), Granbury (Hood), Jacksboro (Jack), Weatherford (Parker), Breckenridge (Stephens) and Graham (Young).
Which Directional Boring Services Are Available in Palo Pinto County?
Every Trinity service is available in Palo Pinto County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.
- Road, highway, railroad, creek and river bore crossings, including Interstate 20, US 180 and the Brazos River
- Bores under Union Pacific track, built to the railroad boring requirements of the owner
- Drinkable water line boring and sewer force mains in Mineral Wells or Graford and on rural water systems
- Underground conduit in Oncor Electric Delivery Company and Texas-New Mexico Power territory, see electric line boring
- Fiber optic boring for ISPs and broadband builders along Interstate 20
- Municipal boring services for cities such as Mineral Wells, Graford and Strawn
The free Bore Planner sizes a Palo Pinto County job before you call.
Palo Pinto County Directional Boring FAQs: What Do Customers Ask?
Does Trinity Boring Solutions work in Palo Pinto, Texas?
Yes. Trinity Boring Solutions takes work in Palo Pinto, Mineral Wells, Graford, Strawn, Gordon and Mingus and the rural parts of Palo Pinto County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.
Who approves a bore under Interstate 20 in Palo Pinto County?
The TxDOT Fort Worth District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Palo Pinto County Commissioners Court and city streets through the city.
Is there rock in Palo Pinto County?
Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 67 percent of Palo Pinto County, a mix of hard and soft, weathered rock. Potholing confirms it on the actual bore path.
Can a line be bored under the Brazos River in Palo Pinto County?
Yes. A drill is steered below the bed of the Brazos River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.
Which railroads have track in Palo Pinto County?
Union Pacific, with about 37 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.
Is Trinity insured for work in Palo Pinto County?
Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.
How much does directional boring cost in Palo Pinto County?
The footage and the pipe size give a general range to start from. Depth, the crossings and the ground set the number, and rock is a factor on many Palo Pinto County jobs.
How Do You Get a Bore Quote in Palo Pinto County?
Call (405) 409-7423 any time or send the address in Palo Pinto County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.